Elevator cooperative
415 EAST 80 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1050361
💬 Discuss this project
1959Year Built
5Stories
D4Building Class
R8BZoning
42,570 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized2 Open Violations ▸
Elevator cooperative · Owner of record: 415 EAST 80TH STREET HOUSING CORP · 10,217 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 6 docs
Floor 2Under Construction12p · 2 filings · 16 docs
Floor 1
Site & exterior20p · 4 filings · 14 docs
Filed — no permit issued13p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
415 EAST 80TH STREET HOUSING COR1203/22/2026
SKYLINE SCAFFOLDING GROUP807/08/2026
KINGS GROUP NY CORP703/22/2026
C O AKAM ASSOCIATES203/21/2026
AKAM ASSOCIATES, INC.203/21/2026
HI QUALITY CONSTRUCTION CORP.103/22/2026
514 EAST 80TH STREET HOUSING COR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEAP ARCHITECTURE308/06/2026
ARCHITECTURE WORKSHOP PC205/13/2025
JBA209/30/2024
ASHRAF CORP106/28/2024
URBAN INTEGRATIONS206/27/2023
JOEL PHAGOO P.E. PLLC104/21/2022
FALCON ENGINEERING CO. LLC104/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EDWARD F ZEVALLOS ARCHITECT403/21/2026
KC EXPEDITING403/21/2026
RIGGING CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE203/21/2026
Rigid Structural Design, LLC203/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor1007/08/2026
KINGS GROUP NY CORPGeneral Contractor603/21/2026
HI QUALITY CONSTRUCTION *General Contractor603/21/2026
CASTCAPA CONSTRUCTION LLCGeneral Contractor504/09/2026
AMERICAN QUALITY CONSTRUCGeneral Contractor304/09/2026
SKYLINE BUILDERS GROUP LLGeneral Contractor204/09/2026
ALB-BROS CONSTR CORPGeneral Contractor206/28/2026
GJ PLUMBING LLCPlumbing107/08/2026
VALENTIS ELECTRIC, INC.Electrical103/22/2026
ABR PLBG&HTG CONTR INCPlumbing107/08/2026
PHILIP ZUARDIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDWARD F ZEVALLOS ARCHITE1025205/13/2025
WORLD DESIGN ARCHITECTURE9323109/30/2024
PCS ENGINEERING3745209/23/2024
FALCON ENGINEERING CO.LLC5649104/01/2022
Building Lifecycle
All (106)Filed (14)Permit Issued (21)Signed Off (6)Violation (29)Inspection (8)Objection (18)Special Inspection (10)
08/06/2026
Filed — Alteration
Replace existing tub with new shower pan.
M01440622-S1
08/05/2026
Filed — Alteration
Replace existing tub with new shower pan.
M01440622-I1
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2026
Special inspection requirement — Final
06/26/2026
Filed — Alteration CO
Removal of an interior partition in the kitchen, new island, replacement of the existing tub with a new shower and associated waterproofing. New light fixtures (15 recessed cans) throughout.
M01399999-I1
06/26/2026
Permit issued — General Construction
M01188708-I1-GC
06/25/2026
Signed off — Alteration
FILING FOR PLUMBING WORK TO REPLACE FIXTURES AS PER PLANS.
M01109344-I1
06/11/2026
Signed off — Alteration
Facade Restoration & Roof Replacement Project. No change in use, egress or occupancy.
M00668023-I1
04/20/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/24/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/04/2026
Permit issued — General Construction
M01109344-I1-GC
12/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/09/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL WORK TO COMPLY WITH CHAPTER 33 OF THE NYCC
M01069152-I1
10/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/04/2025
Permit issued — Plumbing
M01188708-S1-PL
07/22/2025
Permit issued — General Construction
M01188708-I1-GC
07/16/2025
Permit issued — General Construction
M00668023-I1-GC
07/11/2025
Objection resolved — Addressed
06/30/2025
Signed off — Alteration
FILING FOR PLUMBING WORK TO REPLACE FIXTURES AS PER PLANS.
