← Back
Public elementary, junior or senior high
East Side Community School
418 EAST 12 STREET · East Village · BIN 1005974
💬 Discuss this project
1923Year Built
5Stories
W1Building Class
R8BZoning
180,688 sfGross Floor Area
3Units
LL97 Covered20 Open Violations 2 unresolved · 18 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 36,137 sf lot · 5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof11p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 3
Floor 21p · 1 filing · 20 docs
Floor 158p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCSCA5907/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION1503/22/2026
DEPT OF EDUCATION 040103/22/2026
DOE J.H.S. 601203/22/2026
DOE 040903/22/2026
DEPARTMENT OF EDUCATION 0503/22/2026
BILTMORE GON CONTRACT103/22/2026
NYC DEPT OF EDUCATION 0103/22/2026
DEPARTMENT OF EDUCATION 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LORING CONSULTING ENGINEERS1003/21/2026
SBLM903/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
NY CONTRACTING & SAFETY CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NATIONAL ENVIROMENTAL SAFETYGeneral Contractor407/08/2026
THE SCI CONSTRUCTIONGeneral Contractor404/09/2026
DIA GENERAL CONTRUCTION IGeneral Contractor407/08/2026
WDF INCGeneral Contractor203/21/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
BERNEY, RElectrical103/21/2026
MJH ENERGY CONSULTING INCPlumbing107/08/2026
INFINITY CONTRACTING SERVGeneral Contractor107/08/2026
CUIFFO, JAMESElectrical103/21/2026
HAKMANA VITHARANA, PRIYANTHAElectrical103/21/2026
KELLEHER, VINCENTElectrical103/21/2026
RAMNAUTH, RAMANANDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351906/25/2025
20/20 INSPECTIONS INC14711611/03/2022
Building Lifecycle
All (178)Filed (28)Permit Issued (12)Signed Off (4)Violation (60)Inspection (4)Objection (40)Special Inspection (30)
03/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/12/2026
Violation issued (FDNY_ORDER, closed)
01/12/2026
Violation issued (FDNY_ORDER, closed)
01/12/2026
Violation issued (FDNY_ORDER, closed)
01/12/2026
Violation issued (FDNY_ORDER, closed)
01/12/2026
Violation issued (FDNY_ORDER, closed)
01/12/2026
Violation issued (FDNY_ORDER, closed)
01/05/2026
Violation issued (FDNY_NOV, closed)
01/05/2026
Violation issued (FDNY_NOV, closed)
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
11/25/2025
Objection raised — Other
09/10/2025
Violation issued (ECB, open)
Construction
09/10/2025
Violation issued (ECB, open)
Construction
09/10/2025
Violation issued (ECB, open)
Construction
09/10/2025
Violation issued (ECB, closed)
Construction
09/10/2025
Violation issued (ECB, closed)
Construction
09/10/2025
Violation issued (ECB, closed)
Construction
09/10/2025
Violation issued (ECB, open)
Construction
08/28/2025
Permit issued — General Construction
M01016627-I1-GC-CX
08/27/2025
Objection raised — Other
08/27/2025
Objection raised — Other
08/27/2025
Objection raised — Other
08/27/2025
Objection raised — Other
08/19/2025
Filed — Alteration
JHS 60 CONCRETE SLAB AND WALL LINER CONSTRUCTION. STRUCTURAL STEEL REPAIRS.
M01261443-S1
08/19/2025
Filed — Alteration
JHS 60 CONCRETE SLAB AND WALL LINER CONSTRUCTION. STRUCTURAL STEEL REPAIRS.
M01261443-S3
08/19/2025
Filed — Alteration
JHS 60 CONCRETE SLAB AND WALL LINER CONSTRUCTION. STRUCTURAL STEEL REPAIRS.
M01261443-S2
08/18/2025
Filed — Alteration
JHS 60 CONCRETE SLAB AND WALL LINER CONSTRUCTION. STRUCTURAL STEEL REPAIRS.
M01261443-I1
08/08/2025
Special inspection requirement — Masonry
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/08/2025
Special inspection requirement — Post-installed Anchors
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
08/01/2025
Special inspection requirement — Insulation placement and R values
08/01/2025
Special inspection requirement — Fenestration areas
08/01/2025
Special inspection requirement — Fenestration air leakage
08/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/25/2025
Special inspection requirement — Structural Steel - Welding
07/25/2025
Special inspection requirement — Final
07/25/2025
Special inspection requirement — Concrete - Cast-In-Place
07/25/2025
Special inspection requirement — Structural Steel - Details
07/25/2025
Special inspection requirement — Structural Steel - High Strength Bolting
07/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/30/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
06/30/2025
Special inspection requirement — Final
Asma Hashmi
06/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Asma Hashmi
06/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
06/25/2025
Filed — Alteration
REMOVAL OF PLUMBING FIXTURES AS INDICATED IN THE AREA OF WORK. NEW PLUMBING FIXTURES & PIPING IN NEW LOCATIONS AS INDICATED ON THE DRAWINGS AND PLUMBING FIXTURE COUNT.
