← Back
Other miscellaneous
Terminal Market
410 HALLECK STREET · Hunts Point · BIN 2109488
💬 Discuss this project
1960Year Built
2Stories
Z9Building Class
M1-1Zoning
1,172,005 sfGross Floor Area
252Units
LL97 Covered7 Open Violations 6 unresolved · 1 paperwork only ▸
Other miscellaneous · Owner of record: NYC DEPARTMENT OF SMALL BUSINESS SERVICES · 5,612,000 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 124p · 5 filings · 20 docs
Site & exterior8p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC ECONOMIC DEVELOPMENT CORP5508/29/2026
ECONOMIC DEVELOPMENT803/21/2026
NYCEDC403/21/2026
NYC TERM MKT STORES 238 TO 241103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GIRANDOLA & SHUTKIND803/19/2026
LOVE OF DESIGN PLLC310/07/2025
EDWARD C. HICKS RA312/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANGELA RIVERA303/21/2026
JAM CONSULTANTS, INC.503/21/2026
METROPOLIS GROUP INC203/21/2026
JOHN STACOM ARCHITECTURAL DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALKLEM PLUMBING INCPlumbing507/08/2026
CRISTOM CONSTRUC SERV INCGeneral Contractor306/27/2026
GIRANDOLA & SHUTKIND CONSGeneral Contractor307/08/2026
J.A. MECH. PLBG. & HTG INPlumbing207/08/2026
DENNIS HEAVENElectrical103/21/2026
J.M.C. ELECTRICAL CORP.Electrical103/22/2026
JOSEPH CASSESE, JR.Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NS ENGINEERING & CONSULTI3652210/01/2024
CROSSCHECK INSPECTION SER544101/03/2023
Building Lifecycle
All (62)Filed (14)Permit Issued (12)Signed Off (6)Violation (8)Inspection (7)Objection (8)Special Inspection (7)
07/01/2026
Signed off — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-I1
06/29/2026
Signed off — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-S2
06/24/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
06/08/2026
Permit issued — Mechanical Systems
X00936212-S2-MS
04/30/2026
Permit issued — General Construction
X01366859-I1-GC
04/20/2026
Permit issued — General Construction
X01366859-I1-GC
03/19/2026
Filed — Alteration
Filing for interior alteration work to include the removal and installation of non load bearing walls and non load bearing beams.
X01366859-I1
03/04/2026
Special inspection requirement — Final
EUGENE BIFULCO
02/10/2026
Signed off — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-S1
10/07/2025
Filed — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-P3
07/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/18/2025
Permit issued — Plumbing
X00936212-S1-PL
06/18/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Filed — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-P2
10/01/2024
Filed — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-S2
08/30/2024
Special inspection requirement — Mechanical Systems
NARI MOTWANI
08/30/2024
Special inspection requirement — Final
Gina Muzio
08/29/2024
Objection resolved — Addressed
08/02/2024
Objection raised — Scope
07/24/2024
Filed — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-P1
05/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/02/2024
Permit issued — Plumbing
X00936212-S1-PL
03/27/2024
Objection resolved — Addressed
03/27/2024
Objection resolved — Addressed
03/20/2024
Objection raised — Scope
03/20/2024
Objection raised — Scope
03/08/2024
Filed — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-S1
11/20/2023
Signed off — Alteration
No exterior work. RECONNECT AND REACTIVATE EX.GAS METER AT UNIT 369 IN ROW C OF HUNTSPOINTPRODUCE MARKET
X00807221-I1
10/26/2023
Signed off — Alteration
Rerouting gas piping of existing gas pipe line.
X00414832-I1
10/26/2023
Permit issued — General Construction
X00936212-I1-GC
10/20/2023
Signed off — Alteration
Filing for interior demolition and general construction as per plans filed. No change in use, egress or occupancy.
X08054779-I1
10/19/2023
Objection resolved — Addressed
10/13/2023
Objection raised — Scope
10/11/2023
Filed — Alteration
Install new sink, eye washing station and floor drains and drain for evaporators. New gas piping for Infrared heating units over the exterior loading dock.
X00936212-I1
09/19/2023
Special inspection requirement — Masonry
NARI MOTWANI
09/19/2023
Special inspection requirement — Final
Gina Muzio
09/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/30/2023
Filed — Alteration
No exterior work. RECONNECT AND REACTIVATE EX.GAS METER AT UNIT 369 IN ROW C OF HUNTSPOINTPRODUCE MARKET
X00807221-P1
05/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/23/2023
Permit issued — Plumbing
X00807221-I1-PL
03/07/2023
Permit issued — General Construction
X08054779-I1-GC
02/07/2023
Filed — Alteration
No exterior work. RECONNECT AND REACTIVATE EX.GAS METER AT UNIT 369 IN ROW C OF HUNTSPOINTPRODUCE MARKET
X00807221-I1
01/03/2023
Filed — Alteration
Filing for interior demolition and general construction as per plans filed. No change in use, egress or occupancy.