M01109344-S1
06/18/2025
Permit issued — Suspended Scaffold
M01055056-I1-SC
06/18/2025
Permit issued — Sidewalk Shed
M01069152-I1-SH
06/16/2025
Permit issued — General Construction
M00668023-I1-GC
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Scope
05/29/2025
Objection raised — Plumbing
05/29/2025
Objection raised — Plumbing
05/29/2025
Objection raised — Energy
05/29/2025
Objection raised — Admin
05/29/2025
Objection raised — Energy
05/27/2025
Objection raised — Scope
05/27/2025
Objection raised — Scope
05/13/2025
Filed — Alteration
Combination of Apt's 2M and 2N as per TPPN 3/97. Remove and install interior partitions, doors and finishes. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01188708-I1
05/13/2025
Filed — Alteration
Combination of Apt's 2M and 2N as per TPPN 3/97. Remove and install interior partitions, doors and finishes. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01188708-S1
04/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2025
Special inspection requirement — Lighting in dwelling units
Robert Garneau
03/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Zevallos
03/02/2025
Special inspection requirement — Final
Robert Garneau
01/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2025
Permit issued — General Construction
M01109344-I1-GC
11/13/2024
Permit issued — Plumbing
M01109344-S1-PL
11/08/2024
Permit issued — General Construction
M01109344-I1-GC
11/06/2024
Permit issued — General Construction
M01109344-I1-GC
09/30/2024
Filed — Alteration
FILING FOR PLUMBING WORK TO REPLACE FIXTURES AS PER PLANS.
M01109344-I1
09/30/2024
Filed — Alteration
FILING FOR PLUMBING WORK TO REPLACE FIXTURES AS PER PLANS.
M01109344-S1
09/27/2024
Permit issued — Suspended Scaffold
M01055056-P1-SC
09/23/2024
Filed — Alteration
Facade Restoration Via Suspended Scaffolding
M01055056-P1
09/20/2024
Special inspection requirement — Post-installed Anchors
Michael Walsh
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
06/28/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL WORK TO COMPLY WITH CHAPTER 33 OF THE NYCC
M01069152-I1
06/28/2024
Permit issued — Sidewalk Shed
M01069152-I1-SH
06/18/2024
Permit issued — General Construction
M00668023-I1-GC
06/05/2024
Permit issued — Suspended Scaffold
M01055056-I1-SC
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedALB-BROS CONSTR CORP06/26/2026
DOB NOWGeneral ConstructionSigned-offAMERICAN QUALITY CONSTRUC03/04/2026
DOB NOWPlumbingSigned-offTVS MECHANICAL CORP08/04/2025
DOB NOWGeneral ConstructionPermit IssuedALB-BROS CONSTR CORP07/22/2025
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION07/16/2025
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP06/18/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/18/2025
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION06/16/2025
DOB NOWGeneral ConstructionSigned-offHI QUALITY CONSTRUCTION *01/07/2025
DOB NOWPlumbingSigned-offABR PLBG&HTG CONTR INC11/13/2024
DOB NOWGeneral ConstructionSigned-offHI QUALITY CONSTRUCTION *11/08/2024
DOB NOWGeneral ConstructionSigned-offAMERICAN QUALITY CONSTRUC11/06/2024
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP09/27/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/28/2024
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION06/18/2024
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP06/05/2024
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP06/08/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/15/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP04/13/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL09/22/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE BUILDERS GROUP LL06/03/2022
BISOTISSUEDEUDA CONSTRUCTION &03/28/2018
BISPLISSUEDAMC PLBG, HTG & CLNG, INC03/28/2018
BISOTISSUEDSKYLINE RESTORATION INC09/11/2012
BISEQISSUEDEVEREST SCAFFOLDING INC06/29/2011
BISEQISSUEDRICHARD C. MUGLER CO. INC06/10/2011
BISEQISSUEDEVEREST SCAFFOLDING INC03/30/2011
BISOTISSUEDSKYLINE RESTORATION INC03/21/2011
BISOTISSUEDALTINA TILE CARE INC10/25/2010
BISOTISSUEDSKYLINE RESTORATION INC05/03/2010
BISEQISSUEDEVEREST SCAFFOLDING INC03/25/2010
BISEQISSUEDEVEREST SCAFFOLDING INC03/08/2010
BISEQISSUEDEVEREST SCAFFOLDING INC03/14/2009
BISEQISSUEDEVEREST SCAFFOLDING INC10/09/2008
BISOTISSUEDMASCON RESTORATION INC10/29/2004
BISOTISSUEDMCGOVERN INTERIORS03/29/2002
BISPLISSUEDM KRAUS INC06/16/1993
BISSPISSUEDM KRAUS INC06/16/1993
2 projects · most recent 08/06/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/06/2026——Water/Sanitary
05/13/2025Signed-offTVS MECHANICAL CORPGas, Water/Sanitary
6 projects · most recent 09/21/2025
General Wiring
FiledStatusContractorScope
