BuildNYC
Elevator cooperative
41 5TH AVENUE
MANHATTAN · Greenwich Village · BIN 1009252
💬 Discuss this project
1923Year Built
15Stories
D4Building Class
R10Zoning
95,117 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized16 Active Violations 13 unresolved · 3 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: 41 Fifth Owners · 7,650 sf lot · 12.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTemporary pipe scaffold installation2 filings
PenthouseDemolition, wall construction, window repair, fireplace repl5p · 1 filing · 12 docs
Floor 16Unit 16D3 filings · 18 docs
Floor 15Unit 15A, Unit 15E, Unit 16EUnder Construction1p · 4 filings · 20 docs
Floor 14Unit 14D, Unit 14E4 filings · 15 docs
Floor 13
Floor 12Unit 12F2 filings · 13 docs
Floor 11Unit 11B1 filing · 9 docs
Floor 10
Floor 9Unit 9B, Unit 9EUnder Construction3 filings · 19 docs
Floor 8Unit 8B, Unit 8C1p · 3 filings · 15 docs
Floor 7
Floor 6
Floor 5Unit 5A, Unit 5D2p · 2 filings · 20 docs
Floor 4
Floor 3Unit 3FUnder Construction6p · 1 filing · 20 docs
Floor 2
Floor 1
CellarPlumbing work and fixture installation1 filing · 6 docs
Site & exteriorProposed pipe scaffold installationUnder Construction2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
41 Fifth Owners9003/22/2026
41 5Thownerscorpc Omaxwellkates1003/21/2026
Roc-Century Associates703/21/2026
Spine Rehab Group603/21/2026
41 Fifth O303/21/2026
41 Fifth Cooperation203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M Hashas1203/21/2026
Youber Design803/21/2026
Code403/21/2026
Socotec403/21/2026
EDG203/21/2026
Boutiqkey603/21/2026
Kit Middleton Architect P603/21/2026
AE Design Solution403/21/2026
Big Orange Expediting403/21/2026
KM Associates of New York103/21/2026
Codegreen303/21/2026
Howard L Zimmerman Architects203/21/2026
Artwin Construction203/21/2026
Oams Architectural Design203/21/2026
K & M Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empire NY InstallationsScaffold607/08/2026
Homeline ConstructionGeneral Contractor603/21/2026
Freedom GSGeneral Contractor507/08/2026
Romel ConstructionGeneral Contractor403/21/2026
MTK ContractingGeneral Contractor407/08/2026
Rauch Design BuildGeneral Contractor303/21/2026
Aqueduct MechanicalPlumbing307/08/2026
HV ElectricElectrical203/21/2026
Builtech AssociatesGeneral Contractor203/21/2026
A.M.NPlumbing207/08/2026
Bronxdale ElectricElectrical203/22/2026
Accurate MechanicalPlumbing207/08/2026
P Bontempi CostructionGeneral Contractor210/10/2026
Building Code PartnersGeneral Contractor208/27/2026
Full Circle PlumbingPlumbing107/31/2026
Liquid Plumbing & Heating SCSPlumbing107/08/2026
R & G MechanicalPlumbing107/08/2026
Alef Electrical ContractingElectrical103/22/2026
Xpress Plumbing and HeatingPlumbing107/08/2026
Bestco General Electric MaintenanceElectrical103/21/2026
Citywide Electrical WiringElectrical103/21/2026
AL-Wes Electric ServicesElectrical103/21/2026
Kontorouhas EmanuelElectrical103/21/2026
Megaris Electrical ContgElectrical103/21/2026
Big Apple Designs and EnvironmentalGeneral Contractor107/08/2026
Castro RenovationsGeneral Contractor107/08/2026
Linden Marshall ContractingGeneral Contractor107/08/2026
Phoenix Sutton STRScaffold107/08/2026
Budget Plumbing & HeatingPlumbing107/08/2026
Demar MechanicalPlumbing107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519910/06/2026
Jean-Luc Briguet Architects6972106/03/2026
Shahrish Shuvo Engineering8524306/02/2026
Piro Studio7503204/28/2026
Quality Testing7344404/01/2026
Sustainable Design Engineering1404203/12/2026
Howard L Zimmerman Architects1712102/06/2026
Rauch Architecture7888401/06/2025
IP Concrete Testing and I6252106/13/2024
Emilio Susa Architect3605209/26/2023
Crosscheck Inspection Services544206/23/2023
Glickman Schlesinger Architects6768306/23/2023
Ryan Special Engineering2018101/10/2023
Hamann Engineering4949107/08/2021
