Primarily 2 family with 1 store or office
417 TOMPKINS AVENUE
BROOKLYN · BIN 3322570
💬 Discuss this project
1899Year Built
3Stories
S2Building Class
R6AZoning
3,800 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 417 TOMPKINS UNITS LLC · 2,400 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Floor 112p · 2 filings · 20 docs
Cellar10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAJ NY CONSTRUCTION INC503/22/2026
417 TOMPKINS UNITS603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/03/2019$500K—Private party → 417 TOMPKINS UNITS LLC$132/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&T CORP112/23/2025
TWIG CONSULTING ENGINEERS PC906/10/2025
L & C ASSOCIATES210/20/2021
SYED ENGINEERING, P.C.109/01/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.903/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
FIVE BORO CONSULTING EXPEDITING403/21/2026
AJ EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H & K RENOVATION INCGeneral Contractor1207/08/2026
NEW YORK STANDARD MECH CORPPlumbing407/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor303/21/2026
KJK ELECTRIC INC 003451General Contractor303/22/2026
PLBG P & H INCPlumbing207/08/2026
DECOSTA CONSTRUCTION INCGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T DESIGN GROUP LLC1088112/23/2025
ARC CONSULTING ENGINEERS,4083106/10/2025
JUST CONSULTING ENGINEERI5865311/08/2023
DY SPECIAL INSPECTION LLC7210111/14/2022
Building Lifecycle
All (70)Filed (13)Permit Issued (12)Signed Off (4)Violation (3)Inspection (3)Objection (5)Special Inspection (30)
01/08/2026
Signed off — Alteration
INSTALL A CONVENIENT DOORWAY BETWEEN THE FRONT PORTION AND THE BACK PORTION OF THE BUILDING. (NO ZONING USE, FLOOR AREA, OCCUPANCY, AND EGRESS CHANGES)
B01338804-I1
01/02/2026
Permit issued — General Construction
B01338804-I1-GC
12/23/2025
Filed — Alteration
INSTALL A CONVENIENT DOORWAY BETWEEN THE FRONT PORTION AND THE BACK PORTION OF THE BUILDING. (NO ZONING USE, FLOOR AREA, OCCUPANCY, AND EGRESS CHANGES)
B01338804-I1
06/11/2025
Special inspection requirement — Maintenance information
THOMAS TUNG
06/11/2025
Special inspection requirement — Duct leakage testing, insulation and design
THOMAS TUNG
06/11/2025
Special inspection requirement — Mechanical Systems
Withdrawn
06/11/2025
Special inspection requirement — Ventilation and air distribution system
THOMAS TUNG
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
06/11/2025
Special inspection requirement — Final
CALVIN TRAN
06/10/2025
Filed — Alteration
Interior renovation at cellar and 1st floor as per plan. Replacing existing store front and install new windows as per plan. No change in use, means of egress and occupancy. PL/MS and Fire Suppression will be filed separated.
B00573840-P4
06/10/2025
Special inspection requirement — Final
CALVIN TRAN
06/10/2025
Special inspection requirement — Ventilation and air distribution system
THOMAS TUNG
06/10/2025
Special inspection requirement — Mechanical Systems
JAN PEREZ
06/10/2025
Special inspection requirement — Maintenance information
THOMAS TUNG
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
06/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
THOMAS TUNG
05/21/2025
Objection resolved — Addressed
04/18/2025
Objection raised — Cost
03/26/2025
Signed off — Alteration
Interior renovation at cellar and 1st floor as per plan. Replacing existing store front and install new windows as per plan. No change in use, means of egress and occupancy. PL/MS and Fire Suppression will be filed separated.
B00573840-S1
03/26/2025
Objection resolved — Addressed
02/18/2025
Permit issued — General Construction
B00573840-I1-GC
11/15/2023
Objection raised — Scope
11/10/2023
Filed — Alteration
Interior renovation at cellar and 1st floor as per plan. Replacing existing store front and install new windows as per plan. No change in use, means of egress and occupancy. PL/MS and Fire Suppression will be filed separated.
B00573840-S3
11/09/2023
Objection raised — Scope
11/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/08/2023
Filed — Alteration
Interior renovation at cellar and 1st floor as per plan. Replacing existing store front and install new windows as per plan. No change in use, means of egress and occupancy. PL/MS and Fire Suppression will be filed separated.
