← Back
BuildNYC
Nursing home
Ozanam Hall of Queens Nursing
42-41 201ST STREET · BIN 4137890
💬 Discuss this project
1968Year Built
11Stories
I6Building Class
R6Zoning
247,884 sfGross Floor Area
1Units
LL97 Covered3 Active Violations 0 unresolved · 3 paperwork only 9 likely answered 8 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Nursing home · Owner of record: Ozanam Hall of Queens Nursing Homes · 96,000 sf lot · 2.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofOzanam Hall, Verizon3p · 2 filings · 8 docs
Floor 1Ozanam Hall1p · 3 filings · 8 docs
CellarOzanam Hall16p · 4 filings · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Scherer Design Group306/23/2023
Lilker Associates Consulting Engineering203/10/2023
NY AC103/10/2023
The Eipel Engineering Group103/09/2023
Leon Skvirsky PE205/24/2021
Dagher Engineering104/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen403/21/2026
Building Brothers403/21/2026
Construction Permit Services303/21/2026
Metropolis Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Interstate Mechanical ServicesGeneral Contractor507/08/2026
LKR Technical ServicellcGeneral Contractor407/08/2026
Nexius SolutionsGeneral Contractor303/21/2026
Signs Artistry Awning Co*specialty_contractor203/21/2026
Multi-Phase Electrical ServicesElectrical103/22/2026
Red Hook Sign and ElectricSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Scherer Design Group6303206/23/2023
Lilker Associates Consulting816403/10/2023
Howard L Zimmerman Architects1712103/09/2023
Scherer Design Group7921110/26/2020
Building Lifecycle
All (130)Filed (11)Permit Issued (10)Signed Off (8)Facade (FISP) (14)Violation (60)Inspection (1)Objection (18)Special Inspection (8)
06/29/2026
Signed off — Alteration
Hands-on inspection for FISP
Q01377813-I1
04/09/2026
Permit issued — Suspended Scaffold
Q01377813-I1-SC
03/30/2026
Filed — Alteration
Hands-on inspection for FISP
Q01377813-I1
03/10/2026
Violation issued (FDNY_ORDER, closed)
01/06/2025
Violation issued (FDNY_NOV, closed)
08/12/2024
Signed off — Alteration
Modification to Verizon site. Replace 9 antenna, 3 OVP & 9 RRH units, remove 1 antenna, and install 4 antenna, 2 OVP & 4 new RRH units on roof. Install 2 microwave dishes on bulkhead.
Q00397834-I1
08/06/2024
Violation issued (FDNY_NOV, closed)
04/08/2024
Signed off — Alteration
Q00815455-I1
04/02/2024
Cycle 9 facade report signed — SWARMP
03/28/2024
Signed off — Alteration
Modification to fuel oil storage and piping for generator replacement as per plans. No change in use, egress or occupancy.
Q00825103-I1
03/28/2024
Cycle 9 facade inspection completed
03/26/2024
Signed off — Alteration
Modification to the existing HVAC system ( intake /exhaust air louvers, dampers, and ductwork ) as per plans. No change in use, egress or occupancy.
Q00825065-I1
03/19/2024
Signed off — Alteration
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar as per plans. No change to use, egress or occupancy.
Q00815403-I1
03/11/2024
Permit issued — General Construction
Q00815403-I1-GC
03/08/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/30/2024
Permit issued — Boiler Equipment
Q00825103-I1-BE
01/16/2024
Permit issued — Structural
Q00815455-I1-ST
01/11/2024
Permit issued — Mechanical Systems
Q00825065-I1-MS
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/23/2023
Filed — Alteration
Modification to Verizon site. Replace 9 antenna, 3 OVP & 9 RRH units, remove 1 antenna, and install 4 antenna, 2 OVP & 4 new RRH units on roof. Install 2 microwave dishes on bulkhead.
