← Back
Elevator cooperative
41-15 45 STREET
QUEENS · BIN 4430582
💬 Discuss this project
1943Year Built
6Stories
D4Building Class
R7AZoning
250,000 sfGross Floor Area
320Units
LL97 CoveredRent Stabilized47 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: SUNNYSIDE OWNERS CORP · 66,800 sf lot · 3.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 1 filing · 4 docs
Cellar5p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RENNON CONSTRUCTION503/22/2026
SUPERIOR REALTY GROUP203/22/2026
SUNNYSIDE OWNERS1303/22/2026
SUNNYSIDE OWNERS CORO C/O103/22/2026
BKL MGMT CO/BRET LAURIE103/22/2026
SKYWORX CONTRACTING INC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC210/14/2024
SPAR UNLIMITED LLC110/08/2024
CHUN ENGINEERING CONSULTANT PLLC305/30/2023
ASHRAF CORP105/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
A W R GROUP INCGeneral Contractor307/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor203/21/2026
IRVING BAPTISTEElectrical103/21/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
MASTER TECH PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPAR UNLIMITED LLC5967110/08/2024
M. INT'L ENGINEERING PLLC3129205/30/2023
DAL H CHUN ENGINEER PC1972105/03/2022
Building Lifecycle
All (95)Filed (7)Permit Issued (7)Signed Off (3)Violation (60)Inspection (6)Special Inspection (12)
07/25/2026
Violation issued (HPD, open)
B
07/25/2026
Violation issued (HPD, open)
B
06/08/2026
Permit issued — General Construction
Q00883356-I1-GC-CX
05/07/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
C
11/26/2025
Violation issued (HPD, closed)
B
10/07/2025
Permit issued — Structural
Q00883356-I1-GC-CX
08/01/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01105451-I1
02/26/2025
Signed off — Alteration
FILING TO ADDRESS ECB VIOLATION 39036116J AND DOB VIOLATION 051221AEUHAZ100409. INSTALL WASHER AND DRYERS WITH SPRINKLERS IN THE CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00682577-I1
01/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/13/2025
Permit issued — Plumbing
Q00682577-I1-EW-SP
11/13/2024
Permit issued — General Construction
Q00883356-I1-GC-CX
10/14/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01105451-P1
10/08/2024
Filed — Alteration
Replacement of the existing entryway portico assembly including the decking, parapet, roofing and ornament. No structural concrete work. No change to egress of occupancy. No interior work.
Q00883356-I1
09/07/2024
Violation issued (HPD, closed)
A
09/07/2024
Violation issued (HPD, closed)
A
09/05/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01105451-I1
09/05/2024
Permit issued — Sidewalk Shed
Q01105451-I1-SH
09/02/2024
Violation issued (HPD, closed)
A
09/02/2024
Violation issued (HPD, open)
B
09/02/2024
Violation issued (HPD, open)
B
09/02/2024
Violation issued (HPD, open)
B
09/02/2024
Violation issued (HPD, open)
B
09/02/2024
Violation issued (HPD, closed)
A
09/02/2024
Violation issued (HPD, open)
C
09/02/2024
Violation issued (HPD, open)
C
09/02/2024
Violation issued (HPD, open)
B
09/02/2024
Violation issued (HPD, open)
B
09/02/2024
Violation issued (HPD, open)
B
09/02/2024
Violation issued (HPD, open)
B
09/02/2024
Violation issued (HPD, open)
B
06/17/2024
Violation issued (HPD, closed)
C
05/30/2024
Violation issued (HPD, closed)
C
05/30/2024
Violation issued (HPD, closed)
A
05/30/2024
Violation issued (HPD, closed)
B
05/30/2024
Violation issued (HPD, closed)
A
06/01/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
05/30/2023
Filed — Alteration
FILING TO ADDRESS ECB VIOLATION 39036116J AND DOB VIOLATION 051221AEUHAZ100409. INSTALL WASHER AND DRYERS WITH SPRINKLERS IN THE CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00682577-P2
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
05/30/2023
Special inspection requirement — Post-installed Anchors
JAMES CHUN
05/30/2023
Special inspection requirement — Sprinkler Systems
JAMES CHUN
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
05/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
05/23/2023
Special inspection requirement — Post-installed Anchors
NANIK MASSAND
05/23/2023
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
05/23/2023
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
05/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2023
Violation issued (HPD, closed)
C
03/22/2023
Filed — Alteration
FILING TO ADDRESS ECB VIOLATION 39036116J AND DOB VIOLATION 051221AEUHAZ100409. INSTALL WASHER AND DRYERS WITH SPRINKLERS IN THE CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00682577-P1
