Elevator apt, fireproof without stores
East River (NYCHA)
410 EAST 105TH STREET · BIN 1083946
💬 Discuss this project
1940Year Built
11Stories
D3Building Class
R7-2Zoning
810,774 sfGross Floor Area
1,170Units
LL97 Covered29 Active Violations 25 unresolved · 4 paperwork only 4 likely answered ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 467,225 sf lot · 1.74 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNYC Housing AuthorityUnder Construction2 filings
RoofNycha- East River Houses Bldg# 1Under Construction25p · 6 filings · 11 docs
Floor 11Unit PHE
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1NYC Housing AuthorityUnder Construction6 filings · 11 docs
CellarNYC Housing AuthorityUnder Construction4p · 6 filings · 11 docs
Site & exteriorNYC Housing AuthorityUnder Construction10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority15510/20/2026
Emg Industrial Chimney503/22/2026
Madison 45403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services3003/21/2026
CCM Services Group303/21/2026
HRF Services203/21/2026
Municipal Building Consultants603/21/2026
Synergy Building Consultants103/21/2026
Conapac Services Dba203/21/2026
City Wide Expediting203/21/2026
Liro Architects + Planner103/21/2026
LGML Group103/21/2026
Archvision Design Studio103/21/2026
Conapac Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V. C. Vitanza SonsPlumbing1307/08/2026
MNK EnterprisesScaffold1007/08/2026
ArbrisScaffold807/08/2026
Gotham CommunicationsGeneral Contractor603/21/2026
Awl IndustriesGeneral Contractor610/20/2026
Skyworx ContractingScaffold407/08/2026
Emg Industrial ChimneyScaffold303/21/2026
Maric MechanicalScaffold304/09/2026
Awl IndustriesScaffold304/09/2026
Eastern Plumbing & Mechanical ContractingPlumbing207/08/2026
Alliance Elevator CompanyElectrical203/21/2026
Thorn ElectricElectrical203/21/2026
A.T.J. Electrical CoElectrical203/21/2026
Jaylex NYCScaffold207/01/2026
Unisys ElectricElectrical203/21/2026
Roma ScaffoldingScaffold207/08/2026
Lit Mode Electrical ContgElectrical103/22/2026
Raiden ElectricElectrical103/22/2026
N.Y.C. Housing AuthorityElectrical103/21/2026
Woodside ElectricElectrical103/21/2026
Maric Mechanicalspecialty_contractor107/08/2026
P & K ContractingGeneral Contractor107/08/2026
Lina ElectricElectrical103/21/2026
Mac Fhionnghaile & SonsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections1471412/12/2025
R Marsac Consulting329503/07/2025
MT Group798202/11/2025
AK Consulting Services, I6198711/08/2024
Bitopi Consultants7036310/22/2024
Tectonic Engineering Cons106102/07/2024
Esnyc Consulting4099203/12/2022
Building Lifecycle
All (299)Filed (50)Permit Issued (54)Signed Off (11)Facade (FISP) (16)Violation (60)Objection (78)Special Inspection (30)
10/19/2026
Permit issued — Mechanical Systems
M00614696-I1-MS
10/06/2026
Filed — Alteration
NYCHA EAST RIVER BOILERS CONSISTING OF MECHANICAL WORK FOR BOILER REPLACEMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00614696-P1
10/06/2026
Permit issued — General Construction
M00606169-I1-GC
09/28/2026
Special inspection requirement — Mechanical Systems
09/28/2026
Special inspection requirement — Final
09/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/28/2026
Special inspection requirement — Chimneys and vents
09/24/2026
Filed — Alteration
NYCHA EAST RIVER BOILERS CONSISTING OF MECHANICAL WORK FOR BOILER REPLACEMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00614696-S1
09/18/2026
Special inspection requirement — Mechanical Systems
09/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/18/2026
Special inspection requirement — Final
09/18/2026
Special inspection requirement — Chimneys and vents
06/28/2026
Filed — Alteration
ENGINEERED ENCLOSURE SYSTEM INSTALLATION AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022BC
M01371082-P1
06/25/2026
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B,C
M01369393-P1
06/12/2026
Filed — Alteration
M00231725-P1
04/20/2026
Permit issued — Protection and Mechanical Methods
M01371082-I1-PMM
04/20/2026
Permit issued — Supported Scaffold
M01369393-I1-SF
04/14/2026
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B,C
