← Back
Two stories - detached, small or mid-size
4154 DE REIMER AVENUE
BRONX · BIN 2069162
💬 Discuss this project
1920Year Built
2.75Stories
A1Building Class
R4-1Zoning
1,402 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,375 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Architecture
Basement1p · 1 filing · 8 docs
Nothing on file for this building.
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Signed Off (3)Inspection (3)Special Inspection (10)
03/06/2025
Signed off — Alteration
Provide the plumbing work for a new 3-fixture bathroom
X01089579-S1
02/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/16/2025
Permit issued — Plumbing
X01089579-S1-PL
01/15/2025
Signed off — Alteration
Provide the plumbing work for a new 3-fixture bathroom
X01089579-I1
11/20/2024
Filed — Alteration
Provide the plumbing work for a new 3-fixture bathroom
X01089579-S1
09/03/2024
Filed — Alteration
Provide the plumbing work for a new 3-fixture bathroom
X01089579-I1
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KARTIK CHANDA
07/31/2024
Special inspection requirement — Final
FRANCINE ALHEID
06/24/2021
Signed off — Alteration
Installation of new variable refrigerant flow heat pump mechanical system with one (1) outdoor unit and five (5) indoor units.
X00485930-I1
05/12/2021
Permit issued — Mechanical Systems
X00485930-I1-MS
03/23/2021
Filed — Alteration
Installation of new variable refrigerant flow heat pump mechanical system with one (1) outdoor unit and five (5) indoor units.
X00485930-I1
03/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Risbergs
03/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
03/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
Michael Risbergs
03/22/2021
Special inspection requirement — Maintenance information
Michael Risbergs
03/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
Michael Risbergs
03/22/2021
Special inspection requirement — Energy Code Compliance Inspections
Michael Risbergs
03/15/2021
Special inspection requirement — Final
NANIK MASSAND
03/15/2021
Special inspection requirement — Mechanical Systems
Michael Risbergs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/09/2016$318K—Private party → Private party$227/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANCINE A ALHEID, ARCHITECT211/20/2024
M.INT'L ENGINEERING PLLC103/23/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FULL SERVICE CONTRACTINGGeneral Contractor203/21/2026
VRF SOLUTIONS LLCGeneral Contractor107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHANDA ENG. CONSULTANT PC6842109/03/2024
METROSPEC SIA6420103/23/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC01/16/2025
DOB NOWMechanical SystemsSigned-offVRF SOLUTIONS LLC05/12/2021
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/31/2024Fire-Resistant Penetrations and JointsKARTIK CHANDAspecial
07/31/2024FinalFRANCINE ALHEIDprogress
03/22/2021HVAC-R and service water piping design and insulationMichael Risbergsenergy_progress
03/22/2021Fire-Resistant Penetrations and JointsMichael Risbergsspecial
03/22/2021HVAC-R and service water heating system controlsMichael Risbergsenergy_progress
03/22/2021Maintenance informationMichael Risbergsenergy_progress
03/22/2021HVAC-R and service water heating equipmentMichael Risbergsenergy_progress
03/22/2021Energy Code Compliance InspectionsMichael Risbergsprogress
03/15/2021FinalNANIK MASSANDprogress
03/15/2021Mechanical SystemsMichael Risbergsspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026X00485930-I1Request digital key ↗
08/21/2026X01089579-S1Request digital key ↗
08/21/2026X01089579-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature7
08/26/2026X01089579-I1Open ↗
08/25/2026X00485930-I1Open ↗
08/25/2026X00485930-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026X00485930-I1Open ↗
08/21/2026X01089579-S1Open ↗
08/21/2026X01089579-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026X01089579-I1Open ↗
08/25/2026X00485930-I1Open ↗
08/25/2026X00485930-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026X00485930-I1Open ↗
08/21/2026X01089579-I1Open ↗
08/21/2026X01089579-S1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00485930-I1Open ↗