Q00397834-P2
04/18/2023
Permit issued — Antenna
Q00397834-I1-AN
03/27/2023
Cycle 9 facade report submitted
03/17/2023
Objection raised — Inspections
03/17/2023
Objection resolved — Addressed
03/17/2023
Objection raised — Energy
03/17/2023
Objection resolved — Addressed
03/17/2023
Objection raised — Energy
03/17/2023
Objection resolved — Addressed
03/17/2023
Objection raised — Inspections
03/17/2023
Objection resolved — Addressed
03/17/2023
Objection raised — Scope
03/17/2023
Objection resolved — Addressed
03/10/2023
Filed — Alteration
Modification to fuel oil storage and piping for generator replacement as per plans. No change in use, egress or occupancy.
Q00825103-I1
03/10/2023
Filed — Alteration
Modification to the existing HVAC system ( intake /exhaust air louvers, dampers, and ductwork ) as per plans. No change in use, egress or occupancy.
Q00825065-I1
03/10/2023
Filed — Alteration
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar as per plans. No change to use, egress or occupancy.
Q00815403-I1
03/09/2023
Filed — Alteration
Q00815455-I1
02/07/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SERGE BUDZYN
01/19/2023
Violation issued (FDNY_ORDER, closed)
01/19/2023
Violation issued (FDNY_ORDER, closed)
01/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
01/19/2023
Special inspection requirement — Final
Howard Zimmerman
01/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERGE BUDZYN
01/19/2023
Special inspection requirement — Final
STEVEN GAMBINO
01/19/2023
Special inspection requirement — Fire-Resistance Rated Construction
SERGE BUDZYN
01/19/2023
Special inspection requirement — Concrete - Cast-In-Place
Howard Zimmerman
01/13/2023
Violation issued (ECB, open)
Local Law
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/12/2021
Signed off — Alteration
INSTALL ILLUMINATED SIGN ON GROUND STRUCTURE FILED UNDER SEPARATE APPLICATION (Ozanam Hall of Queens Nursing Home)
Q00510587-I1
10/12/2021
Signed off — Alteration
ERECT GROUND STRUCTURE FOR SIGN FILED UNDER SEPARATE APPLICATION.
Q00510909-I1
08/26/2021
Permit issued — General Construction
Q00510909-I1-GC-CX
08/24/2021
Permit issued — Sign
Q00510587-I1-SG
08/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/21/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/22/2021
Permit issued — Antenna
Q00397834-I1-AN
07/08/2021
Objection resolved — Addressed
07/07/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
07/06/2021
Filed — Alteration
Modification to Verizon site. Replace 9 antenna, 3 OVP & 9 RRH units, remove 1 antenna, and install 4 antenna, 2 OVP & 4 new RRH units on roof. Install 2 microwave dishes on bulkhead.
Q00397834-P1
07/01/2021
Objection raised — Inspections
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offVertical Access04/09/2026
DOB NOWGeneral ConstructionSigned-offInterstate Mechanical Services03/11/2024
DOB NOWBoiler EquipmentSigned-offChampion Combustion01/30/2024
DOB NOWStructuralSigned-offInterstate Mechanical Services01/16/2024
DOB NOWMechanical SystemsSigned-offInterstate Mechanical Services01/11/2024
DOB NOWAntennaSigned-offLKR Technical Servicellc04/18/2023
DOB NOWGeneral ConstructionSigned-offSigns Artistry Awning Co*08/26/2021
DOB NOWSignSigned-offRed Hook Sign and Electric08/24/2021
DOB NOWAntennaSigned-offLKR Technical Servicellc07/22/2021
DOB NOWAntennaSigned-offNexius Solutions12/07/2020
BISMHISSUEDZDG04/13/2020
BISOTISSUEDZDG04/13/2020
BISOTISSUEDZDG02/04/2020
BISMHISSUEDZDG02/04/2020
BISPLISSUEDMC Cready & Rice Plumbing06/25/2019
BISOTISSUEDCharles M Dwyer07/18/2017
BISPLISSUEDMC Cready & Rice Plumbing12/28/2016
BISOTISSUEDTelcom Engineering GP07/21/2016
BISFPISSUEDReliable Fire Protection05/03/2016
BISFPISSUEDUnited Fire Protection09/03/2015
BISFPISSUEDReliable Fire Protection07/21/2015
BISOTISSUEDTelcom Engineering GP07/08/2015