M01369393-I1
04/14/2026
Filed — Alteration
ENGINEERED ENCLOSURE SYSTEM INSTALLATION AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022BC
M01371082-I1
04/02/2026
Permit issued — Plumbing
M00607271-I1-PL
02/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
02/04/2026
Permit issued — Construction Fence
M00231725-I1-FN
01/23/2026
Violation issued (FDNY_NOV, closed)
12/12/2025
Filed — Alteration
NYCHA EAST RIVER BOILERS CONSISTING OF PLUMBING WORK IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00607271-P1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2025
Permit issued — Construction Fence
M00606169-S2-FN
10/21/2025
Permit issued — Mechanical Systems
M00614696-I1-MS
10/07/2025
Permit issued — General Construction
M00606169-I1-GC
06/11/2025
Signed off — Alteration
FACADE RESTORATION AS PER INDICATED ON PLAN. NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01006119-I1
05/12/2025
Cycle 9 facade report signed — SAFE
04/15/2025
Permit issued — Plumbing
M00607271-I1-PL
03/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 410 EAST 105TH STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01081828-I1
03/25/2025
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR THE HANGING PLATFORM AND MATERIAL HOIST FOR THE RESTORATION WORK AT 410 EAST 105TH STREET, MANHATTAN, NY 10029
M01038570-I1
03/25/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 410 EAST 105 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01081926-I1
03/25/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 410 EAST 105 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00457803-I1
03/17/2025
Signed off — Alteration
Dish - Temporary relocation of equipment cabinets to temporary platform on roof. Equipment to be replaced in prior locations. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M01127357-I1
03/07/2025
Filed — Alteration
Dish - Temporary relocation of equipment cabinets to temporary platform on roof. Equipment to be replaced in prior locations. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M01127357-P1
02/27/2025
Cycle 9 facade report submitted
02/26/2025
Cycle 9 facade inspection completed
02/11/2025
Filed — Alteration
FACADE RESTORATION AS PER INDICATED ON PLAN. NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01006119-P3
02/11/2025
Permit issued — Sidewalk Shed
M00457803-I1-SH
02/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Marisa Harte
02/05/2025
Special inspection requirement — Masonry
Marisa Harte
02/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Marisa Harte
02/05/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
01/27/2025
Permit issued — Antenna
M01127357-I1-AN
11/12/2024
Permit issued — Construction Fence
M00606169-S2-FN
11/08/2024
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR THE HANGING PLATFORM AND MATERIAL HOIST FOR THE RESTORATION WORK AT 410 EAST 105TH STREET, MANHATTAN, NY 10029
M01038570-P7
11/08/2024
Permit issued — Suspended Scaffold
M01038570-P6-SC
11/08/2024
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
11/08/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
11/01/2024
Filed — Alteration
Dish - Temporary relocation of equipment cabinets to temporary platform on roof. Equipment to be replaced in prior locations. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M01127357-I1
10/31/2024
Permit issued — Construction Fence
M00231725-I1-FN
10/30/2024
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR THE HANGING PLATFORM AND MATERIAL HOIST FOR THE RESTORATION WORK AT 410 EAST 105TH STREET, MANHATTAN, NY 10029
M01038570-P6
10/30/2024
Special inspection requirement — Post-installed Anchors
MAHFUZAR RAHMAN
10/30/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MAHFUZAR RAHMAN
10/24/2024
Filed — Alteration
NYCHA EAST RIVER BOILERS CONSISTING OF " GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00606169-S2
Latest 60 of 299 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAwl Industries10/19/2026
DOB NOWGeneral ConstructionPermit IssuedAwl Industries10/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedJaylex NYC04/20/2026
