← Back
BuildNYC
Elevator cooperative
410 CENTRAL PARK WEST
MANHATTAN · BIN 1055302
💬 Discuss this project
1929Year Built
16Stories
D4Building Class
R8Zoning
100,530 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: Catcendix · 7,567 sf lot · 13.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsOrsid Realty1 filing
RoofCatcendix Corp C/o Orsid NYUnder Construction1p · 2 filings · 6 docs
BulkheadIndependent protected bulkhead wraps1p · 1 filing · 2 docs
Floor 15Unit 15A2 filings · 6 docs
Floor 14
Floor 13
Floor 12Unit 12D, Unit 12E5p · 3 filings · 6 docs
Floor 11
Floor 10
Floor 9
Floor 8Unit 8E1 filing · 3 docs
Floor 7Unit 7D, Unit 7E, Unit 7F +12 filings · 15 docs
Floor 6Unit 6A4p · 2 filings · 17 docs
Floor 52 filings · 17 docs
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorCatcendix Corp C/o Orsid NYUnder Construction6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Catcendix8203/22/2026
Orsid Realty210/07/2026
Ketrec Management Co203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Upgrade Contracting203/21/2026
J A Expediting603/21/2026
Theresa Voltaggio303/21/2026
Skyline Access103/21/2026
Lloyd Noel Building Consultant503/21/2026
Lewsan Consultants803/21/2026
Sol Building Consulting Services403/21/2026
Josef Prini Architect103/21/2026
Victor Schwartz Architect103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1307/08/2026
SYNC ConstructionGeneral Contractor1007/08/2026
Upgrade Contracting CoGeneral Contractor507/08/2026
M.W. Construction GroupGeneral Contractor303/21/2026
Howard Borress EntprsElectrical203/21/2026
S&H PlumbingPlumbing207/08/2026
Prat EnterprisesScaffold210/09/2026
B & H Restorationspecialty_contractor107/08/2026
Neuehaus StudiosGeneral Contractor107/08/2026
Prat EnterprisesGeneral Contractor109/16/2026
Sami Construction & RemodelingGeneral Contractor107/08/2026
Aqua Plumbing & HeatingPlumbing107/08/2026
Astoria P & HPlumbing107/08/2026
G.bassolino PlumbingPlumbing107/08/2026
Hudson River Mechanical Group IPlumbing107/08/2026
New Plumbing & HeatingPlumbing107/08/2026
Avellino Electrical ContractingElectrical103/21/2026
Z.W. Plumbing & HeatingPlumbing107/08/2026
Alcan ElectricElectrical103/21/2026
K & G Electric CoElectrical103/21/2026
Twintech ElectricElectrical103/21/2026
Super Charged ElectricElectrical103/21/2026
American Ventilation Servicespecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665109/09/2026
Lombardo Professional Engineering8566106/09/2026
EDG2578106/09/2026
EC Special Inspections8355207/29/2025
Architecture Work Office6054205/02/2025
Group-S5216503/25/2024
Cowley Engineering186312/23/2023
Ryan Special Engineering2018405/22/2023
Gilsanz Murray Steficek240112/01/2021
Structural Engineering BU5883111/23/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 10/20/2025, status Swarmp
10/08/2026
Permit issued — Protection and Mechanical Methods
M01466796-I1-PMM
10/07/2026
Filed — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01466796-I1
10/06/2026
Permit issued — Suspended Scaffold
M01455780-I1-SC
09/15/2026
Permit issued — General Construction
M01409214-I1-GC
288 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedPrat Enterprises10/08/2026
DOB NOWSuspended ScaffoldPermit IssuedVichihel Restoration10/06/2026
DOB NOWGeneral ConstructionPermit IssuedPrat Enterprises09/15/2026
DOB NOWSidewalk ShedPermit IssuedPrat Enterprises08/26/2026
DOB NOWPlumbingSigned-offHudson River Mechanical Group I08/12/2025
DOB NOWGeneral ConstructionSigned-offSYNC Construction08/11/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration06/26/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/12/2024
DOB NOWSuspended ScaffoldPermit IssuedUpgrade Contracting Co12/26/2023
DOB NOWGeneral ConstructionSigned-offUpgrade Contracting Co11/02/2023
DOB NOWGeneral ConstructionSigned-offAmerican Ventilation Service10/12/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding10/02/2023
DOB NOWPlumbingSigned-offG.bassolino Plumbing07/29/2023
DOB NOWStructuralSigned-offUpgrade Contracting Co07/21/2023
DOB NOWGeneral ConstructionSigned-offSYNC Construction04/21/2023
DOB NOWPlumbingPermit IssuedS&H Plumbing01/19/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/18/2023
