Condo, residential tower (mixed-use, multi-family elevator) [derived]
41 JOHN STREET
MANHATTAN · BIN 1075701
💬 Discuss this project
1900Year Built
4.5Stories
RMBuilding Class
C5-5Zoning
17,781 sfGross Floor Area
6Units
Rent Stabilized6 Open Violations 4 unresolved · 2 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 41 JOHN STREET EQUITIES LLC · 5,516 sf lot · 3.22 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire Protection
Roof6p · 2 filings · 20 docs
Floor 110p · 5 filings · 20 docs
Mezzanine3p · 2 filings · 6 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIME EQUITIES INC AS AGENT3607/08/2026
41 JOHN ST EQUITIES LLC903/22/2026
TIMES EQUITIES403/22/2026
WEST 83TH STREET EQUI103/22/2026
E.S. SUTTON COMPANY103/22/2026
EQUITIES TIME103/22/2026
41 JOHN AB LLC.103/22/2026
CAFE 41103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT603/21/2026
COMMERCIAL CAPITAL USA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTER COOLING SERVICE COGeneral Contractor603/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing307/08/2026
UNIVERSAL CONSTRUCTIONGeneral Contractor204/09/2026
EPOCH CONSTRUCTION INCGeneral Contractor207/08/2026
PREMIER FLOW PLBG AND HTGPlumbing207/08/2026
AJC PLUMBING & HTG CORPPlumbing107/08/2026
MANHATTAN CONCRETE LLCGeneral Contractor107/08/2026
VOLTAGE ELECTRIC CORPElectrical103/22/2026
AJC SPRINKLER CORPFire Protection107/08/2026
DONE RIGHT HOOD & FIRE SAGeneral Contractor106/28/2026
ALEX WUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LCW ENGINEERING, PC1103410/30/2025
MSM ENGINEERING SERVICES,8449603/04/2025
GREAT WALL CONSULTANT P.E5633310/10/2024
ABEJA ENGINEERING PLLC7269104/19/2022
VINCENT J. LIOTTA P. E.1974102/02/2022
Building Lifecycle
All (109)Filed (12)Permit Issued (12)Signed Off (3)Violation (45)Inspection (7)Special Inspection (30)
03/30/2026
Signed off — Alteration
Propose mechanical work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
M01119340-I1
03/18/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/02/2026
Signed off — Alteration
Propose mechanical work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
M01119340-S2
11/07/2025
Permit issued — Mechanical Systems
M01148701-S2-MS
10/30/2025
Filed — Alteration
Subsequent filing for kitchen exhaust hood, exhaust fan, related ductwork and HVAC system installation as per the plans filed herewith. No change to the use, egress or occupancy.
M01148701-P1
10/15/2025
Special inspection requirement — Mechanical Systems
luis wong
10/15/2025
Special inspection requirement — Final
luis wong
10/15/2025
Special inspection requirement — Shutoff dampers
luis wong
10/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
luis wong
10/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
luis wong
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
luis wong
06/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/04/2025
Filed — Alteration
Propose mechanical work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
M01119340-P3
02/14/2025
Filed — Alteration
Propose mechanical work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
M01119340-P1
02/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/12/2025
Special inspection requirement — Ventilation and air distribution system
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — Final
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
02/12/2025
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
Xiong Wei Wu
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2025
Filed — Alteration
Propose mechanical work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
M01119340-P2
01/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/21/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
01/21/2025
Special inspection requirement — Lighting in dwelling units
MOHAMED MAHMOUD
01/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
01/21/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
01/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/13/2024
Permit issued — Plumbing
M01148701-S1-PL
12/10/2024
Permit issued — General Construction
M01148701-I1-GC
12/10/2024
Permit issued — Mechanical Systems
M01148701-S2-MS
12/03/2024
Filed — Alteration
Subsequent filing for kitchen exhaust hood, exhaust fan, related ductwork and HVAC system installation as per the plans filed herewith. No change to the use, egress or occupancy.
