← Back
BuildNYC
Elevator apt, semi-fireproof with stores
The Orchard
42-14 ORCHARD STREET · BIN 4624448
💬 Discuss this project
2022Year Built
69Stories
D7Building Class
M1-5/R9Zoning
801,916 sfGross Floor Area
825Units
LL97 Covered1 Active Violation ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: Building Orchard · 82,400 sf lot · 9.73 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof137p · 2 filings · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 2240p · 1 filing · 20 docs
Floor 1Garage building scaffold293p · 3 filings · 20 docs
Cellar239p · 1 filing · 20 docs
Site & exteriorConstruction fence installation6p · 3 filings · 6 docs
Filed — no permit issuedErect illuminated business wall sign1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Building Orchard203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates5203/21/2026
A1 Expediting Service403/21/2026
Eurocelt Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triton Construction CoGeneral Contractor1907/08/2026
S&E Bridge & ScaffoldScaffold707/08/2026
Demar MechanicalPlumbing307/08/2026
Delco ElectricalElectrical203/22/2026
Demar PlumbingFire Protection207/08/2026
JJ MatthewsScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting1688110/15/2026
Atlas ATC Engineering80112808/06/2026
JZN Engineering363112/06/2022
Building Lifecycle
All (208)Filed (31)Permit Issued (32)Signed Off (10)Violation (9)Inspection (16)Objection (80)Special Inspection (30)
10/15/2026
Filed — Alteration
Q01471876-I1
10/05/2026
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR PARKING
Q01424711-I1
09/14/2026
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONT, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE INSTALLED ON SW/RDWY. DOT PERMITS BY OTHERS.
Q08050986-I1
08/20/2026
Objection resolved — Addressed
08/20/2026
Special inspection requirement — Insulation placement and R values
RONALD GRAPIN
08/20/2026
Special inspection requirement — Protection of exposed foundation insulation
RONALD GRAPIN
08/20/2026
Special inspection requirement — Air barrier continuity plan testing
RONALD GRAPIN
08/20/2026
Special inspection requirement — Air barrier — testing
RONALD GRAPIN
08/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Francis Arland
08/20/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
RONALD GRAPIN
08/20/2026
Special inspection requirement — Vestibules
RONALD GRAPIN
08/20/2026
Special inspection requirement — Fenestration areas
RONALD GRAPIN
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
08/20/2026
Special inspection requirement — Fenestration air leakage
RONALD GRAPIN
08/20/2026
Special inspection requirement — Air barrier - visual inspection
RONALD GRAPIN
08/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RONALD GRAPIN
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
08/20/2026
Special inspection requirement — Masonry
RONALD GRAPIN
08/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
08/14/2026
Objection raised — Other
08/06/2026
Filed — New Building
mechanical work associated with new building construction as per plans.
Q00541049-A6
08/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RONALD GRAPIN
08/03/2026
Special inspection requirement — Protection of exposed foundation insulation
RONALD GRAPIN
08/03/2026
Special inspection requirement — Air barrier continuity plan testing
RONALD GRAPIN
08/03/2026
Special inspection requirement — Air barrier - visual inspection
RONALD GRAPIN
08/03/2026
Special inspection requirement — Fenestration areas
RONALD GRAPIN
08/03/2026
Special inspection requirement — Fenestration air leakage
RONALD GRAPIN
08/03/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
RONALD GRAPIN
08/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Francis Arland
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
RONALD GRAPIN
08/03/2026
Special inspection requirement — Vestibules
RONALD GRAPIN
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
08/03/2026
Special inspection requirement — Air barrier — testing
RONALD GRAPIN
08/03/2026
Special inspection requirement — Masonry
RONALD GRAPIN
08/03/2026
Special inspection requirement — Insulation placement and R values
RONALD GRAPIN
06/29/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2026
Signed off — New Building
mechanical work associated with new building construction as per plans.
Q00541049-S6
05/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2026
Signed off — New Building
mechanical work associated with new building construction as per plans.
Q00541049-S3
04/09/2026
Signed off — New Building
mechanical work associated with new building construction as per plans.
Q00541049-S9
04/09/2026
Signed off — New Building
mechanical work associated with new building construction as per plans.
Q00541049-S8
04/09/2026
Signed off — New Building
mechanical work associated with new building construction as per plans.
