Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Heritage Condominium
41 WEST 72ND STREET · BIN 1028633
💬 Discuss this project
1928Year Built
16.5Stories
RMBuilding Class
R10AZoning
100,098 sfGross Floor Area
127Units
LL97 CoveredRent Stabilized27 Active Violations 25 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 10,217 sf lot · 9.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11Unit 11H3p · 1 filing · 8 docs
Floor 10
Floor 9
Floor 8Unit 8A5p · 2 filings · 16 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Unit 3F3p · 2 filings · 14 docs
Floor 2
Floor 1
CellarAkam Associates, INC.3p · 1 filing · 14 docs
Site & exteriorAkam Associates, INC.14p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hermitage Condominium2903/21/2026
Dominion Property Group2203/21/2026
41 West 721703/21/2026
41 West 72ND, LLC C/O PMG1603/21/2026
RSP Uap-3 Property703/22/2026
Advanced Dentistry Associates303/21/2026
41 W 72nd203/21/2026
Jlo Partnership103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DHD Architecture Design107/02/2025
Cherny Architect402/20/2024
S.M. Berger Architecture312/05/2023
Roger de Electric Co311/21/2023
Mohammad Ahead, PE103/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DHD Architecture203/21/2026
Synergy Building Consultants103/21/2026
J.A.M. Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dome KGeneral Contractor1207/08/2026
Kings Group NYScaffold407/08/2026
BH Design GroupGeneral Contractor303/21/2026
A.M.NPlumbing307/08/2026
Prime RenovationsGeneral Contractor203/21/2026
L & Z Restorationspecialty_contractor203/21/2026
Delta-Sigma MechanicalPlumbing107/08/2026
TM Select ElectricElectrical103/22/2026
Teci ElectricElectrical103/21/2026
Stone & Oak InteriorsGeneral Contractor107/22/2026
Macintosh ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cherny Architect1925402/20/2024
Enthink Engineers6247211/21/2023
Salamon Engineering1264311/21/2023
Catalpa Special Inspectio2004111/22/2022
Building Lifecycle
All (147)Filed (13)Permit Issued (17)Signed Off (10)Facade (FISP) (15)Violation (60)Inspection (11)Objection (6)Special Inspection (15)
07/29/2026
Violation issued (HPD, open)
C
07/29/2026
Violation issued (HPD, open)
C
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
C
07/21/2026
Signed off — Alteration
Replace egress doors in existing apartment 8A on the 8th floor. General Construction. No change in use, occupancy or egress.
M01208067-I1
07/15/2026
Permit issued — General Construction
M01208067-I1-GC
08/29/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Scope
07/02/2025
Filed — Alteration
Replace egress doors in existing apartment 8A on the 8th floor. General Construction. No change in use, occupancy or egress.
M01208067-I1
04/18/2025
Signed off — Alteration
Remove bathtub, replace toilet, lavatory, kitchen sink. Install shower, dishwasher and washer.
M00990928-I1
04/18/2025
Signed off — Alteration
Remove bathtub, replace toilet, lavatory, kitchen sink. Install shower, dishwasher and washer.
M00990928-S1
04/16/2025
Special inspection requirement — Final
David Howell
04/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2025
Signed off — Alteration
Installation of suspended scaffold during facade inspection/ Repairs
M01025015-I1
03/26/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
03/18/2025
Violation issued (HPD, open)
B
03/18/2025
Violation issued (HPD, open)
B
03/18/2025
Violation issued (HPD, open)
B
03/18/2025
Violation issued (HPD, closed)
C
03/18/2025
Violation issued (HPD, open)
B
07/24/2024
Violation issued (HPD, closed)
B
07/24/2024
Violation issued (HPD, closed)
B
07/24/2024
Violation issued (HPD, closed)
A
07/24/2024
Violation issued (HPD, closed)
B
07/24/2024
Violation issued (HPD, open)
B
07/24/2024
Violation issued (HPD, open)
B
07/16/2024
Signed off — Alteration
INTERIOR RENOVATION INCLUDING MODIFICATION TO EXISTING NON-LOAD BEARING WALLS, CEILINGS, FLOORING AND FINISHES. INSTALLATION OF 2 NEW PTAC UNITS. . NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00766483-I1
07/16/2024
Signed off — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING FOR UNIT 3F
M00793073-I1
07/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2024
Permit issued — General Construction
M00990928-I1-GC
05/21/2024
Permit issued — General Construction
M00990928-I1-GC
05/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2024
Permit issued — Suspended Scaffold
M01025015-I1-SC
03/25/2024
Filed — Alteration
Installation of suspended scaffold during facade inspection/ Repairs
M01025015-I1
03/22/2024
Permit issued — Plumbing
M00990928-S1-PL
03/14/2024
Violation issued (ECB, closed)
Local Law
03/08/2024
Signed off — Alteration
M00687947-I1
02/27/2024
Permit issued — General Construction
M00990928-I1-GC
02/20/2024
Filed — Alteration
Remove bathtub, replace toilet, lavatory, kitchen sink. Install shower, dishwasher and washer.