X08054779-I1
12/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
12/14/2022
Special inspection requirement — Final
RICHARD SHUTKIND
11/04/2022
Permit issued — Plumbing
X00414832-I1-PL
02/11/2022
Filed — Alteration
Rerouting gas piping of existing gas pipe line.
X00414832-P3
11/23/2021
Permit issued — Plumbing
X00414832-I1-PL
11/05/2021
Filed — Alteration
Rerouting gas piping of existing gas pipe line.
X00414832-P2
09/28/2021
Filed — Alteration
Rerouting gas piping of existing gas pipe line.
X00414832-P1
03/22/2021
Permit issued — Plumbing
X00414832-I1-PL
01/12/2021
Permit issued — Plumbing
X00414832-I1-PL
12/10/2020
Filed — Alteration
Rerouting gas piping of existing gas pipe line.
X00414832-I1
05/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2014
Violation issued (ECB, open)
Construction
11/20/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCRISTOM CONSTRUC SERV INC06/08/2026
DOB NOWGeneral ConstructionPermit IssuedGIRANDOLA & SHUTKIND CONS04/30/2026
DOB NOWGeneral ConstructionPermit IssuedGIRANDOLA & SHUTKIND CONS04/20/2026
DOB NOWPlumbingSigned-offJ.A. MECH. PLBG. & HTG IN06/18/2025
DOB NOWPlumbingSigned-offJ.A. MECH. PLBG. & HTG IN05/02/2024
DOB NOWGeneral ConstructionSigned-offCRISTOM CONSTRUC SERV10/26/2023
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC03/23/2023
DOB NOWGeneral ConstructionSigned-offGIRANDOLA SHUTKIND CONS03/07/2023
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC11/04/2022
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC11/23/2021
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC03/22/2021
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC01/12/2021
BISOTISSUEDGIRANDOLA & SHUTKIND CONS12/03/2020
BISOTISSUEDGIRANDOLA & SHUTKIND CONS02/28/2020
BISOTISSUEDGIRANDOLA & SHUTKIND CONS02/28/2020
BISOTISSUEDJ. SMITH CONSTRUCTION INC.06/29/2018
BISPLISSUEDB & A PLBG & HTG CORP09/22/2017
BISOTISSUEDCORE MECHANICAL CONTRACTING07/28/2017
BISPLISSUEDJAG PLBG & MECH INC07/21/2017
BISMHISSUEDDGC CAPITAL CONTRACTING CORP07/07/2017
BISOTISSUEDDGC CAPITAL CONTRACTING CORP07/07/2017
BISPLISSUEDB & A PLBG & HTG CORP05/13/2016
BISOTISSUEDGIRANDOLA & SHUTKIND CONS05/09/2016
BISMHISSUEDGIRANDOLA & SHUTKIND CONS05/09/2016
BISMHISSUEDLNC INTERNATIONAL INC12/29/2011
BISPLISSUEDPETER PLUMBING ASSOC. INC.12/07/2011
BISMHISSUEDLNC INTERNATIONAL INC11/03/2011
BISMHISSUEDLNC INTERNATIONAL INC11/03/2011
1 project · most recent 10/07/2025
Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
10/07/2025Signed-offCRISTOM CONSTRUC SERV INCRefrigeration Systems
Refrigeration
Bohn BEH0653DS4EYA 13,200 CFM ×2
BEM0490DS4EPA 8,800 CFM ×2
BCH0100MDACD 97,718 BTU · Condensing Unit ×1
BCV0200MDACD 171,787 BTU · Condensing Unit ×1
1 project · most recent 10/07/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/07/2025Signed-offJ.A. MECH. PLBG. & HTG INGas, Water/Sanitary
11 projects · most recent 08/22/2022
General Wiring Lighting
FiledStatusContractorScope
08/22/2022Permit IssuedCAMPISANO ELECTRIC INCGeneral Wiring
08/02/2022Permit IssuedJ.M.C. ELECTRICAL CORP.1 new_meters
09/20/2021Permit IssuedJ.M.C. ELECTRICAL CORP.3 meters
09/09/2021Permit IssuedR.C.M. ELECTRIC CORP.—
09/29/2020Permit IssuedJ.M.C. ELECTRICAL CORP.General Wiring
07/08/2020CompleteJ.M.C. ELECTRICAL CORP.—
02/05/2020CompleteCAMPISANO ELECTRIC INC—
12/24/2019CompleteSMALLS ELEC'L CONSTR. INCGeneral Wiring
06/26/2019Permit IssuedJ.M.C. ELECTRICAL CORP.General Wiring
05/24/2019Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
10/31/2018CompleteSMALLS ELEC'L CONSTR. INCGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/24/2026Pass-Final Sign Permit InspectionPassView ↗
07/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
03/04/2026FinalEUGENE BIFULCOprogress
08/30/2024Mechanical SystemsNARI MOTWANIspecial
08/30/2024FinalGina Muzioprogress
09/19/2023MasonryNARI MOTWANIspecial
09/19/2023FinalGina Muzioprogress
12/14/2022Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
12/14/2022FinalRICHARD SHUTKINDprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AJ ProduceRetailGround
Project X08054779 Alteration · LOC Issued · 01/03/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 291 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch8
08/23/2026X08054779-I1Request digital key ↗
08/18/2026X00936212-S1Request digital key ↗
08/18/2026X00936212-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026X00414832-I1Request digital key ↗