M01016627-A1
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
06/11/2025
Special inspection requirement — Final
Asma Hashmi
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
06/11/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
06/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Asma Hashmi
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDIA GENERAL CONTRUCTION I08/28/2025
DOB NOWMechanical SystemsPermit IssuedTHE SCI CONSTRUCTION04/25/2025
DOB NOWMechanical SystemsPermit IssuedTHE SCI CONSTRUCTION03/14/2025
DOB NOWPlumbingSigned-offMJH ENERGY CONSULTING INC03/13/2025
DOB NOWGeneral ConstructionPermit IssuedDIA GENERAL CONTRUCTION I02/24/2025
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC08/20/2021
DOB NOWConstruction FencePermit IssuedNATIONAL ENVIROMENTAL SAF09/02/2020
DOB NOWConstruction FencePermit IssuedNATIONAL ENVIROMENTAL SAF08/31/2020
DOB NOWConstruction FencePermit IssuedNATIONAL ENVIROMENTAL SAF08/26/2020
DOB NOWMechanical SystemsSigned-offWDF INC08/25/2020
DOB NOWMechanical SystemsSigned-offINFINITY CONTRACTING SERV08/19/2020
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC08/11/2020
BISOTISSUEDLITEHOUSE BUILDERS INC07/30/2024
BISOTISSUEDLITEHOUSE BUILDERS INC07/30/2024
BISOTISSUEDLITEHOUSE BUILDERS INC06/18/2024
BISOTISSUEDLITEHOUSE BUILDERS INC06/18/2024
BISOTISSUEDBILTMORE GENERAL CONTRACTORS12/17/2021
BISOTISSUEDBILTMORE GENERAL CONTRACTORS12/17/2021
BISMHISSUEDWDF INC07/20/2021
BISOTISSUEDWDF INC06/22/2021
BISOTISSUEDWDF INC06/22/2021
BISMHISSUEDWDF INC02/08/2021
BISOTISSUEDWDF INC01/15/2021
BISPLISSUEDWDF INC01/15/2021
BISOTISSUEDWDF INC01/15/2021
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/31/2020
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/31/2020
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/31/2020
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY07/28/2020
BISOTISSUEDWDF INC06/13/2019
BISPLISSUEDWDF INC06/13/2019
BISOTISSUEDWDF INC06/13/2019
BISMHISSUEDWDF INC06/12/2019
BISOTISSUEDWDF INC06/10/2019
BISOTISSUEDWDF INC06/10/2019
BISOTISSUEDBILTMORE GENERAL CONTRACTORS08/10/2018
BISOTISSUEDBILTMORE GENERAL CONTRACTORS08/10/2018
BISOTISSUEDINNOVAX-PILLAR INC06/28/2018
BISOTISSUEDINNOVAX-PILLAR INC06/28/2018
BISOTISSUEDBILTMORE GENERAL CONTRACTORS08/08/2017
+ 22 more permits on file
2 projects · most recent 06/25/2025
Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/25/2025Permit IssuedDIA GENERAL CONTRUCTION IAir Conditioning Systems, Ventilation Systems
Cooling
Fujitsu AOU60RLAVM4 5 tons · Heat Pump Outdoor ×1
Ventilation
Loren Cook 120-SQN-B 1,800 CFM · Exhaust Fan ×1
11/04/2022——Ventilation Systems—
2 projects · most recent 08/19/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/19/2025——Storm
06/25/2025Signed-offMJH ENERGY CONSULTING INCWater/Sanitary
20 projects · most recent 12/15/2025
General Wiring Lighting
FiledStatusContractorScope
12/15/2025CompleteGEMINI ELECTRIC CO., INC.—
03/13/2025Permit IssuedEVS ELECTRIC CORPGeneral Wiring
03/04/2025CompleteDNR ELECTRIC INCORPORATEGeneral Wiring
01/28/2025CompleteANCO ELECTL CONTCTNG INC—
12/10/2024CompleteANCO ELECTL CONTCTNG INC—
01/02/2024CompleteGEMINI ELECTRIC CO., INC.—
01/19/2023CompleteCHARAN ELEC'L ENTERP'S IN—
11/17/2022CompleteCHARAN ELEC'L ENTERP'S IN—
09/09/2022CompleteGEMINI ELECTRIC CO., INC.—
06/16/2021CompleteJAMCOB ELECTRIC LLCGeneral Wiring
04/27/2021CompleteCHARAN ELEC'L ENTERP'S IN—
01/21/2021Permit IssuedA.T.J. ELECTRICAL CO.INC.General Wiring
01/18/2021CompleteMAC FHIONNGHAILE & SONS—
01/13/2021CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
11/10/2020CompleteMILAD CONTRACTING CORP.General Wiring
2 projects · most recent 08/19/2025
Steel Concrete
FiledStatusContractorScope
08/19/2025——Steel, Concrete
06/25/2025Permit IssuedDIA GENERAL CONTRUCTION ISteel
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 131
DateRequirementInspectorRole
08/08/2025Energy Code Compliance Inspections—progress
08/08/2025Post-installed Anchors—special
08/08/2025Masonry—special
08/08/2025Fire-Resistant Penetrations and Joints—special
08/01/2025Fenestration air leakage—energy_progress
08/01/2025Fenestration areas—energy_progress
08/01/2025Insulation placement and R values—energy_progress
08/01/2025Fenestration and door U-factor and product ratings—energy_progress
07/29/2025Fire-Resistant Penetrations and Joints—special
07/25/2025Concrete - Cast-In-Place—special
07/25/2025Structural Steel - Welding—special
07/25/2025Structural Stability – Alterations of existing buildings—special
07/25/2025Structural Steel - Details—special
07/25/2025Final—progress
07/25/2025Structural Steel - High Strength Bolting—special
06/30/2025Post-installed AnchorsAsma Hashmispecial
06/30/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
06/30/2025FinalAsma Hashmiprogress
06/30/2025Fire-Resistance Rated ConstructionAsma Hashmiprogress
06/30/2025Energy Code Compliance InspectionsAsma Hashmiprogress