M00990928-S1
02/05/2024
Filed — Alteration
Remove bathtub, replace toilet, lavatory, kitchen sink. Install shower, dishwasher and washer.
M00990928-I1
01/24/2024
Cycle 9 facade report signed — SAFE
01/22/2024
Cycle 9 facade inspection completed
12/22/2023
Violation issued (HPD, open)
A
12/22/2023
Violation issued (HPD, closed)
B
12/22/2023
Violation issued (HPD, closed)
B
12/22/2023
Violation issued (HPD, open)
B
12/22/2023
Violation issued (HPD, closed)
B
12/22/2023
Violation issued (HPD, closed)
B
12/22/2023
Violation issued (HPD, closed)
B
12/22/2023
Violation issued (HPD, closed)
C
12/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2023
Cycle 9 facade report submitted
12/05/2023
Filed — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING FOR UNIT 3F
M00793073-P1
12/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offStone & Oak Interiors07/15/2026
DOB NOWGeneral ConstructionSigned-offDome K06/11/2024
DOB NOWGeneral ConstructionSigned-offDome K05/21/2024
DOB NOWSuspended ScaffoldSigned-offL & Z Restoration04/10/2024
DOB NOWPlumbingSigned-offA.M.N03/22/2024
DOB NOWGeneral ConstructionSigned-offDome K02/27/2024
DOB NOWPlumbingSigned-offA.M.N10/20/2023
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical10/16/2023
DOB NOWGeneral ConstructionSigned-offPrime Renovations09/19/2023
DOB NOWGeneral ConstructionSigned-offDome K06/24/2023
DOB NOWSidewalk ShedSigned-offKings Group NY03/03/2023
DOB NOWGeneral ConstructionPermit IssuedMichael Dellavecchia & Sons09/29/2022
DOB NOWPlumbingSigned-offA.M.N08/15/2022
DOB NOWGeneral ConstructionSigned-offDome K06/23/2022
DOB NOWGeneral ConstructionSigned-offDome K04/26/2022
DOB NOWSidewalk ShedSigned-offKings Group NY03/10/2022
DOB NOWGeneral ConstructionSigned-offBH Design Group01/31/2022
BISPLISSUEDDonato Plumbing07/01/2022
BISPLISSUEDStellmar Plumbing & Mechanical01/25/2022
BISOTISSUEDKayafas Contracting Co09/23/2021
BISPLISSUEDStellmar Plumbing & Mechanical01/26/2021
BISOTISSUEDWulfing Construction05/20/2020
BISOTISSUEDWulfing Construction04/27/2020
BISPLISSUEDStellmar Plumbing & Mechanical07/16/2019
BISOTISSUEDA.L.L. Construction and D05/28/2019
BISPLISSUEDStellmar Plumbing & Mechanical07/02/2018
BISOTISSUEDWulfing Construction07/02/2018
BISOTISSUEDMiller Aire06/29/2018
BISMHISSUEDReal Deal Decoration09/21/2016
BISOTISSUEDReal Deal Decoration09/20/2016
BISMHISSUEDReal Deal Decoration06/13/2016
BISPLISSUEDCarreras Home Improvement06/13/2016
BISOTISSUEDReal Deal Decoration06/10/2016
BISPLISSUEDOrbit Plumbing & Heating06/03/2015
BISOTISSUEDBrener Construction 21205/27/2015
BISOTISSUEDReal Deal Decoration11/19/2014
BISPLISSUEDCarreras Home Improvement11/19/2014
BISPLISSUEDDC Building Services03/03/2014
BISOTISSUEDLamas Construction01/24/2014
BISPLISSUEDGalgano Plumbing & Heating01/21/2014
+ 27 more permits on file
18 projects · most recent 07/10/2026
General Wiring
FiledStatusContractorScope
07/10/2026CompleteShuir Electrical Contractors—
06/11/2024CompleteMacintosh ElectricGeneral Wiring
05/16/2024CompleteMacintosh ElectricGeneral Wiring
05/14/2024CompletePower Control ElectricGeneral Wiring
03/13/2024CompleteAccurate ElectricalGeneral Wiring
01/30/2024Permit IssuedTM Select Electric—
01/30/2024CompleteTM Select ElectricGeneral Wiring
10/04/2023CompleteMacintosh ElectricGeneral Wiring
07/19/2023CompleteEmpire Lic Electrical Contractors—
05/05/2023CompleteVertex Electric—
03/28/2023CompleteAccurate ElectricalGeneral Wiring
12/22/2022CompleteMacintosh ElectricGeneral Wiring
02/23/2022Permit IssuedHigh Quality Electric of—
02/06/2020CompleteSuper Charged ElectricGeneral Wiring
03/27/2019Permit IssuedAtn ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/16/2025FinalDavid Howellprogress
12/04/2023Fire-Resistant Penetrations and Joints—special
11/21/2023Structural Stability – Alterations of existing buildingsSunil Saigalspecial
11/21/2023Concrete - Cast-In-PlaceDavid Salamonspecial
11/21/2023FinalDavid Salamonprogress
02/24/2023FinalDavid Salamonprogress
02/24/2023Concrete - Cast-In-PlaceDavid Salamonspecial
02/24/2023Structural Stability – Alterations of existing buildingsSunil Saigalspecial
06/29/2022Lighting controlsERIC BERLENTenergy_progress
06/29/2022FinalERIC BERLENTprogress
06/29/2022Lighting in dwelling unitsERIC BERLENTenergy_progress
06/29/2022Interior lighting powerERIC BERLENTenergy_progress
06/20/2022MasonryDavid Salamonspecial
06/20/2022FinalDavid Salamonprogress
04/21/2022Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
▾Documents — 550 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/02/2026M00687947-I1Request digital key ↗
09/02/2026M00659437-I1Request digital key ↗