Kris Kozlowski Architect3955102/22/2021
Building Lifecycle
All (296)Filed (47)Permit Issued (38)Signed Off (13)Facade (FISP) (13)Violation (60)Inspection (27)Objection (68)Special Inspection (30)
10/09/2026
Permit issued — General Construction
M01208902-I1-GC
10/06/2026
Filed — Alteration
HEREWITH FILING FOR THE INTERIOR RENOVATIONS OF APARTMENT #16D IN THIS EXISTING FIFTEEN STORY BUILDING WITH CELLAR
M01470360-S1
10/06/2026
Filed — Alteration
HEREWITH FILING FOR THE INTERIOR RENOVATIONS OF APARTMENT #16D IN THIS EXISTING FIFTEEN STORY BUILDING WITH CELLAR
M01470360-I1
10/06/2026
Special inspection requirement — Air barrier - visual inspection
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Air barrier — testing
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Metering
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Final
10/06/2026
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/06/2026
Special inspection requirement — Permanent certificate
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Permanent certificate
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Insulation placement and R values
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/06/2026
Special inspection requirement — Metering
MOHAMED MAHMOUD
10/06/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
09/14/2026
Filed — Alteration
M01412503-S1
08/26/2026
Permit issued — General Construction
M01388225-I1-GC
08/20/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
07/30/2026
Permit issued — Plumbing
M01388225-S1-PL
07/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/08/2026
Special inspection requirement — Final
Shahrish Shuvo
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/03/2026
Filed — Alteration
PARTIAL DEMOLITION OF EXISTING AND CONSTRUCTION OF NON-LOAD BEARING WALLS. EXISTING BAY WINDOWS WILL BE REPAIRED AS REQUIRED. REPLACEMENT OF THE EXISTING FIREPLACE AND FLUE. (TOTAL APT SQ IS 600 SF)
M01408322-I1
06/03/2026
Filed — Alteration
PARTIAL DEMOLITION OF EXISTING AND CONSTRUCTION OF NON-LOAD BEARING WALLS. EXISTING BAY WINDOWS WILL BE REPAIRED AS REQUIRED. REPLACEMENT OF THE EXISTING FIREPLACE AND FLUE. (TOTAL APT SQ IS 600 SF)
M01408322-S1
06/02/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 9B ON THE 009 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01208902-P1
05/29/2026
Special inspection requirement — Lighting in dwelling units
Jean-Luc Briguet
05/29/2026
Special inspection requirement — Interior lighting power
Jean-Luc Briguet
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jean-Luc Briguet
05/27/2026
Special inspection requirement — Final
Jean-Luc Briguet
05/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/06/2026
Permit issued — General Construction
M01388225-I1-GC
05/05/2026
Permit issued — General Construction
M01277794-I1-GC
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
05/05/2026
Special inspection requirement — Final
Shahrish Shuvo
05/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
05/04/2026
Signed off — Alteration
PLUMBING FOR THE THE RENOVATION OF EXISTING APARTMENT 5A ON THE FIFTH FLOOR. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01166990-S2
04/30/2026
Signed off — Alteration
PLUMBING FOR THE THE RENOVATION OF EXISTING APARTMENT 5A ON THE FIFTH FLOOR. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01166990-S1
04/29/2026
Signed off — Alteration
PLUMBING FOR THE THE RENOVATION OF EXISTING APARTMENT 5A ON THE FIFTH FLOOR. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01166990-I1
04/29/2026
Permit issued — Plumbing
M01277794-S1-PL
04/28/2026
Filed — Alteration
Plumbing fixture modifications related to the renovation of apartment 15A.
M01388225-I1
04/28/2026
Filed — Alteration
Plumbing fixture modifications related to the renovation of apartment 15A.