Q00541049-S7
04/09/2026
Signed off — New Building
mechanical work associated with new building construction as per plans.
Q00541049-Z1
03/26/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/20/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/06/2026
Signed off — New Building
mechanical work associated with new building construction as per plans.
Q00541049-S2
02/06/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/03/2026
Permit issued — General Construction
Q00541049-I1-GC
02/02/2026
Permit issued — Mechanical Systems
Q00541049-S2-MS
01/30/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/27/2026
Objection raised — Other
01/27/2026
Objection resolved — Addressed
11/18/2025
Permit issued — Plumbing
Q00541049-S3-PL
10/31/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Other
10/15/2025
Filed — New Building
mechanical work associated with new building construction as per plans.
Q00541049-A4
10/08/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 208 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTriton Construction Co02/03/2026
DOB NOWMechanical SystemsSigned-offTriton Construction Co02/02/2026
DOB NOWPlumbingSigned-offDemar Mechanical11/18/2025
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold09/12/2025
DOB NOWMechanical SystemsSigned-offTriton Construction Co09/03/2025
DOB NOWGeneral ConstructionPermit IssuedTriton Construction Co06/26/2025
DOB NOWFoundationSigned-offTriton Construction Co06/17/2025
DOB NOWFoundationSigned-offTriton Construction Co03/26/2025
DOB NOWFoundationSigned-offTriton Construction Co02/18/2025
DOB NOWStandpipeSigned-offDemar Plumbing02/13/2025
DOB NOWSprinklersSigned-offDemar Plumbing01/10/2025
DOB NOWGeneral ConstructionPermit IssuedTriton Construction Co12/12/2024
DOB NOWPlumbingSigned-offDemar Mechanical11/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/26/2024
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold09/26/2024
DOB NOWMechanical SystemsSigned-offTriton Construction Co09/03/2024
DOB NOWSupported ScaffoldSigned-offJJ Matthews06/11/2024
DOB NOWGeneral ConstructionPermit IssuedTriton Construction Co05/06/2024
DOB NOWFoundationSigned-offTriton Construction Co02/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold12/14/2023
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold12/01/2023
DOB NOWPlumbingSigned-offDemar Mechanical11/28/2023
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold09/26/2023
DOB NOWStructuralSigned-offTriton Construction Co07/21/2023
DOB NOWMechanical SystemsSigned-offTriton Construction Co07/20/2023
DOB NOWSupport of ExcavationPermit IssuedTriton Construction Co07/19/2023
DOB NOWGeneral ConstructionPermit IssuedTriton Construction Co05/16/2023
DOB NOWCurb CutSigned-offTriton Construction Co03/08/2023
DOB NOWCurb CutSigned-offTriton Construction Co03/08/2023
DOB NOWCurb CutSigned-offTriton Construction Co03/07/2023
DOB NOWCurb CutSigned-offTriton Construction Co03/07/2023
DOB NOWConstruction FenceSigned-offS&E Bridge & Scaffold12/08/2022
1 project · most recent 08/06/2026
Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026Permit IssuedTriton Construction CoAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Lennox VPB144H4M 12 tons · Split System ×4
VPB192H4M 16 tons · Split System ×4
Ducts & Piping
N/A N/A 1 CFM · Ductwork ×4
1 project · most recent 08/06/2026
Sprinkler System
FiledStatusContractorScope
08/06/2026Signed-offDemar PlumbingSprinkler System
1 project · most recent 08/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/06/2026Signed-offDemar MechanicalGas, Storm, Water/Sanitary
6 projects · most recent 11/04/2025
General Wiring
FiledStatusContractorScope
11/04/2025CompleteDelco ElectricalGeneral Wiring
10/16/2024Pending Payment VerificationJam Electrical—
10/16/2024Pending Payment VerificationJam Electrical—
03/05/2024Permit IssuedDelco ElectricalGeneral Wiring
12/15/2023CompleteDelco Electrical—
12/13/2023CompleteDelco ElectricalGeneral Wiring
1 project · most recent 08/06/2026
Steel Concrete
FiledStatusContractorScope
08/06/2026Permit IssuedTriton Construction CoSteel, Concrete
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
06/29/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/26/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/20/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/06/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
01/30/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
10/08/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