DOB NOWStructuralSigned-offB H Restoration11/21/2022
DOB NOWGeneral ConstructionSigned-offUpgrade Contracting Co11/02/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding10/03/2022
DOB NOWGeneral ConstructionSigned-offSYNC Construction08/30/2022
DOB NOWPlumbingSigned-offAstoria P & H07/01/2022
DOB NOWGeneral ConstructionSigned-offSYNC Construction06/24/2022
DOB NOWPlumbingSigned-offAqua Plumbing & Heating02/08/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/20/2022
DOB NOWGeneral ConstructionSigned-offNeuehaus Studios01/11/2022
DOB NOWPlumbingPermit IssuedS&H Plumbing11/22/2021
DOB NOWGeneral ConstructionPermit IssuedSami Construction & Remodeling09/20/2021
DOB NOWPlumbingSigned-offZ.W. Plumbing & Heating07/21/2021
DOB NOWMechanical SystemsSigned-offM.W. Construction Group07/12/2021
DOB NOWPlumbingSigned-offNew Plumbing & Heating02/16/2021
BISOTISSUEDIA Construction Management03/10/2023
BISOTISSUEDIA Construction Management03/11/2022
BISOTISSUEDIA Construction Management09/11/2021
BISOTISSUEDDapolito Design and Construction04/07/2021
BISOTISSUEDIA Construction Management03/11/2021
BISOTISSUEDArtisan Preservation03/10/2021
BISOTISSUEDArtisan Preservation03/03/2021
BISOTISSUEDDapolito Design and Construction02/12/2021
BISOTISSUEDArtisan Preservation12/18/2020
+ 41 more permits on file
21 projects · most recent 08/20/2026
General Wiring Lighting
FiledStatusContractorScope
08/20/2026Permit IssuedAurora Electrical Contg—
08/14/2025CompleteTwintech ElectricGeneral Wiring
06/29/2024CompleteA & S Master ElectricalGeneral Wiring
04/12/2024CompleteBig City Electrical SolutionsGeneral Wiring
10/23/2023CompleteTwintech ElectricGeneral Wiring
04/29/2023CompleteAsset Electric—
04/19/2023CompleteE & M Electrical NYGeneral Wiring
03/31/2023CompleteCentennial Elevator IndustriesGeneral Wiring
02/09/2022CancelledJem Electrical ContractingGeneral Wiring
02/01/2022CompleteCresco ElectricalGeneral Wiring
01/23/2022CompleteA & S Master ElectricalGeneral Wiring
01/21/2022CompleteBorowide Elect'l Contractors—
11/29/2021Permit IssuedE & M Electrical NYGeneral Wiring
09/22/2021CompleteLume Electric—
07/19/2021CompleteKurt Ebinger Electric ConstructionGeneral Wiring
1 project · most recent 12/01/2021
Steel
FiledStatusContractorScope
12/01/2021——Steel
1 project · most recent 08/25/2026
Sidewalk Shed
FiledStatusContractorScope
08/25/2026Permit IssuedPrat EnterprisesSidewalk Shed
1 project · most recent 09/09/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/09/2026Permit IssuedPrat EnterprisesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
09/03/2026Post-installed AnchorsKarol Zdancewiczspecial
09/03/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/05/2025FinalABDALLAH ELCHERBINIprogress
08/05/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
08/05/2025Energy Code Compliance InspectionsSal Tartaglioneprogress
07/21/2025FinalABDALLAH ELCHERBINIprogress
07/21/2025Energy Code Compliance InspectionsSal Tartaglioneprogress
07/21/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
04/15/2025Fire-Resistant Penetrations and JointsTexer Namspecial
04/15/2025Energy Code Compliance InspectionsELLEN MARTINprogress
04/15/2025Lighting in dwelling unitsELLEN MARTINenergy_progress
04/15/2025FinalELLEN MARTINprogress
04/15/2025Lighting controlsELLEN MARTINenergy_progress
04/15/2025Mechanical SystemsTexer Namspecial
03/26/2024Fire-Resistant Penetrations and JointsMICHAEL SCORRANOspecial
03/26/2024HVAC-R and service water heating equipmentMICHAEL SCORRANOenergy_progress
03/26/2024Maintenance informationMICHAEL SCORRANOenergy_progress
03/26/2024HVAC-R and service water heating system controlsMICHAEL SCORRANOenergy_progress
03/26/2024HVAC-R and service water piping design and insulationMICHAEL SCORRANOenergy_progress
03/26/2024Energy Code Compliance InspectionsMICHAEL SCORRANOprogress
03/26/2024Tenant Protection Plan ComplianceMICHAEL SCORRANOspecial
12/26/2023Structural Stability – Alterations of existing buildingsEric Cowleyspecial
12/26/2023FinalEric Cowleyprogress
12/26/2023MasonryEric Cowleyspecial
12/22/2023MasonryEric Cowleyspecial
Latest 25 of 59.
664 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account