← Back
BuildNYC
Elevator apt, fireproof without stores
Cooper Park (NYCHA)
417 MORGAN AVENUE · BIN 3327833
💬 Discuss this project
1950Year Built
8Stories
D3Building Class
R6Zoning
611,340 sfGross Floor Area
700Units
LL97 Covered11 Active Violations 7 unresolved · 4 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 510,960 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFISP Inspection using Industrial Rope Access1p · 1 filing · 3 docs
CellarState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction85p · 2 filings · 20 docs
Site & exteriorState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4907/08/2026
City of NY Cooper Park103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering1604/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates1003/21/2026
Tarek M. Zeid, P.E503/21/2026
Smep Design & Consultation203/21/2026
Tarek M Zeid P E503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic USGeneral Contractor1307/08/2026
Dynamic ContractingPlumbing907/08/2026
Dynamic ContractingGeneral Contractor303/22/2026
M & M Elect'l ContractingElectrical203/21/2026
HY-Lee Electric CoElectrical103/21/2026
Alliance Elevator CompanyElectrical103/21/2026
Duo Plumbing & HeatingPlumbing107/08/2026
Skyline P & HPlumbing103/22/2026
Stasi/Dallas Electrical ContElectrical103/21/2026
Polaris Electrical ConstructionElectrical103/22/2026
Waschitz NElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Distinct Engineering Solu26411304/04/2025
Building Lifecycle
All (113)Filed (17)Permit Issued (19)Signed Off (1)Facade (FISP) (10)Violation (10)Inspection (4)Objection (22)Special Inspection (30)
06/16/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01129637-I1
06/09/2026
Permit issued — Suspended Scaffold
B01129637-I1-SC
02/10/2026
Permit issued — Mechanical Systems
B00447714-I1-MS
02/10/2026
Permit issued — General Construction
B00447714-S4-GC
12/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
07/25/2025
Permit issued — Plumbing
B00447707-I1-PL
06/02/2025
Permit issued — Structural
B00447714-S1-ST
04/22/2025
Permit issued — Plumbing
B00447714-S2-PL
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
04/09/2025
Special inspection requirement — Post-installed Anchors
YAZAN YANES
04/04/2025
Filed — Alteration
Building -7- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans
B00447707-P4
03/12/2025
Permit issued — General Construction
B00447714-S4-GC
03/12/2025
Permit issued — Mechanical Systems
B00447714-I1-MS
02/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2024
Permit issued — Suspended Scaffold
B01129637-I1-SC
12/04/2024
Objection resolved — Addressed
11/29/2024
Objection raised — Other
11/18/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01129637-I1
08/15/2024
Special inspection requirement — Masonry
YAZAN YANES
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
08/15/2024
Special inspection requirement — Concrete - Cast-In-Place
YAZAN YANES
08/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
YAZAN YANES
07/25/2024
Permit issued — Plumbing
B00447707-I1-PL
06/26/2024
Permit issued — Structural
B00447714-S1-ST
06/24/2024
Objection raised — Scope
06/24/2024
Objection resolved — Addressed
06/20/2024
Objection resolved — Addressed
06/20/2024
Objection resolved — Addressed
06/07/2024
Objection raised — Admin
06/07/2024
Objection raised — Mechanical
06/03/2024
Objection raised — Scope
06/03/2024
Objection resolved — Addressed
05/31/2024
Filed — Alteration
Building -7- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans
B00447707-P3
05/28/2024
Filed — Alteration
NYCHA BOILER- Building 7 - Civil General Construction work will include trenching excavation, backfill, repair of concrete
B00447714-P7
05/22/2024
Special inspection requirement — Post-installed Anchors
Ramnarayan Tirumala
05/17/2024
Permit issued — Plumbing
B00447714-S2-PL
04/11/2024
Permit issued — Mechanical Systems
B00447714-I1-MS
04/11/2024
Permit issued — General Construction
B00447714-S4-GC
04/11/2024
Violation issued (ECB, open)
Local Law
04/05/2024
Special inspection requirement — Masonry
Ramnarayan Tirumala
04/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ramnarayan Tirumala
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
04/05/2024