09/02/2026M00659437-S1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits125
▸BISWORK PERMIT APPLICATION57
07/05/2022123761018Open ↗
09/24/2021122877672Open ↗
05/20/2020122877672Open ↗
Showing 3 of 57 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION56
03/01/2023104836019Open ↗
02/07/2023104836019Open ↗
12/20/2022104836019Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWLPC Approval/Permit12
08/13/2026M00793073-I1Open ↗
08/13/2026M00633933-I1Open ↗
08/13/2026M00633933-P1Open ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications93
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION47
05/20/2019123761018Open ↗
06/04/2018122877672Open ↗
02/08/2018123211407Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026M00687947-I1Open ↗
09/02/2026M00760541-I1Open ↗
09/02/2026M00760541-P1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
02/08/2018123211407Open ↗
04/03/2017122791274Open ↗
03/29/2017122791274Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00760541-I1Open ↗
08/29/2026M00633933-P1Open ↗
08/29/2026M00633933-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00760541-I1Open ↗
09/01/2026M00766483-I1Open ↗
09/01/2026M00766483-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/08/2018123211407Open ↗
02/08/2018123211407Open ↗
06/10/2016122791274Open ↗
▸Trade Schedules & Equipment60
▸BISSELF-CERT PLUMBING NOTICE22
09/24/2015122355325Open ↗
09/02/2015122355325Open ↗
02/02/2015122125814Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING15
08/02/2022123761018Open ↗
07/18/2022122877672Open ↗
07/01/2022122877672Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
05/20/2019123761018Open ↗
01/09/2019122877672Open ↗
02/08/2018123211407Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/26/2014122053099Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
07/09/2014122053099Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
05/20/2019123761018Open ↗
02/08/2018123211407Open ↗
06/10/2016122791274Open ↗
Showing 3 of 4 on file for this type
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026M00760541-I1Open ↗
09/02/2026M00760541-P1Open ↗
09/01/2026M00793073-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
05/20/2019123761018Open ↗
02/08/2018123211407Open ↗
11/03/2016122877672Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
05/20/2019123761018Open ↗
02/08/2018123211407Open ↗
11/03/2016122877672Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
09/20/2022123761018Open ↗
10/25/2016122791274Open ↗
07/22/2015122125814Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/20/2022123761018Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/15/2024122877672Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00659437-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/20/2022123761018Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/14/2024122877672Open ↗
▸Approvals, Objections & Sign-offs73
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
09/26/2022123761018Open ↗
11/23/2020104836019Open ↗
08/31/2020104836019Open ↗
Showing 3 of 26 on file for this type
▸BISLANDMARKS APPROVAL21
05/20/2019123761018Open ↗
02/08/2018123211407Open ↗
11/14/2016122877672Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/20/2019123761018Open ↗
12/05/2016122877672Open ↗
07/22/2015122125814Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF2
08/19/2024122877672Open ↗
09/21/2022123761018Open ↗
▸BISSUPERSEDING LETTER1
09/24/2021122877672Open ↗
▸BISFINAL1
08/14/2024122877672Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
03/01/2023104836019Open ↗
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT36
09/20/2022123761018Open ↗
05/20/2019123761018Open ↗
02/08/2018123211407Open ↗
Showing 3 of 36 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISON TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION- AFFIDAVIT ATTACHED1
07/26/2023104836019Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
03/25/2015122329505Open ↗
▸Filing & Intake Forms57
▸BISEFILING COVER SHEET27
05/20/2019123761018Open ↗
02/08/2018123211407Open ↗
11/03/2016122877672Open ↗
Showing 3 of 27 on file for this type
▸BISBOROUGH INTAKE FORM15
09/24/2021122877672Open ↗
05/20/2020122877672Open ↗
02/05/2020104836019Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION13
02/22/2023104836019Open ↗
08/10/2022123761018Open ↗
07/18/2022122877672Open ↗
Showing 3 of 13 on file for this type
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
06/16/2016122791274Open ↗
05/14/2015122355325Open ↗
11/24/2014122125814Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026M01208067-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01025015-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01025015-I1Open ↗