M01388225-S1
04/24/2026
Special inspection requirement — Lighting in dwelling units
PIETRO ROSATO
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
04/14/2026
Permit issued — Supported Scaffold
M01382734-I1-SF
04/13/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01382734-I1
04/01/2026
Filed — Alteration
PLUMBING FOR THE THE RENOVATION OF EXISTING APARTMENT 5A ON THE FIFTH FLOOR. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01166990-P1
03/16/2026
Permit issued — General Construction
M01277794-I1-GC
03/12/2026
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 3F ON THE 3RD FLOOR. WORK WILL INCLUDE A NEW KITCHENETTE AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01277794-P1
03/12/2026
Permit issued — Plumbing
M01274624-I1-PL
03/11/2026
Filed — Alteration
GENERAL CONSTRUCTION TO RENOVATE APT 3F ON THE 3RD FLOOR. WORK WILL INCLUDE A NEW KITCHENETTE AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01277794-P2
02/13/2026
Permit issued — Plumbing
M01208902-S1-PL
Latest 60 of 296 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedP Bontempi Costruction10/09/2026
DOB NOWGeneral ConstructionPermit IssuedBuilding Code Partners08/26/2026
DOB NOWPlumbingPermit IssuedFull Circle Plumbing07/30/2026
DOB NOWGeneral ConstructionPermit IssuedBuilding Code Partners05/06/2026
DOB NOWGeneral ConstructionPermit IssuedBig Apple Designs and Environmental05/05/2026
DOB NOWPlumbingPermit IssuedBudget Plumbing & Heating04/29/2026
DOB NOWSupported ScaffoldPermit IssuedPhoenix Sutton STR04/14/2026
DOB NOWGeneral ConstructionPermit IssuedMTK Contracting03/16/2026
DOB NOWPlumbingPermit IssuedDemar Mechanical03/12/2026
DOB NOWPlumbingPermit IssuedDPH Plumbing & Heating02/13/2026
DOB NOWGeneral ConstructionPermit IssuedP Bontempi Costruction01/28/2026
DOB NOWGeneral ConstructionPermit IssuedMTK Contracting12/09/2025
DOB NOWPlumbingPermit IssuedLiquid Plumbing & Heating SCS12/08/2025
DOB NOWPlumbingSigned-offXpress Plumbing and Heating05/07/2025
DOB NOWGeneral ConstructionSigned-offRomel Construction05/01/2025
DOB NOWMechanical SystemsSigned-offRomel Construction05/01/2025
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS02/28/2025
DOB NOWPlumbingSigned-offAqueduct Mechanical11/15/2024
DOB NOWGeneral ConstructionSigned-offRauch Design Build07/15/2024
DOB NOWGeneral ConstructionSigned-offFreedom GS10/26/2023
DOB NOWPlumbingSigned-offAqueduct Mechanical10/23/2023
DOB NOWGeneral ConstructionSigned-offBuiltech Associates09/27/2023
DOB NOWGeneral ConstructionSigned-offFreedom GS08/14/2023
DOB NOWPlumbingSigned-offAqueduct Mechanical07/31/2023
DOB NOWMechanical SystemsSigned-offCastro Renovations01/31/2023
DOB NOWPlumbingSigned-offR & G Mechanical01/06/2023
DOB NOWPlumbingPermit IssuedA.M.N07/11/2022
DOB NOWGeneral ConstructionPermit IssuedHomeline Construction07/01/2022
DOB NOWPlumbingPermit IssuedAnthony Disabato03/11/2022
DOB NOWGeneral ConstructionSigned-offFreedom GS10/29/2021
DOB NOWPlumbingPermit IssuedA.M.N10/22/2021
DOB NOWGeneral ConstructionPermit IssuedHomeline Construction07/23/2021
DOB NOWGeneral ConstructionSigned-offLinden Marshall Contracting03/05/2021
DOB NOWSidewalk ShedPermit IssuedEmpire NY Installations I02/12/2021
DOB NOWSupported ScaffoldPermit IssuedEmpire NY Installations I02/10/2021