03/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
03/20/2023
Special inspection requirement — Post-installed Anchors
NANIK MASSAND
03/20/2023
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
03/20/2023
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
03/07/2023
Violation issued (HPD, closed)
C
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA W R GROUP INC06/08/2026
DOB NOWStructuralPermit IssuedA W R GROUP INC10/07/2025
DOB NOWPlumbingSigned-offSAFETY FIRE SPRINKLER CORP01/13/2025
DOB NOWGeneral ConstructionPermit IssuedA W R GROUP INC11/13/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/05/2024
DOB NOWPlumbingSigned-offMASTER TECH PLUMBING LLC07/06/2022
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP05/28/2021
BISOTISSUEDMASCON RESTORATION LLC08/09/2012
BISEQISSUEDSKYWORX CONTRACTING INC07/27/2012
BISOTISSUEDMASCON RESTORATION INC03/12/2012
BISBLISSUEDABILENE, INC07/15/2003
BISOTRE-ISSUEDAPOLLON WATERPROOFING CO.07/22/1993
BISEQRE-ISSUEDAPOLLON WATERPROOFING CO.07/22/1993
2 projects · most recent 09/12/2024
FiledStatusContractorScope
09/12/2024CompleteBOROWIDE ELECT'L CONTR'S—
05/28/2021Permit IssuedHIGH QUALITY ELECTRIC OF—
1 project · most recent 10/08/2024
Steel
FiledStatusContractorScope
10/08/2024Permit IssuedA W R GROUP INCSteel
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/01/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
05/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2022Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/30/2023Fire-Resistant Penetrations and JointsJAMES CHUNspecial
05/30/2023Post-installed AnchorsJAMES CHUNspecial
05/30/2023Sprinkler SystemsJAMES CHUNspecial
05/30/2023Energy Code Compliance InspectionsJAMES CHUNprogress
05/23/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
05/23/2023Post-installed AnchorsNANIK MASSANDspecial
05/23/2023Sprinkler SystemsNANIK MASSANDspecial
05/23/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
03/20/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
03/20/2023Post-installed AnchorsNANIK MASSANDspecial
03/20/2023Sprinkler SystemsNANIK MASSANDspecial
03/20/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00530325-I1Request digital key ↗
08/25/2026Q00682577-P2Request digital key ↗
08/25/2026Q00682577-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
01/08/2014420924307Open ↗
08/13/2012420462127Open ↗
07/31/2012420598570Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
11/21/2013420924307Open ↗
07/31/2012420598570Open ↗
07/22/2011420462127Open ↗
▸Seals & Professional Certifications24
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/04/2014420924307Open ↗
11/22/2013420924307Open ↗
11/21/2013420924307Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q00682577-P2Open ↗
08/25/2026Q00682577-P1Open ↗
08/25/2026Q00682577-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q00682577-P1Open ↗
08/26/2026Q00682577-I1Open ↗
08/25/2026Q00682577-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026Q00682577-P1Open ↗
08/26/2026Q00682577-I1Open ↗
08/25/2026Q00682577-P2Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/21/2013420924307Open ↗
07/31/2012420598570Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/21/2013420924307Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/31/2012420598570Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q00682577-P2Open ↗
08/25/2026Q00682577-P1Open ↗
08/25/2026Q00682577-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/22/2011420462127Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/21/2013420924307Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026Q00883356-I1Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS2
02/04/2014420924307Open ↗
07/08/2013420462127Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/21/2013420924307Open ↗
▸Approvals, Objections & Sign-offs6
▸BISADMINISTRATIVE OBJECTIONS3
11/21/2013420924307Open ↗
07/31/2012420598570Open ↗
07/22/2011420462127Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/06/2014420924307Open ↗
07/15/2013420462127Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/15/2013420462127Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
02/04/2014420924307Open ↗
11/21/2013420924307Open ↗
07/08/2013420462127Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
11/21/2013420924307Open ↗
07/31/2012420598570Open ↗
07/22/2011420462127Open ↗