M01148701-S2
12/03/2024
Filed — Alteration
Subsequent filing for kitchen exhaust hood, exhaust fan, related ductwork and HVAC system installation as per the plans filed herewith. No change to the use, egress or occupancy.
M01148701-S1
12/03/2024
Filed — Alteration
Subsequent filing for kitchen exhaust hood, exhaust fan, related ductwork and HVAC system installation as per the plans filed herewith. No change to the use, egress or occupancy.
M01148701-I1
11/27/2024
Special inspection requirement — Interior lighting power
luis wong
11/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
luis wong
11/27/2024
Special inspection requirement — Final
luis wong
11/27/2024
Special inspection requirement — Energy Code Compliance Inspections
luis wong
10/23/2024
Permit issued — General Construction
M01119340-I1-GC
10/18/2024
Permit issued — Plumbing
M01119340-S1-PL
10/16/2024
Permit issued — Mechanical Systems
M01119340-S2-MS
10/10/2024
Filed — Alteration
Propose mechanical work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
M01119340-I1
10/10/2024
Filed — Alteration
Propose mechanical work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
M01119340-S2
10/10/2024
Filed — Alteration
Propose mechanical work at partial 1st floor commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy.
M01119340-S1
12/21/2023
Signed off — Alteration
INSTALLATION OF 6 UNITS WITH A 37.5 TON CAPACITY UNIT ON THE ROOFTOP. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00669904-I1
07/27/2023
Permit issued — Mechanical Systems
M00669904-I1-MS
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/12/2022
Permit issued — Plumbing
M00711286-I1-PL
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDONE RIGHT HOOD & FIRE SA11/07/2025
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG12/13/2024
DOB NOWGeneral ConstructionPermit IssuedEPOCH CONSTRUCTION INC12/10/2024
DOB NOWMechanical SystemsPermit IssuedEPOCH CONSTRUCTION INC12/10/2024
DOB NOWGeneral ConstructionSigned-offUNIVERSAL CONSTRUCTION10/23/2024
DOB NOWPlumbingPermit IssuedGALICJA PLBG AND HTG.CORP10/18/2024
DOB NOWMechanical SystemsSigned-offUNIVERSAL CONSTRUCTION10/16/2024
DOB NOWMechanical SystemsSigned-offMASTER COOLING SERVICE CO07/27/2023
DOB NOWPlumbingPermit IssuedAJC PLUMBING & HTG CORP05/12/2022
DOB NOWSprinklersPermit IssuedAJC SPRINKLER CORP05/12/2022
DOB NOWGeneral ConstructionPermit IssuedMANHATTAN CONCRETE LLC05/02/2022
DOB NOWMechanical SystemsSigned-offMASTER COOLING SERVICE CO03/04/2022
BISOTISSUEDFINIX U.S.A. CONSTRUCTION07/23/2015
BISEQISSUEDFINIX U.S.A. CONSTRUCTION07/23/2015
BISFPISSUEDSTARMET FIRE EQUIPMENT,INC.09/11/1998
BISMHISSUEDGAL-GIL RESTAURANT CONTRACTING08/19/1997
BISPLISSUEDF&L PLBG06/26/1997
BISPLISSUEDJOHN RAGOUSSIS & SONS INC06/13/1997
BISOTISSUEDGAL-GIL RESTAURANT CONTRACTING06/06/1997
BISEQISSUEDGAL-GIL RESTAURANT CONTRACTING06/06/1997
BISOTISSUEDCOMPERN CORP04/03/1997
BISOTISSUEDMBL CONTRACTING CORP.07/16/1991
BIS—ISSUEDPRATO FIRE MEN'S WEAR02/07/1991
1 project · most recent 03/04/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/04/2025Signed-offUNIVERSAL CONSTRUCTIONVentilation Systems
Ventilation
Captiveaire A3-24D OR EQUAL 5,000 CFM · Makeup Air ×2
1 project · most recent 03/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/04/2025Permit IssuedPREMIER FLOW PLBG AND HTGGas, Water/Sanitary
10 projects · most recent 03/31/2025
General Wiring
FiledStatusContractorScope
03/31/2025CompleteVOLTAGE ELECTRIC CORP—
12/16/2024Permit IssuedFIRST STAR ELECTRIC INCGeneral Wiring
10/19/2024Permit IssuedR & T ELECTRICAL CORPGeneral Wiring
11/03/2023CompleteVOLTAGE ELECTRIC CORP—
11/02/2023CompleteVOLTAGE ELECTRIC CORP—
10/25/2023CompleteVOLTAGE ELECTRIC CORP—
08/11/2023CompleteVOLTAGE ELECTRIC CORPGeneral Wiring
06/17/2021Permit IssuedVOLTAGE ELECTRIC CORPGeneral Wiring
05/04/2021Permit IssuedVOLTAGE ELECTRIC CORP—
02/14/2020CompleteVOLTAGE ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/18/2026Pass-Final General Construction Non-Directive 14PassView ↗