B00573840-P2
11/14/2022
Filed — Alteration
Interior renovation at cellar and 1st floor as per plan. Replacing existing store front and install new windows as per plan. No change in use, means of egress and occupancy. PL/MS and Fire Suppression will be filed separated.
B00573840-P1
11/14/2022
Signed off — Alteration
PLUMBING WORK AS PER PLAN. THE PLUMBING WORKS IS FOR COMMERCIAL KITCHEN OF EATING AND DRINKING ESTABLISHMENT. NO CHANGE IN USE, MEANS OF EGRESS AND OCCUPANCY. OT/MS AND FIRE SUPPRESSION WILL BE FILED SEPARATED.
B00564001-I1
10/24/2022
Special inspection requirement — Fenestration air leakage
THOMAS TUNG
10/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS TUNG
10/24/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
THOMAS TUNG
10/24/2022
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
10/24/2022
Special inspection requirement — Final
CALVIN TRAN
10/24/2022
Special inspection requirement — Interior lighting power
THOMAS TUNG
10/24/2022
Special inspection requirement — Air barrier - visual inspection
THOMAS TUNG
10/24/2022
Special inspection requirement — Exterior lighting power
THOMAS TUNG
10/24/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS TUNG
08/29/2022
Permit issued — Construction Fence
B00573840-S1-FN
08/29/2022
Permit issued — General Construction
B00573840-I1-GC
08/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/15/2022
Permit issued — Construction Fence
B00573840-S1-FN
06/15/2022
Permit issued — General Construction
B00573840-I1-GC
05/03/2022
Permit issued — Plumbing
B00564001-I1-PL
04/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
THOMAS TUNG
04/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
THOMAS TUNG
04/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
THOMAS TUNG
04/15/2022
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
04/14/2022
Filed — Alteration
PLUMBING WORK AS PER PLAN. THE PLUMBING WORKS IS FOR COMMERCIAL KITCHEN OF EATING AND DRINKING ESTABLISHMENT. NO CHANGE IN USE, MEANS OF EGRESS AND OCCUPANCY. OT/MS AND FIRE SUPPRESSION WILL BE FILED SEPARATED.
B00564001-P1
04/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
THOMAS TUNG
04/12/2022
Special inspection requirement — Energy Code Compliance Inspections
THOMAS TUNG
04/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
THOMAS TUNG
04/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
THOMAS TUNG
03/08/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/23/2022
Filed — Alteration
Interior renovation at cellar and 1st floor as per plan. Replacing existing store front and install new windows as per plan. No change in use, means of egress and occupancy. PL/MS and Fire Suppression will be filed separated.
B00573840-S2
12/29/2021
Signed off — Alteration
B00262986-I1
11/23/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2021
Permit issued — Construction Fence
B00573840-S1-FN
11/14/2021
Filed — Alteration
Interior renovation at cellar and 1st floor as per plan. Replacing existing store front and install new windows as per plan. No change in use, means of egress and occupancy. PL/MS and Fire Suppression will be filed separated.
B00573840-S1
10/20/2021
Filed — Alteration
B00262986-P1
10/20/2021
Permit issued — Plumbing
B00564001-I1-PL
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offH & K RENOVATION INC01/02/2026
DOB NOWGeneral ConstructionPermit IssuedH & K RENOVATION INC02/18/2025
DOB NOWConstruction FenceSigned-offH & K RENOVATION INC08/29/2022
DOB NOWGeneral ConstructionPermit IssuedH & K RENOVATION INC08/29/2022
DOB NOWConstruction FenceSigned-offH & K RENOVATION INC06/15/2022
DOB NOWGeneral ConstructionPermit IssuedH & K RENOVATION INC06/15/2022
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP05/03/2022
DOB NOWConstruction FenceSigned-offH & K RENOVATION INC11/18/2021
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP10/20/2021
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC09/02/2021
DOB NOWGeneral ConstructionPermit IssuedH & K RENOVATION INC08/22/2021
DOB NOWPlumbingSigned-offPLBG P & H INC03/05/2021
BISOTISSUEDDECOSTA CONSTRUCTION INC07/21/2021
BISOTISSUEDDECOSTA CONSTRUCTION INC03/12/2021
BISOTISSUEDDECOSTA CONSTRUCTION INC01/27/2021
BISOTISSUEDEASTERN BH MECHANICAL INC12/18/2019
1 project · most recent 06/10/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/10/2025Permit IssuedH & K RENOVATION INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUZ-D36NA 33,000 BTU · Heat Pump Outdoor ×2
Ventilation
Canarm 210 1,900 CFM · Kitchen Exhaust ×2
1 project · most recent 06/10/2025
Water/Sanitary
FiledStatusContractorScope
06/10/2025——Water/Sanitary