DOB NOWSupported ScaffoldPermit IssuedEmpire NY Installations I11/19/2020
DOB NOWPlumbingSigned-offAnthony Disabato03/04/2020
DOB NOWSidewalk ShedPermit IssuedEmpire NY Installations I02/14/2020
BISOTISSUEDDemari Services03/24/2021
BISOTISSUEDDemari Services02/08/2021
+ 48 more permits on file
8 projects · most recent 10/06/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/06/2026——Gas, Water/Sanitary
06/03/2026——Gas, Water/Sanitary
06/02/2026Permit IssuedDPH Plumbing & HeatingWater/Sanitary
04/28/2026Permit IssuedFull Circle PlumbingGas, Water/Sanitary
03/12/2026Permit IssuedBudget Plumbing & HeatingGas, Water/Sanitary
01/06/2025Signed-offPegasus P&HGas, Water/Sanitary
11/17/2022Permit IssuedAccurate MechanicalGas, Water/Sanitary
07/08/2021Permit IssuedA.M.NGas, Water/Sanitary
24 projects · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedVlashava Electric ContractingGeneral Wiring
04/29/2026Permit IssuedEmpire Lic Electrical ContractorsGeneral Wiring
03/11/2026Permit IssuedSNB Electrical ContngGeneral Wiring
12/09/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
05/06/2025Permit IssuedBronxdale ElectricGeneral Wiring
03/27/2025CompleteJoseph Weinstein Electric—
03/11/2025CompleteMcDougall Electrical ServicesGeneral Wiring
08/21/2024CompleteA&E Electrical Systems CoGeneral Wiring
10/18/2023CompleteAttractive Lighting Electrical—
05/20/2023CompleteRedline ElectricGeneral Wiring
03/01/2023CompleteAmerican Power Electric ConsGeneral Wiring
02/01/2023CompleteMarks Electric1 meters, 1 new_meters
12/07/2022Permit IssuedMidland Electrical CoGeneral Wiring
07/29/2021CompleteGlendale Electl Contng—
05/03/2021CompletePower Surge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
08/20/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
01/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
10/06/2026Fenestration areasMOHAMED MAHMOUDenergy_progress
10/06/2026MeteringMOHAMED MAHMOUDenergy_progress
10/06/2026Air barrier - visual inspectionMOHAMED MAHMOUDenergy_progress
10/06/2026Insulation placement and R valuesMOHAMED MAHMOUDenergy_progress
10/06/2026Fenestration air leakageMOHAMED MAHMOUDenergy_progress
10/06/2026Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
10/06/2026Permanent certificateMOHAMED MAHMOUDenergy_progress
10/06/2026Permanent certificateMOHAMED MAHMOUDenergy_progress
10/06/2026MeteringMOHAMED MAHMOUDenergy_progress
10/06/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/06/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/06/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/06/2026Final—progress
10/06/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
10/06/2026Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
10/06/2026Air barrier — testing MOHAMED MAHMOUDenergy_progress
07/08/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
07/08/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/08/2026FinalShahrish Shuvoprogress
05/29/2026Interior lighting powerJean-Luc Briguetenergy_progress
05/29/2026Fire-Resistant Penetrations and JointsJean-Luc Briguetspecial
05/29/2026Lighting in dwelling unitsJean-Luc Briguetenergy_progress
05/27/2026FinalJean-Luc Briguetprogress
05/05/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
05/05/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
Latest 25 of 116.