Special inspection requirement — Concrete - Cast-In-Place
Ramnarayan Tirumala
03/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
01/10/2024
Permit issued — Plumbing
B00447707-I1-PL
06/15/2023
Permit issued — Plumbing
B00447714-S2-PL
05/11/2023
Permit issued — General Construction
B00447714-S4-GC
05/11/2023
Permit issued — Mechanical Systems
B00447714-I1-MS
05/01/2023
Permit issued — Structural
B00447714-S1-ST
04/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ramnarayan Tirumala
04/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ramnarayan Tirumala
04/21/2023
Special inspection requirement — Chimneys and vents
YAZAN YANES
04/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
04/21/2023
Special inspection requirement — Heating Systems
YAZAN YANES
04/21/2023
Special inspection requirement — Mechanical Systems
YAZAN YANES
04/21/2023
Special inspection requirement — Energy Code Compliance Inspections
YAZAN YANES
04/21/2023
Special inspection requirement — Final
YAZAN YANES
04/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ramnarayan Tirumala
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/09/2026
DOB NOWMechanical SystemsPermit IssuedDynamic US02/10/2026
DOB NOWGeneral ConstructionPermit IssuedDynamic US02/10/2026
DOB NOWPlumbingSigned-offDynamic Contracting07/25/2025
DOB NOWStructuralPermit IssuedDynamic US06/02/2025
DOB NOWPlumbingPermit IssuedDynamic Contracting04/22/2025
DOB NOWGeneral ConstructionPermit IssuedDynamic US03/12/2025
DOB NOWMechanical SystemsPermit IssuedDynamic US03/12/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/12/2024
DOB NOWPlumbingSigned-offDynamic Contracting07/25/2024
DOB NOWStructuralPermit IssuedDynamic US06/26/2024
DOB NOWPlumbingPermit IssuedDynamic Contracting05/17/2024
DOB NOWMechanical SystemsPermit IssuedDynamic US04/11/2024
DOB NOWGeneral ConstructionPermit IssuedDynamic US04/11/2024
DOB NOWPlumbingSigned-offDuo Plumbing & Heating01/10/2024
DOB NOWPlumbingPermit IssuedDynamic Contracting06/15/2023
DOB NOWGeneral ConstructionPermit IssuedDynamic US05/11/2023
DOB NOWMechanical SystemsPermit IssuedDynamic US05/11/2023
DOB NOWStructuralPermit IssuedDynamic US05/01/2023
BISOTISSUEDM.S.T. General Contracting03/05/2015
BISOTISSUEDM.S.T. General Contracting03/05/2015
BISOTISSUEDM.S.T. General Contracting10/20/2014
BISOTISSUEDM.S.T. General Contracting09/30/2014
BISEQISSUEDM.S.T. General Contracting08/11/2014
BISEQISSUEDM.S.T. General Contracting08/04/2014
BISEQISSUEDM.S.T. General Contracting08/04/2014
BISOTISSUEDAha General Construction03/07/1995
BISPLISSUEDDelphi Plumbing & Heating10/27/1994
1 project · most recent 05/28/2024
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2024Permit IssuedDynamic USHeating Systems
Heating
Us Draft TRV-8 205 CFM ×1
2 projects · most recent 04/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2025Signed-offDynamic ContractingGas, Water/Sanitary
05/28/2024Permit IssuedDynamic ContractingGas
6 projects · most recent 04/09/2025
General Wiring
FiledStatusContractorScope
04/09/2025CompletePolaris Electrical Construction—
02/11/2025CompletePolaris Electrical ConstructionGeneral Wiring
12/31/2024CancelledDynamic Electric SystemGeneral Wiring
02/22/2023CompleteTru-Val ElectricGeneral Wiring
10/08/2020CompleteJemco Electric Contractors—
09/12/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
1 project · most recent 05/28/2024
Steel Concrete Masonry
FiledStatusContractorScope
05/28/2024Permit IssuedDynamic USSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
02/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
04/09/2025Fire-Resistant Penetrations and JointsYAZAN YANESspecial
04/09/2025Post-installed AnchorsYAZAN YANESspecial
08/15/2024MasonryYAZAN YANESspecial
08/15/2024Fire-Resistant Penetrations and JointsYAZAN YANESspecial
08/15/2024Concrete - Cast-In-PlaceYAZAN YANESspecial
08/15/2024Fire-Resistance Rated ConstructionYAZAN YANESprogress
05/22/2024Post-installed AnchorsRamnarayan Tirumalaspecial
04/05/2024MasonryRamnarayan Tirumalaspecial
04/05/2024Fire-Resistance Rated ConstructionRamnarayan Tirumalaprogress
04/05/2024Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
04/05/2024Concrete - Cast-In-PlaceRamnarayan Tirumalaspecial