09/03/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/12/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/07/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/07/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
05/08/2024Pass-Final PL - UndergroundPassView ↗
04/03/2024Pass-Final PL - UndergroundPassView ↗
12/01/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/20/2026MasonryRONALD GRAPINspecial
08/20/2026VestibulesRONALD GRAPINenergy_progress
08/20/2026Protection of exposed foundation insulationRONALD GRAPINenergy_progress
08/20/2026Air barrier - visual inspectionRONALD GRAPINenergy_progress
08/20/2026Air barrier continuity plan testingRONALD GRAPINenergy_progress
08/20/2026Fenestration areasRONALD GRAPINenergy_progress
08/20/2026Fenestration and door U-factor and product ratingsRONALD GRAPINenergy_progress
08/20/2026Fenestration air leakageRONALD GRAPINenergy_progress
08/20/2026Insulation placement and R valuesRONALD GRAPINenergy_progress
08/20/2026Air barrier — testing RONALD GRAPINenergy_progress
08/20/2026Fire-Resistance Rated ConstructionRONALD GRAPINprogress
08/20/2026Energy Code Compliance InspectionsRONALD GRAPINprogress
08/20/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
08/20/2026Subsurface Investigations (Borings/Test Pits)Francis Arlandspecial
08/20/2026Wall Panels, Curtain Walls, and VeneersRONALD GRAPINspecial
08/03/2026Air barrier continuity plan testingRONALD GRAPINenergy_progress
08/03/2026Insulation placement and R valuesRONALD GRAPINenergy_progress
08/03/2026Fenestration areasRONALD GRAPINenergy_progress
08/03/2026Protection of exposed foundation insulationRONALD GRAPINenergy_progress
08/03/2026Fenestration and door U-factor and product ratingsRONALD GRAPINenergy_progress
08/03/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
08/03/2026MasonryRONALD GRAPINspecial
08/03/2026Subsurface Investigations (Borings/Test Pits)Francis Arlandspecial
08/03/2026Wall Panels, Curtain Walls, and VeneersRONALD GRAPINspecial
08/03/2026Energy Code Compliance InspectionsRONALD GRAPINprogress
Latest 25 of 150.
▾Documents — 346 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch30
10/16/2026Q01471876-I1Request digital key ↗
10/06/2026Q01424711-I1Request digital key ↗
08/25/2026Q08050986-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
03/20/2024440766887Open ↗
03/18/2024440766887Open ↗
03/05/2024440766887Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/29/2023440766887Open ↗
02/11/2023440766887Open ↗
▸DOB NOWDEP Stormwater Construction Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records16
▸DOB NOWZD1: DOB Zoning Diagram7
08/25/2026Q00541049-I1Open ↗
08/25/2026Q00541049-A6Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/25/2026Q00541049-A6Open ↗
Showing 1 of 7 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/29/2023440766887Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications231
▸DOB NOWProgress Inspector Seal & Signature136
10/06/2026Q01424711-I1Open ↗
09/22/2026Q00541049-S1Open ↗
09/22/2026Q00541049-S1Open ↗
Showing 3 of 136 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature62
09/22/2026Q00541049-S1Open ↗
09/11/2026Q00541049-P5Open ↗
09/11/2026Q00541049-P5Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
10/16/2026Q01471876-I1Open ↗
10/06/2026Q01424711-I1Open ↗
08/25/2026Q08050986-I1Open ↗
Showing 3 of 31 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/11/2023440766887Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/11/2023440766887Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist8
08/25/2026Q00541049-A6Open ↗
08/25/2026Q00541049-A5Open ↗
Showing 2 of 8 on file for this type
▸BISSTREET TREE CHECKLIST2
03/29/2023440766887Open ↗
02/11/2023440766887Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN1
02/11/2023440766887Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/25/2026Q00541049-S3Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT7
08/25/2026Q00541049-A6Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
03/29/2024440766887Open ↗
03/18/2024440766887Open ↗
03/29/2023440766887Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/11/2023440766887Open ↗
▸Other Documents28
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/25/2026Q00541049-A6Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWSite Survey: Initial8
08/25/2026Q00541049-A6Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWWaiver Document7
08/25/2026Q00541049-A6Open ↗
Showing 1 of 7 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
03/29/2023440766887Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/29/2023440766887Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type