DOB NOWSupported ScaffoldPermit IssuedJaylex NYC04/20/2026
DOB NOWPlumbingPermit IssuedEastern Plumbing & Mechanical Contracting04/02/2026
DOB NOWConstruction FencePermit IssuedMaric Mechanical02/04/2026
DOB NOWConstruction FencePermit IssuedAwl Industries11/06/2025
DOB NOWMechanical SystemsPermit IssuedAwl Industries10/21/2025
DOB NOWGeneral ConstructionPermit IssuedAwl Industries10/07/2025
DOB NOWPlumbingPermit IssuedEastern Plumbing & Mechanical Contracting04/15/2025
DOB NOWSidewalk ShedSigned-offMNK Enterprises02/11/2025
DOB NOWAntennaSigned-offGotham Communications01/27/2025
DOB NOWConstruction FencePermit IssuedAwl Industries11/12/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng11/08/2024
DOB NOWConstruction FencePermit IssuedMaric Mechanical10/31/2024
DOB NOWMechanical SystemsPermit IssuedAwl Industries10/21/2024
DOB NOWGeneral ConstructionPermit IssuedAwl Industries10/17/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng10/03/2024
DOB NOWConstruction FenceSigned-offMNK Enterprises09/30/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng09/18/2024
DOB NOWSupported ScaffoldSigned-offMNK Enterprises08/23/2024
DOB NOWGeneral ConstructionSigned-offP & K Contracting08/12/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng08/06/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N Construction & Consultng07/24/2024
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises07/22/2024
DOB NOWSuspended ScaffoldSigned-offD&N Construction & Consultng05/15/2024
DOB NOWSuspended ScaffoldPermit IssuedPPM Telecom04/24/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises02/05/2024
DOB NOWAntennaSigned-offGotham Communications12/14/2023
DOB NOWPlumbingPermit IssuedV. C. Vitanza Sons08/16/2023
DOB NOWBoiler EquipmentPermit IssuedV. C. Vitanza Sons08/15/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises03/06/2023
DOB NOWBoiler EquipmentPermit IssuedV. C. Vitanza Sons01/11/2023
DOB NOWBoiler EquipmentPermit IssuedV. C. Vitanza Sons09/15/2022
DOB NOWPlumbingPermit IssuedV. C. Vitanza Sons09/15/2022
DOB NOWSupported ScaffoldPermit IssuedEmg Industrial Chimney05/19/2022
DOB NOWSidewalk ShedSigned-offSkyworx Contracting04/13/2022
DOB NOWSidewalk ShedSigned-offSkyworx Contracting03/04/2022
DOB NOWPlumbingPermit IssuedV. C. Vitanza Sons09/17/2021
DOB NOWBoiler EquipmentPermit IssuedV. C. Vitanza Sons09/17/2021
+ 60 more permits on file
2 projects · most recent 12/12/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/12/2025Permit IssuedEastern Plumbing & Mechanical ContractingGas, Storm, Water/Sanitary
05/01/2022Permit IssuedV. C. Vitanza SonsGas
17 projects · most recent 05/12/2026
General Wiring
FiledStatusContractorScope
05/12/2026CompleteTristrux2 meters, 1 new_meters
05/16/2025Permit IssuedA.T.J. Electrical Co—
03/03/2025Permit IssuedA.T.J. Electrical CoGeneral Wiring
11/14/2024Permit IssuedDaven Electric—
07/05/2024CompleteLit Mode Electrical Contg—
07/05/2024CompleteLit Mode Electrical Contg—
08/23/2022CompleteMac Fhionnghaile & SonsGeneral Wiring
07/27/2022CompleteIdl Communications and2 meters, 2 new_meters
02/08/2021CompleteAmin Electrical—
10/19/2020Permit IssuedRobert ChimentiGeneral Wiring
09/13/2019Permit IssuedTru-Val ElectricGeneral Wiring
08/20/2019Permit IssuedKLK Electric—
03/06/2019CompleteUSA Elect'l Services—
10/12/2018CancelledRaiden Electric—
10/09/2018Permit IssuedEia ElectricGeneral Wiring
2 projects · most recent 06/25/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/25/2026Permit IssuedJaylex NYCScaffold
07/24/2024Permit IssuedMNK EnterprisesSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
09/28/2026Mechanical Systems—special
09/28/2026Final—progress
09/28/2026Tenant Protection Plan Compliance—special
09/28/2026Chimneys and vents—special
09/18/2026Mechanical Systems—special
09/18/2026Tenant Protection Plan Compliance—special
09/18/2026Final—progress
09/18/2026Chimneys and vents—special
02/11/2026Fire-Resistant Penetrations and JointsJACOB HAASspecial
02/05/2025Tenant Protection Plan ComplianceMarisa Hartespecial
02/05/2025MasonryMarisa Hartespecial
02/05/2025Structural Stability – Alterations of existing buildingsMarisa Hartespecial