06/11/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
06/11/2025Post-installed AnchorsAsma Hashmispecial
06/11/2025Energy Code Compliance InspectionsAsma Hashmiprogress
06/11/2025FinalAsma Hashmiprogress
06/11/2025Fire-Resistance Rated ConstructionAsma Hashmiprogress
Latest 25 of 131.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Public School JHS 60 NorthEducationSub-basement, Basement, Floor 5, Roof
Project M00385655 Alteration · LOC Issued · 08/19/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 329 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch15
08/26/2026M01016627-A1Request digital key ↗
08/26/2026M01016627-P3Request digital key ↗
08/26/2026M01016627-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems9
08/15/2026M00373315-I1Request digital key ↗
08/15/2026M00385655-P1Request digital key ↗
08/15/2026M00373315-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00371548-P2Request digital key ↗
08/15/2026M00371548-P1Request digital key ↗
08/15/2026M00371548-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00378094-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION13
09/01/2021141004687Open ↗
09/08/2015122501462Open ↗
10/23/2013121816687Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION5
09/15/2015122501462Open ↗
09/26/2013140109102Open ↗
12/24/2012121418162Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
09/26/2013140109102Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
09/26/2013140109102Open ↗
▸Seals & Professional Certifications141
▸DOB NOWProgress Inspector Seal & Signature53
09/11/2026M01016627-S1Open ↗
09/11/2026M01016627-S1Open ↗
09/11/2026M01016627-S1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/25/2026M00371548-P1Open ↗
09/25/2026M00371548-P1Open ↗
09/25/2026M00371548-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/04/2026M00373315-P4Open ↗
09/04/2026M00373315-I1Open ↗
09/04/2026M00378094-I1Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
09/08/2015122501462Open ↗
08/26/2015122501462Open ↗
10/25/2013121816687Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/01/2021141004687Open ↗
08/26/2015122501462Open ↗
10/23/2013121816687Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/26/2015122501462Open ↗
10/23/2013121816687Open ↗
12/24/2012121418162Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/01/2021141004687Open ↗
09/26/2013140109102Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/01/2021141004687Open ↗
09/26/2013140109102Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/24/2012121418162Open ↗
10/25/2012120844355Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
09/28/2009120118791Open ↗
09/11/2009120118791Open ↗
09/09/2009120118791Open ↗
▸BISSCHEDULE B - PLUMBING3
08/12/2009120118791Open ↗
08/07/2009120118791Open ↗
08/04/2009120118791Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/01/2021141004687Open ↗
09/08/2015122501462Open ↗
10/23/2013121816687Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026M00371548-I1Open ↗
08/13/2026M01016627-S2Open ↗
08/13/2026M00373315-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/14/2026M00385655-I1Open ↗
08/13/2026M00385655-P2Open ↗
08/13/2026M00385655-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
08/07/2009120118791Open ↗
08/04/2009120118791Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/26/2015122501462Open ↗
04/12/2013120844355Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/25/2012120844355Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/01/2021141004687Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/26/2013140109102Open ↗
▸Approvals, Objections & Sign-offs63
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter28
09/04/2026M00373315-P4Open ↗
08/26/2026M01016627-P2Open ↗
08/26/2026M01016627-P3Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)22
08/26/2026M01016627-P3Open ↗
08/26/2026M01016627-I1Open ↗
08/26/2026M01016627-S1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026M00378094-I1Open ↗
08/13/2026M00373315-I1Open ↗
08/13/2026M01261443-I1Open ↗
Showing 3 of 8 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
09/01/2021141004687Open ↗
09/26/2013140109102Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/24/2012121418162Open ↗
07/29/2009120118791Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/14/2010120118791Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
09/01/2021141004687Open ↗
08/26/2015122501462Open ↗
10/23/2013121816687Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET8
08/26/2015122501462Open ↗
10/23/2013121816687Open ↗
10/23/2013121816687Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/01/2021141004687Open ↗
09/26/2013140109102Open ↗
▸BISADDITIONAL INFORMATION1
09/04/2013120844355Open ↗
▸Other Documents29
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal28
09/04/2026M00373315-P4Open ↗
09/04/2026M00371548-P1Open ↗
08/26/2026M01016627-S1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/13/2026M08033011-S1Open ↗