BISFPISSUEDUnited Fire Protection07/01/2015
BISFPISSUEDUnited Fire Protection07/01/2015
BISFPISSUEDUnited Fire Protection07/01/2015
BISSPISSUEDSirina Fire Protection05/14/2015
BISPLISSUEDGeoffrey A. Lagas & Associates11/07/2014
BISOTISSUEDTelcom Engineering GP07/03/2014
BISSPISSUEDSirina Fire Protection05/12/2014
BISOTISSUEDSkyline Restoration04/04/2014
BISPLISSUEDAspro Plumbing03/31/2014
BISEQISSUEDSpring Scaffolding03/31/2014
BISEQISSUEDSkyline Restoration02/28/2014
BISOTISSUEDTelcom Engineering GP01/10/2014
BISEQISSUEDSpring Scaffolding12/27/2013
BISSPISSUEDMcCready & Rice Plumbing04/08/2013
BISOTISSUEDSkyline Restoration04/05/2013
BISEQISSUEDSpring Scaffolding04/02/2013
BISSPISSUEDSirina Fire Protection01/04/2013
BISSPISSUEDMcCready & Rice Plumbing06/01/2012
+ 20 more permits on file
1 project · most recent 04/08/2021
Medical Gas
FiledStatusContractorScope
04/08/2021——Medical Gas
3 projects · most recent 03/26/2024
General Wiring
FiledStatusContractorScope
03/26/2024CompleteMulti-Phase Electrical ServicesGeneral Wiring
06/29/2021CompleteRainbow Electric Co—
11/25/2019CompleteA & M Electrical ServiceGeneral Wiring
1 project · most recent 03/30/2026
FiledStatusContractorScope
03/30/2026Signed-offVertical Access—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/08/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/07/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsSERGE BUDZYNspecial
01/19/2023Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
01/19/2023FinalHoward Zimmermanprogress
01/19/2023Fire-Resistant Penetrations and JointsSERGE BUDZYNspecial
01/19/2023FinalSTEVEN GAMBINOprogress
01/19/2023Fire-Resistance Rated ConstructionSERGE BUDZYNprogress
01/19/2023Concrete - Cast-In-PlaceHoward Zimmermanspecial
04/26/2021FinalLEON SKVIRSKYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ozanam HallMedical / HealthcareCellar, Floor 1
Project Q01377813 Alteration · LOC Issued · 03/30/2026
Project Q00815403 Alteration · LOC Issued · 03/10/2023
Project Q00825065 Alteration · LOC Issued · 03/10/2023
Project Q00825103 Alteration · LOC Issued · 03/10/2023
Project Q00815455 Alteration · LOC Issued · 03/09/2023
Project Q00510587 Alteration · LOC Issued · 05/24/2021
Project Q00510909 Alteration · LOC Issued · 05/24/2021
VerizonTelecom siteRoof
Project Q00397834 Alteration · LOC Issued · 10/26/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 363 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch7
08/27/2026Q00510587-I1Request digital key ↗
08/25/2026Q00815455-I1Request digital key ↗
08/25/2026Q00815403-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Antenna3
08/27/2026Q00397834-I1Request digital key ↗
08/27/2026Q00397834-P2Request digital key ↗
08/15/2026Q00397834-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00469159-I1Request digital key ↗
▸Applications & Permits82
▸BISPLAN / WORK APPROVAL APPLICATION40
08/19/2020421696560Open ↗
08/10/2020421696560Open ↗
03/19/2019421184836Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION31
02/13/2020421696668Open ↗
02/13/2020421696668Open ↗
10/07/2019421696668Open ↗
Showing 3 of 31 on file for this type
▸BISPLACE OF ASSEMBLY6
10/22/2017421561884Open ↗
10/19/2017421561884Open ↗
10/19/2017421561875Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
03/30/2015440135863Open ↗
Showing 1 of 4 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/05/2015420609096Open ↗
▸Seals & Professional Certifications71
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
09/13/2019421696668Open ↗
09/13/2019421696668Open ↗
09/13/2019421696560Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00510587-I1Open ↗
08/25/2026Q00825103-I1Open ↗
08/13/2026Q00469159-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/28/2018421696560Open ↗
11/27/2018421696668Open ↗