02/05/2025FinalMICHAEL KALINOWSKIprogress
11/08/2024Post-installed AnchorsMAHFUZAR RAHMANspecial
11/08/2024Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
10/30/2024Post-installed AnchorsMAHFUZAR RAHMANspecial
10/30/2024Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
10/22/2024Post-installed AnchorsKAMRUL AHSANspecial
09/09/2024Post-installed AnchorsMAHFUZAR RAHMANspecial
09/09/2024Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
09/05/2024Post-installed AnchorsKAMRUL AHSANspecial
07/31/2024Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
07/31/2024Post-installed AnchorsMAHFUZAR RAHMANspecial
07/17/2024Alternative Materials - OTCR Buildings Bulletin NumberMAHFUZAR RAHMANspecial
07/17/2024Post-installed AnchorsMAHFUZAR RAHMANspecial
Latest 25 of 44.
▾Documents — 558 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch34
09/06/2026M00092170-I1Request digital key ↗
09/02/2026M00614049-I1Request digital key ↗
09/02/2026M00614696-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00143489-I1Request digital key ↗
09/05/2026M00197773-I1Request digital key ↗
09/04/2026M00457803-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
09/05/2026M00231725-P2Request digital key ↗
09/05/2026M00231725-P1Request digital key ↗
09/05/2026M00231725-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00463059-I1Request digital key ↗
09/02/2026M00231734-I1Request digital key ↗
09/02/2026M00231734-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/05/2026M00231735-I1Request digital key ↗
08/14/2026M00353988-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00231730-I1Request digital key ↗
08/15/2026M00231730-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/04/2026M00463059-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00197435-I1Request digital key ↗
▸Applications & Permits95
▸BISPLAN / WORK APPROVAL APPLICATION48
09/17/2025122136214Open ↗
12/23/2022122136214Open ↗
11/09/2022122136214Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION47
12/28/2020122136214Open ↗
12/28/2020122136214Open ↗
12/28/2020122136214Open ↗
Showing 3 of 47 on file for this type
▸Seals & Professional Certifications120
▸DOB NOWDPL-1: Design Professional Seal & Signature43
10/05/2026M00614696-S1Open ↗
10/05/2026M00614696-P1Open ↗
09/05/2026M00197435-I1Open ↗
Showing 3 of 43 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
09/25/2018140467233Open ↗
09/25/2018140467233Open ↗
09/25/2018140467162Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/20/2026M01038570-P7Open ↗
09/20/2026M01038570-P7Open ↗
09/02/2026M00607271-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M00143489-I1Open ↗
08/28/2026M00231730-I1Open ↗
08/28/2026M00231730-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
02/21/2018140741981Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
02/21/2018140741981Open ↗
Showing 1 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
02/21/2018140741981Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
03/12/2021140997964Open ↗
03/05/2021140997973Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING5
12/23/2022122136214Open ↗
12/23/2020122136214Open ↗
12/14/2020122136214Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/27/2018122136214Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
05/12/2022110441451Open ↗
02/06/2017122136214Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/01/2025122136214Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/01/2025122136214Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026M00463059-I1Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes2
02/28/2017122136214Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTenant Protection Plan2
09/05/2026M00197435-I1Open ↗
08/13/2026M00197773-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/12/2021140997964Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/02/2026M00614049-I1Open ↗
08/29/2026M00913232-I1Open ↗
08/25/2026M01127357-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORM PRIOR TO SIGN OFF: TRU5142MN181
