ECB10/18/2025FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION.AS NOTED:AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURE CONSISTING OF 5 LEVELS ABOVE GROUND LEVEL & CELLAR OBSERVED SPALLED/CRACKED CONCRETE AT BE$12K due
DOB04/07/2025PARTIAL VACATE ORDER - OBSERVED ON ACTIVE PARKING STRUCTURE CONSISTING OF CELLAR, 4FL, & ROOF: DETERIORATED CONCRETE SLAB & BEAMS @ LEVELS: CELLAR,2FL THROUGH 4FL AND ROOF. THESE CONDITIONS HAVE THEREFORE MADE THESE PARKING GARAGE LEVELS UNABLE TO BE OCCUPIED. REMEDY: IMMEDIATELY VACATE PG LEVELS: CELLAR, 2FL, THROUGH 4TH FL AND ROOF
DOB04/05/2025EWO OBSERVED CRACKED/SPALLING/LOOSE CONCRETE @ CONCRETE SLAB UNDERSIDE ,CONCRETE AT BEAMS,& COLUMNS @ MULTI LOCAT AT LVL 1-5 PARKING STRUCT & EXPOSED RUSTED REINFORCEMENT@ MULTI LOCAT & MULTI LVL.REMEDY:RETAIN A NYS RDP TO DIRECT/SUPERV THE IMMEDIATELY INSTALLATION OF SAFETY MEAS @ LVL 1-5 AND PROVIDE SHORING. WORK TO BE UNDR F/T SUPERV OF NYS RDP
ECB04/05/2025FAILURE TO MAINTAIN PARKING STRUCTURE. NOTE: AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURE CONSISTING OF 6 LEVELS(5 ABOVE GL, 1 BELOW GL) I OBSERVED-CRACKED/SPALLING CONCRETE/EXPOSED/RUSTED STEEL REINF$2K due
DOB01/22/2025FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB11/21/2024FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPECTION OF A PARKING STRUCTURE(PIPS)REPORT DOCUMENTING THE CONDITIONS OF PSID#M0003$2K due
ECB10/28/2024AT TIME OF INSPECTION OF A 4 STOREYS PARKING GARAGE BUILDING I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE # 1 UPON REVIEW THE DEPARTMENT RECORDS IT SHOWS THAT THE SIDEWALK SHED PERMIT HAD EXPIRED SINCE 07-07-2$1K due
ECB12/28/2023FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-01265, DATED 5/1/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 10/11/202$12K due
DOB05/01/2023THE OCCUPIED PARKING STRUCTURE WITH CONCRETE FRAMING IS IN A STATE OF DISREPAIR, WITH CRACKS AND CONCRETE SPALLING, EXPOSING THE REBARS,
ECB05/10/2023FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED : OBSERVED ON ALL FLOORS THE ARE MULTIPLE CRACKS AT VARIOUS LOCATIONS,SOME OF THE CRACKS ARE EXPOSING THE REBARS., REPAIR AND/REPLACENothing owed — awaiting certificate of correction
ECB12/29/2013FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. FROM CELLAR TO 4TH FLR: CONCRETE CEILING AND WALLS SPALLING AND STEP CRACKS. 2ND FLR HAS CONCRETE FLR SPALLING & CRACKED CREATING A TRIP HAZARD. REMEDY: REPAIRNothing owed — awaiting certificate of correction
ECB08/07/2012ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C/O AS PER 28-118.3.1 - 28-118.3.2. 1ST STY USE CHANGED TO INCLUDE EATING AND DRINKING EST. (U.G. 6) UNDER JOB #103630894. NO SIGN OFF OR C/O ISSUED. 1ST STY OCCUPIEDNothing owed — awaiting certificate of correction
ECB06/05/2012ALTERED/CHANGED BLDG OCCUPIED W/O A VALID C/O AS PER 28-118.3.1-28.118.3.2. NOTED: GARAGE WAS DONE UNDER ALT I JOB #103630894, BUT WAS NEVERSIGNED OFF. THE APPLICATION WAS APPROVED ON 12.4.03 & PERMIT ISSUED.Nothing owed — awaiting certificate of correction
ECB06/05/2012FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER. NOTED: 1) SPALLING CEILINGS THROUGHOUT FACILITY. 2) SPALLING WALLS AT SOUTH STAIRWELL. 3)1ST TO 5TH FLRS - FLRS CRACKED & UNEVEN. 4) CELLAR FLR AREA APPROXNothing owed — awaiting certificate of correction