06/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
10/15/2025Mechanical Systemsluis wongspecial
10/15/2025Finalluis wongprogress
10/15/2025Shutoff dampersluis wongenergy_progress
10/15/2025HVAC-R and service water piping design and insulationluis wongenergy_progress
10/15/2025HVAC-R and service water heating equipmentluis wongenergy_progress
10/15/2025Tenant Protection Plan Compliance—special
10/15/2025Energy Code Compliance Inspectionsluis wongprogress
02/13/2025Tenant Protection Plan Compliance—special
02/12/2025Ventilation and air distribution systemMOHAMED MAHMOUDenergy_progress
02/12/2025Duct leakage testing, insulation and designMOHAMED MAHMOUDenergy_progress
02/12/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/12/2025Mechanical SystemsMOHAMED MAHMOUDspecial
02/12/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/12/2025FinalMOHAMED MAHMOUDprogress
02/12/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
02/12/2025Maintenance informationMOHAMED MAHMOUDenergy_progress
01/27/2025Tenant Protection Plan ComplianceXiong Wei Wuspecial
01/27/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
01/21/2025Tenant Protection Plan Compliance—special
01/21/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
01/21/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
01/21/2025Lighting in dwelling unitsMOHAMED MAHMOUDenergy_progress
01/21/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
01/21/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
01/21/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
Latest 25 of 42.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026M00669904-I1Request digital key ↗
09/02/2026M00717277-I1Request digital key ↗
08/26/2026M01119340-P3Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
07/02/2019123751742Open ↗
06/18/2019123751742Open ↗
07/20/2015140378133Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
08/06/2019123751742Open ↗
07/23/2015140378133Open ↗
07/23/2015140378133Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026M00669904-I1Open ↗
09/02/2026M00669904-I1Open ↗
09/01/2026M01119340-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00669904-I1Open ↗
08/26/2026M01119340-P3Open ↗
08/26/2026M01119340-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M00669904-I1Open ↗
09/01/2026M01119340-P3Open ↗
08/31/2026M01119340-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/06/2019123751742Open ↗
08/06/2019123751742Open ↗
06/18/2019123751742Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/20/2015140378133Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/20/2015140378133Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/20/2015140378133Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/18/2019123751742Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/26/2026M01119340-I1Open ↗
08/26/2026M01119340-P3Open ↗
08/26/2026M01119340-P2Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/18/2019123751742Open ↗
07/20/2015140378133Open ↗
07/12/2012121049052Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/20/2015140378133Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/20/2015140378133Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/18/2019123751742Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00669904-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/02/2026M00669904-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/20/2015140378133Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
04/23/2012121049052Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
06/18/2019123751742Open ↗
07/20/2015140378133Open ↗
07/26/2012121049052Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/06/2019123751742Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
06/18/2019123751742Open ↗
07/26/2012121049052Open ↗
04/23/2012121049052Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/20/2015140378133Open ↗