▾Documents — 1,012 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch43
10/07/2026M01470360-I1Request digital key ↗
10/07/2026M01470360-S1Request digital key ↗
09/04/2026M00474357-I1Request digital key ↗
Showing 3 of 43 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00426308-I1Request digital key ↗
08/15/2026M00426308-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00261822-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00474357-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00301314-I1Request digital key ↗
▸Applications & Permits196
▸BISPLAN / WORK APPROVAL APPLICATION83
06/06/2025104236417Open ↗
05/02/2023100818901Open ↗
05/01/2023100818901Open ↗
Showing 3 of 83 on file for this type
▸BISWORK PERMIT APPLICATION72
09/02/2020140910012Open ↗
12/06/2019140652755Open ↗
10/30/2019123816282Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWLPC Approval/Permit40
10/07/2026M01470360-I1Open ↗
10/07/2026M01470360-S1Open ↗
08/25/2026M01166990-P1Open ↗
Showing 3 of 40 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/30/2021104466463Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZRD1-Zoning Resolution Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications232
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION84
03/05/2020140652755Open ↗
03/05/2020140652755Open ↗
02/19/2020101555103Open ↗
Showing 3 of 84 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
10/07/2026M01470360-S1Open ↗
10/07/2026M01470360-I1Open ↗
09/05/2026M00261822-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
10/03/2026M08044198-I1Open ↗
10/03/2026M08044198-I1Open ↗
09/23/2026M00526999-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
10/03/2026M08044198-I1Open ↗
09/23/2026M01408322-I1Open ↗
09/07/2026M01388225-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
06/30/2020140910012Open ↗
09/23/2019123816282Open ↗
03/14/2019123715239Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
09/23/2019123816282Open ↗
03/14/2019123715239Open ↗
Showing 2 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
06/30/2020140910012Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
06/30/2020140910012Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment69
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
12/17/2019140652755Open ↗
12/12/2019140652755Open ↗
11/08/2019140652755Open ↗
Showing 3 of 26 on file for this type
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISEQUIPMENT USE PERMITS6
08/21/2020123389546Open ↗
08/21/2020123389546Open ↗
08/21/2020123389546Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
08/21/2020123389546Open ↗
08/07/2020123389546Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection19
▸BISTenant Protection Plan and Notes15
09/23/2019123816282Open ↗
03/14/2019123715239Open ↗
02/14/2022104466463Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00426308-P1Open ↗
Showing 1 of 4 on file for this type
▸Environmental & Asbestos69
▸DOB NOWDEP ACP-5: Asbestos Assessment Report39
09/03/2026M00526999-I1Open ↗
09/01/2026M08017261-P1Open ↗
09/01/2026M08017261-P2Open ↗
Showing 3 of 39 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
06/30/2020140910012Open ↗
10/28/2019123816282Open ↗
03/14/2019123715239Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/05/2026M00261822-I1Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance78
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
10/29/2019123715239Open ↗
10/29/2019123715239Open ↗
09/23/2019123816282Open ↗
Showing 3 of 33 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
08/19/2020123389546Open ↗
08/07/2020123389546Open ↗
07/08/2020123816282Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
08/19/2020123389546Open ↗
08/19/2020123389546Open ↗
08/07/2020123389546Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
06/30/2020140910012Open ↗
Showing 1 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/13/2021140910012Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/13/2021140910012Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY21
05/08/2023100818901Open ↗
05/08/2023100818901Open ↗
02/01/2022104466463Open ↗
Showing 3 of 21 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
05/08/2023100818901Open ↗
▸Approvals, Objections & Sign-offs95
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
05/25/2023100818901Open ↗
02/17/2022104466463Open ↗
07/13/2021140910012Open ↗
Showing 3 of 33 on file for this type
▸BISLANDMARKS APPROVAL32
05/25/2023100818901Open ↗
06/30/2020140910012Open ↗
10/29/2019123715239Open ↗
Showing 3 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
08/21/2020123389546Open ↗
Showing 1 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLANDMARKS SIGNOFF5
02/17/2022104466463Open ↗
07/13/2021140910012Open ↗
08/07/2020123389546Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
12/06/2019140652755Open ↗
Showing 1 of 4 on file for this type
▸BISFINAL1
07/13/2021140910012Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWLandmark Approval1
08/13/2026M01208902-I1Open ↗
▸Cost, Insurance & Ownership68
▸BISCOST AFFIDAVIT64
01/15/2022104466463Open ↗
01/05/2022104466463Open ↗
08/19/2020123389546Open ↗
Showing 3 of 64 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/14/2022104466463Open ↗
07/13/2021140910012Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms92
▸BISBOROUGH INTAKE FORM33
08/21/2020123389546Open ↗
03/10/2020123389546Open ↗
03/05/2020140652755Open ↗
Showing 3 of 33 on file for this type
▸BISEFILING COVER SHEET27
09/23/2019123816282Open ↗
03/14/2019123715239Open ↗
Showing 2 of 27 on file for this type
▸BISADDITIONAL INFORMATION25
02/11/2022104466463Open ↗
12/17/2019140652755Open ↗
10/23/2019140652755Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
06/30/2020140910012Open ↗
Showing 1 of 7 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building9
08/17/2026M01208902-P1Open ↗
08/15/2026M00725992-I1Open ↗
08/13/2026M00725981-I1Open ↗
Showing 3 of 9 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDHCR DOCUMENT1
03/26/2019123715239Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type