03/27/2024Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
04/21/2023HVAC-R and service water heating system controlsRamnarayan Tirumalaenergy_progress
04/21/2023HVAC-R and service water piping design and insulationRamnarayan Tirumalaenergy_progress
04/21/2023Chimneys and ventsYAZAN YANESspecial
04/21/2023Fire-Resistant Penetrations and JointsYAZAN YANESspecial
04/21/2023Heating SystemsYAZAN YANESspecial
04/21/2023Mechanical SystemsYAZAN YANESspecial
04/21/2023Energy Code Compliance InspectionsYAZAN YANESprogress
04/21/2023FinalYAZAN YANESprogress
04/21/2023HVAC-R and service water heating equipmentRamnarayan Tirumalaenergy_progress
04/13/2023Excavations - Sheeting, Shoring, and BracingRamnarayan Tirumalaspecial
03/21/2023Energy Code Compliance InspectionsRamnarayan Tirumalaprogress
03/21/2023Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
03/21/2023MasonryRamnarayan Tirumalaspecial
Latest 25 of 45.
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch10
09/01/2026B00447714-S4Request digital key ↗
09/01/2026B00447714-S3Request digital key ↗
09/01/2026B00447714-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/01/2026B00447707-P1Request digital key ↗
09/01/2026B00447707-P4Request digital key ↗
09/01/2026B00447707-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00447714-I1Request digital key ↗
08/15/2026B00447714-P5Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
09/18/2014320831267Open ↗
08/09/2014340162433Open ↗
08/03/2014340162460Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
08/09/2014340162433Open ↗
08/03/2014340162460Open ↗
08/03/2014340162442Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026B00447707-P4Open ↗
09/01/2026B00447707-P3Open ↗
09/01/2026B00447707-P2Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
08/04/2015320831267Open ↗
08/04/2015320831267Open ↗
08/04/2015320831267Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/18/2026B00447707-P3Open ↗
10/18/2026B00447707-P3Open ↗
08/29/2026B00447714-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B00447714-I1Open ↗
08/29/2026B00447714-I1Open ↗
08/26/2026B00447714-S4Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/09/2014340162433Open ↗
08/03/2014340162460Open ↗
08/03/2014340162442Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/09/2014340162433Open ↗
08/03/2014340162460Open ↗
08/03/2014340162442Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/09/2014340162433Open ↗
08/03/2014340162460Open ↗
08/03/2014340162442Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/01/2026B00447707-I1Open ↗
09/01/2026B00447707-P4Open ↗
09/01/2026B00447707-P2Open ↗
Showing 3 of 15 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/04/2015320831267Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/04/2015320831267Open ↗
08/04/2015320831267Open ↗
▸BISTR8: Energy Code Progress Inspections2
09/25/2014320831267Open ↗
12/12/2013320831267Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/09/2014340162433Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/04/2015320831267Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/09/2014340162433Open ↗
08/03/2014340162460Open ↗
08/03/2014340162442Open ↗
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
09/01/2026B00447707-P4Open ↗
09/01/2026B00447707-P2Open ↗
09/01/2026B00447707-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/13/2026B00447707-P1Open ↗
08/13/2026B00447707-P3Open ↗
08/13/2026B00447714-I1Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/04/2015320831267Open ↗
06/29/2015340162433Open ↗
05/22/2015340162460Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B00447714-S1Open ↗
08/13/2026B00447714-S4Open ↗
08/13/2026B00447714-S3Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
08/21/2013320831267Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00447714-S2Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/04/2015320831267Open ↗
08/21/2013320831267Open ↗
08/21/2013320831267Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET3
08/09/2014340162433Open ↗
08/03/2014340162460Open ↗
08/03/2014340162442Open ↗
▸BISADDITIONAL INFORMATION2
10/24/2014320831267Open ↗
09/18/2014320831267Open ↗
▸BISEFILING COVER SHEET1
08/24/2013320831267Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01129637-I1Open ↗