01/17/2024122136214Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/11/2022122136214Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01006119-I1Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
11/08/2022122136214Open ↗
11/08/2022122136214Open ↗
10/06/2022122136214Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/02/2018122136214Open ↗
08/11/2017140580306Open ↗
06/14/2017140580306Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/11/2017140580306Open ↗
06/14/2017140580306Open ↗
05/25/2017140580306Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026M00231735-I1Open ↗
08/13/2026M00231730-I1Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/01/2025122136214Open ↗
▸BISELECTRIC MOTORS1
12/02/2022122136214Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/20/2024122136214Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/16/2022122136214Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports39
▸BISTECHNICAL REPORT: RESPONSIBILITY26
10/28/2022122136214Open ↗
10/06/2022122136214Open ↗
10/06/2022122136214Open ↗
Showing 3 of 26 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS2
01/23/2024122136214Open ↗
01/23/2024122136214Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/15/2021122136214Open ↗
02/02/2018122136214Open ↗
▸BISMECHANICAL SYSTEMS1
05/01/2025122136214Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/02/2018122136214Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/01/2025122136214Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
12/15/2025122136214Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/01/2025122136214Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/01/2025122136214Open ↗
▸BISMASONRY1
05/01/2025122136214Open ↗
▸Approvals, Objections & Sign-offs90
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter49
10/05/2026M00614696-S1Open ↗
10/05/2026M00614696-P1Open ↗
09/05/2026M00197435-I1Open ↗
Showing 3 of 49 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
01/07/2026122136214Open ↗
09/25/2018140467233Open ↗
09/25/2018140467162Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)8
08/20/2026M00607271-I1Open ↗
08/13/2026M00353988-I1Open ↗
08/13/2026M00614049-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER5
12/28/2020122136214Open ↗
12/28/2020122136214Open ↗
12/28/2020122136214Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER5
01/26/2018140467162Open ↗
02/03/2017140467162Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/13/2026M00913232-I1Open ↗
08/13/2026M00639250-I1Open ↗
08/13/2026M00457803-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/30/2019122136214Open ↗
02/02/2018122136214Open ↗
Showing 2 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
02/28/2017122136214Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M01006119-I1Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT17
03/12/2021140997964Open ↗
03/05/2021140997973Open ↗
03/02/2021122136214Open ↗
Showing 3 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/15/2023122136214Open ↗
▸Filing & Intake Forms47
▸BISADDITIONAL INFORMATION21
01/02/2023122136214Open ↗
11/19/2022122136214Open ↗
11/19/2022122136214Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
03/12/2021140997964Open ↗
03/05/2021140997973Open ↗
02/21/2018140741981Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
12/28/2020122136214Open ↗
05/29/2019122136214Open ↗
09/25/2018140467233Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M01127357-P1Open ↗
▸Other Documents25
▸DOB NOWManufacturer's Specifications7
08/26/2026M01038570-P6Open ↗
08/26/2026M01038570-P5Open ↗
08/26/2026M01038570-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCalculations7
08/26/2026M01038570-P6Open ↗
08/26/2026M01038570-P5Open ↗
08/26/2026M01038570-P4Open ↗
Showing 3 of 7 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/14/2018122136214Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026M01369393-I1Open ↗
08/13/2026M01371082-I1Open ↗
▸BIS* FEMA FORM (81-31): ELEVATION CERTIFICATE1
12/11/2023122136214Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
12/16/2022122136214Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
05/01/2025122136214Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01033173-I1Open ↗