11/27/2018421696668Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
11/28/2018421696560Open ↗
11/27/2018421696668Open ↗
11/27/2018421696668Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/23/2016440373016Open ↗
Showing 1 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/23/2016440373016Open ↗
03/28/2014440135863Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q00815455-I1Open ↗
08/24/2026Q00510909-I1Open ↗
08/23/2026Q00815403-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026Q00825103-I1Open ↗
08/25/2026Q00815455-I1Open ↗
08/23/2026Q00815403-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment19
▸BISFA - FDNY APPROVAL : FD-FAA5
08/27/2020421697471Open ↗
03/31/2015420609103Open ↗
04/08/2014410135759Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
11/28/2018421696560Open ↗
11/27/2018421696668Open ↗
10/05/2015420609096Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
12/04/2015420609096Open ↗
12/01/2015420609096Open ↗
07/22/2015420609096Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
08/10/2020421696560Open ↗
12/23/2016440373016Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
07/30/2014420609096Open ↗
▸BISSPRINKLER SYSTEMS1
08/28/2020421696560Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos35
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
12/01/2018421696668Open ↗
11/28/2018421696560Open ↗
11/27/2018421696668Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q00469159-I1Open ↗
08/13/2026Q00397834-I1Open ↗
08/13/2026Q00397834-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/15/2026Q00825103-I1Open ↗
08/13/2026Q00815403-I1Open ↗
08/13/2026Q00825065-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/27/2020421697471Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
09/13/2019421696668Open ↗
11/27/2018421696668Open ↗
10/17/2017420919395Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/27/2020421696668Open ↗
10/17/2017420919395Open ↗
05/02/2017440373016Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
03/28/2014440135863Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/23/2016440373016Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/27/2020421696668Open ↗
▸Inspections & Test Reports12
▸BISHYDRAULIC FLOW CALCULATIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/28/2020421696560Open ↗
08/27/2020421696668Open ↗
08/27/2020421696668Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs52
▸BISLETTERS - SUPPORTING DOCUMENTATION19
02/13/2020421696668Open ↗
11/27/2019421696560Open ↗
11/27/2019421696560Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
09/08/2020421696560Open ↗
08/27/2020421697471Open ↗
08/27/2020421696668Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
07/16/2015421184836Open ↗
Showing 1 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/17/2026Q01377813-I1Open ↗
08/13/2026Q00825103-I1Open ↗
08/13/2026Q00510587-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER1
05/22/2015420609096Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT27
09/08/2020421696560Open ↗
08/27/2020421697471Open ↗
08/27/2020421696668Open ↗
Showing 3 of 27 on file for this type
▸Filing & Intake Forms36
▸BISEFILING COVER SHEET20
11/28/2018421696560Open ↗
11/27/2018421696668Open ↗
11/27/2018421696668Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION9
08/19/2020421696560Open ↗
10/19/2017421561884Open ↗
10/19/2017421561875Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/23/2016440373016Open ↗
Showing 1 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
11/27/2018420861534Open ↗
11/27/2018420861543Open ↗
10/17/2017420919395Open ↗
▸Other Documents4
▸BISFEE EXEMPTION DOCUMENTATION2
03/28/2014440135863Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/27/2020421697471Open ↗
▸DOB NOWIRA Certification1
08/17/2026Q01377813-I1Open ↗