09/21/2025CompleteLINA ELECTRIC, CORPGeneral Wiring
08/11/2025Permit IssuedETECH ELECTRICAL LLCGeneral Wiring
11/19/2024CompleteVALENTIS ELECTRIC, INC.General Wiring
07/08/2024CompleteHIGH QUALITY ELECTRIC OF—
03/29/2022Permit IssuedTOP SHELF ELECTRIC CORP—
07/17/2021CompleteCENTENNIAL ELEVATOR INDUSGeneral Wiring
1 project · most recent 09/23/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
09/23/2024Permit IssuedSPD CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/20/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/24/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/04/2026Fire-Resistant Penetrations and Joints—special
08/04/2026Final—progress
03/02/2025Lighting in dwelling unitsRobert Garneauenergy_progress
03/02/2025Fire-Resistant Penetrations and JointsEdward Zevallosspecial
03/02/2025FinalRobert Garneauprogress
09/20/2024Post-installed AnchorsMichael Walshspecial
09/19/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
03/21/2022Energy Code Compliance InspectionsAnthony Volpeprogress
01/24/2022FinalAnthony Volpeprogress
01/24/2022MasonryAnthony Volpespecial
▾Documents — 169 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/02/2026M00668023-I1Request digital key ↗
09/02/2026M00708301-I1Request digital key ↗
08/30/2026M00882175-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION17
07/25/2018123438752Open ↗
03/15/2018123438752Open ↗
03/05/2018123438752Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION10
03/28/2018123438752Open ↗
03/28/2018123438752Open ↗
09/12/2012121339006Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/21/2011120711916Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
03/21/2012110278725Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026M00668023-I1Open ↗
09/02/2026M00708301-I1Open ↗
08/30/2026M00882175-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
04/15/2019123438752Open ↗
03/05/2018123438752Open ↗
12/19/2012120736695Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
08/15/2012121339006Open ↗
07/01/2011120736695Open ↗
06/13/2011120711916Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/15/2012121339006Open ↗
07/01/2011120736695Open ↗
06/13/2011120711916Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026M00668023-I1Open ↗
08/24/2026M01109344-I1Open ↗
08/24/2026M01055056-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026M00668023-I1Open ↗
08/24/2026M01188708-I1Open ↗
08/24/2026M01188708-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/25/2018123438752Open ↗
03/05/2018123438752Open ↗
▸BISSCHEDULE B - PLUMBING1
01/04/2010120235735Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
03/28/2018123438752Open ↗
03/05/2018123438752Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026M01109344-S1Open ↗
08/26/2026M01109344-I1Open ↗
08/16/2026M01399999-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
07/01/2011120736695Open ↗
06/16/2011120711916Open ↗
05/04/2010120332443Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/19/2018123438752Open ↗
03/15/2018123438752Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
09/12/2012121339006Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/02/2026M00668023-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
04/15/2019123438752Open ↗
03/05/2018123438752Open ↗
12/13/2012121339006Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/15/2019123438752Open ↗
12/13/2012121339006Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
12/26/2019123438752Open ↗
11/26/2019123438752Open ↗
11/18/2019123438752Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
08/15/2012121339006Open ↗
07/01/2011120736695Open ↗
06/13/2011120711916Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/19/2019123438752Open ↗
03/21/2012110278725Open ↗
▸BISSHED LETTER1
05/13/2011110278725Open ↗
▸DOB NOWDEP Variance (V5) letter1
09/02/2026M00668023-I1Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
04/15/2019123438752Open ↗
03/05/2018123438752Open ↗
12/13/2012121339006Open ↗
Showing 3 of 12 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
07/12/2010120332443Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION10
08/06/2018123438752Open ↗
03/28/2018123438752Open ↗
10/04/2011120736695Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
12/26/2019123438752Open ↗
11/26/2019123438752Open ↗
11/26/2019123438752Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET5
03/05/2018123438752Open ↗
08/15/2012121339006Open ↗
07/01/2011120736695Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026M01055056-I1Open ↗
08/13/2026M01055056-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01055056-P1Open ↗
08/13/2026M01055056-I1Open ↗