4 projects · most recent 07/16/2026
General Wiring
FiledStatusContractorScope
07/16/2026Permit IssuedKJK ELECTRIC INC4 meters, 1 new_meters
03/16/2023CompleteKJK ELECTRIC INCGeneral Wiring
12/20/2021CompleteWEBSTAR ELECL CONTRS INCGeneral Wiring
09/02/2021Permit IssuedRICHARD NEU—
1 project · most recent 06/10/2025
Fence
FiledStatusContractorScope
06/10/2025Permit IssuedH & K RENOVATION INCFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/11/2025Maintenance informationTHOMAS TUNGenergy_progress
06/11/2025Duct leakage testing, insulation and designTHOMAS TUNGenergy_progress
06/11/2025Mechanical SystemsWithdrawnspecial
06/11/2025Ventilation and air distribution systemTHOMAS TUNGenergy_progress
06/11/2025Energy Code Compliance InspectionsTHOMAS TUNGprogress
06/11/2025FinalCALVIN TRANprogress
06/10/2025FinalCALVIN TRANprogress
06/10/2025Ventilation and air distribution systemTHOMAS TUNGenergy_progress
06/10/2025Mechanical SystemsJAN PEREZspecial
06/10/2025Maintenance informationTHOMAS TUNGenergy_progress
06/10/2025Energy Code Compliance InspectionsTHOMAS TUNGprogress
06/10/2025Duct leakage testing, insulation and designTHOMAS TUNGenergy_progress
11/09/2023Tenant Protection Plan Compliance—special
10/24/2022Fenestration air leakageTHOMAS TUNGenergy_progress
10/24/2022Fire-Resistant Penetrations and JointsTHOMAS TUNGspecial
10/24/2022Structural Stability – Alterations of existing buildingsTHOMAS TUNGspecial
10/24/2022Energy Code Compliance InspectionsTHOMAS TUNGprogress
10/24/2022FinalCALVIN TRANprogress
10/24/2022Interior lighting powerTHOMAS TUNGenergy_progress
10/24/2022Air barrier - visual inspectionTHOMAS TUNGenergy_progress
10/24/2022Exterior lighting powerTHOMAS TUNGenergy_progress
10/24/2022Fenestration and door U-factor and product ratingsTHOMAS TUNGenergy_progress
04/15/2022HVAC-R and service water heating system controlsTHOMAS TUNGenergy_progress
04/15/2022HVAC-R and service water piping design and insulationTHOMAS TUNGenergy_progress
04/15/2022HVAC-R and service water heating equipmentTHOMAS TUNGenergy_progress
Latest 25 of 31.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch11
09/01/2026B00564001-I1Request digital key ↗
09/01/2026B00564001-P1Request digital key ↗
09/01/2026B00586824-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00262986-I1Request digital key ↗
08/15/2026B00262986-P1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
03/08/2022340706864Open ↗
03/07/2022340706864Open ↗
12/18/2021340706864Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION2
02/05/2021340706864Open ↗
12/18/2019340706864Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/05/2019340706864Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature26
09/30/2026B00262986-P1Open ↗
08/29/2026B00564001-P1Open ↗
08/29/2026B00564001-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00564001-I1Open ↗
09/01/2026B00564001-P1Open ↗
09/01/2026B00586824-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B00573840-S2Open ↗
08/25/2026B00573840-P1Open ↗
08/25/2026B00573840-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/19/2019340706864Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/19/2019340706864Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/09/2019340706864Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/19/2019340706864Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
08/13/2026B00262986-P1Open ↗
08/13/2026B00262986-I1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
11/19/2019340706864Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/01/2026B00564001-I1Open ↗
09/01/2026B00564001-P1Open ↗
08/31/2026B00573840-P4Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/19/2019340706864Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/24/2022340706864Open ↗
12/18/2019340706864Open ↗
12/05/2019340706864Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/09/2019340706864Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/19/2019340706864Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/24/2022340706864Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00564001-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
03/24/2022340706864Open ↗
03/24/2022340706864Open ↗
12/18/2019340706864Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/25/2022340706864Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/24/2022340706864Open ↗
11/19/2019340706864Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
03/08/2022340706864Open ↗
12/18/2021340706864Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/19/2019340706864Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
03/25/2022340706864Open ↗
03/25/2022340706864Open ↗