08/25/2026X00414832-P2Request digital key ↗
08/15/2026X00414832-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION27
10/20/2020240289406Open ↗
02/19/2020220726356Open ↗
02/19/2020220726365Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION18
12/03/2020240289406Open ↗
02/28/2020220726365Open ↗
02/28/2020220726356Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
02/19/2020220726356Open ↗
02/19/2020220726365Open ↗
01/10/2020220536711Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026X00414832-P1Open ↗
08/25/2026X00414832-P2Open ↗
08/25/2026X00414832-P3Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
02/19/2020220726356Open ↗
02/19/2020220726365Open ↗
04/05/2018220642455Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
10/20/2020240289406Open ↗
02/25/2020220726356Open ↗
02/19/2020220726365Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026X08054779-I1Open ↗
09/01/2026X00936212-S2Open ↗
08/27/2026X00936212-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X08054779-I1Open ↗
09/01/2026X00936212-S2Open ↗
08/27/2026X00936212-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/20/2020240289406Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/14/2016220536711Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/20/2020240289406Open ↗
▸Trade Schedules & Equipment30
▸BISEQUIPMENT USE APPLICATION/PERMIT11
06/27/2017220587791Open ↗
03/15/2016220172480Open ↗
03/15/2016220172480Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
06/27/2018220642455Open ↗
04/05/2018220642455Open ↗
11/30/2017220608956Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS7
02/07/2012220157121Open ↗
02/07/2012220157121Open ↗
01/27/2012220138848Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
12/19/2011220138848Open ↗
▸Safety & Tenant Protection1
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/10/2016220172480Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
10/20/2020240289406Open ↗
02/25/2020220726356Open ↗
02/19/2020220726365Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026X00414832-P1Open ↗
08/25/2026X00414832-P3Open ↗
08/25/2026X00414832-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/19/2013220321541Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/31/2017220608956Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
02/19/2020220726356Open ↗
02/19/2020220726365Open ↗
08/07/2019220642455Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
02/03/2012220138848Open ↗
01/27/2012220138848Open ↗
01/20/2012220157121Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
08/07/2019220642455Open ↗
01/20/2012220157121Open ↗
01/05/2012220138848Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/20/2020240289406Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/20/2020240289406Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/21/2020240289406Open ↗
10/20/2020240289406Open ↗
10/20/2020240289406Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/07/2019220642455Open ↗
▸Approvals, Objections & Sign-offs32
▸BISLETTERS - SUPPORTING DOCUMENTATION11
02/19/2020220726356Open ↗
02/19/2020220726365Open ↗
07/31/2017220608956Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/17/2026X01366859-I1Open ↗
08/13/2026X08054779-I1Open ↗
08/13/2026X00936212-S1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
08/07/2019220642455Open ↗
02/03/2012220138848Open ↗
01/20/2012220157121Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/19/2013220321541Open ↗
Showing 1 of 4 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
10/20/2020240289406Open ↗
06/27/2017220587791Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
10/20/2020240289406Open ↗
02/19/2020220726356Open ↗
02/19/2020220726365Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET15
02/19/2020220726356Open ↗
02/19/2020220726365Open ↗
04/05/2018220642455Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION10
02/25/2020220726365Open ↗
02/25/2020220726356Open ↗
08/07/2019220642455Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/20/2020240289406Open ↗
▸BISBOROUGH INTAKE FORM1
08/07/2019220642455Open ↗
▸Other Documents4
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026X00807221-I1Open ↗
08/13/2026X00807221-P1Open ↗
▸BISFEMA FORM (81-65): DRY FLOOD-PROOFING CERTIFICATE1
06/27/2017220587791Open ↗
▸DOB NOWWaiver Document1
08/18/2026X00936212-I1Open ↗