← Back
BROOKLYN
42 GARFIELD PLACE
BROOKLYN · BIN 3020582
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureMechanical
Roof1 filing · 20 docs
Floor 33p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HABITAT ON GARFIELD 1203/21/2026
LET'S GROW TOGETHER INC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2022$1000K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC1108/26/2024
JIMENEZ BUILDING CONSULTING LLC204/30/2024
JIAN ENGINEERING PLLC207/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO2603/21/2026
JRL SKYLINE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor1004/09/2026
ACER CONSTRUCTION INCGeneral Contractor204/09/2026
JRL SKYLINE INCGeneral Contractor104/09/2026
WINWAY DEVELOPMENT LLCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WELLDONE INSPECTION INC.86281108/26/2024
YANG ENGINEERING LLC8376111/29/2022
Building Lifecycle
All (102)Filed (15)Permit Issued (9)Signed Off (5)Violation (13)Inspection (10)Objection (20)Special Inspection (30)
11/19/2025
Violation issued (HPD, open)
I
06/09/2025
Violation issued (HPD, open)
A
03/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/26/2024
Violation issued (HPD, open)
I
08/28/2024
Special inspection requirement — Fenestration areas
QIUFAN JIANG
08/28/2024
Special inspection requirement — Maintenance information
QIUFAN JIANG
08/28/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
QIUFAN JIANG
08/28/2024
Special inspection requirement — Insulation placement and R values
QIUFAN JIANG
08/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
08/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
08/28/2024
Special inspection requirement — Fenestration air leakage
QIUFAN JIANG
08/28/2024
Special inspection requirement — Interior lighting power
QIUFAN JIANG
08/28/2024
Special inspection requirement — Permanent certificate
QIUFAN JIANG
08/28/2024
Special inspection requirement — Air barrier - visual inspection
QIUFAN JIANG
08/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
QIUFAN JIANG
08/26/2024
Filed — Alteration CO
CONVERTED 3 DWELLING UNITS TO 2 DWELLING UNITS FOR AN EXISTING 3 STROY BUILDING WITH CELLAR. PROPOSED STAIR BULKHEAD. WORK ON CELLAR, 1ST THRU 3RD FLOOR, AND ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B08049525-P8
08/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
08/23/2024
Special inspection requirement — Fenestration areas
QIUFAN JIANG
08/23/2024
Special inspection requirement — Fenestration air leakage
QIUFAN JIANG
08/23/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
QIUFAN JIANG
08/23/2024
Special inspection requirement — Maintenance information
QIUFAN JIANG
08/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
QIUFAN JIANG
08/23/2024
Special inspection requirement — Air barrier - visual inspection
QIUFAN JIANG
08/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
08/23/2024
Special inspection requirement — Insulation placement and R values
QIUFAN JIANG
08/23/2024
Special inspection requirement — Permanent certificate
QIUFAN JIANG
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
08/23/2024
Special inspection requirement — Interior lighting power
QIUFAN JIANG
08/19/2024
Permit issued — General Construction
B08049525-I1-GC
08/07/2024
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
07/31/2024
Filed — Alteration CO
CONVERTED 3 DWELLING UNITS TO 2 DWELLING UNITS FOR AN EXISTING 3 STROY BUILDING WITH CELLAR. PROPOSED STAIR BULKHEAD. WORK ON CELLAR, 1ST THRU 3RD FLOOR, AND ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B08049525-P7
07/19/2024
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
07/01/2024
Signed off — Alteration CO
CONVERTED 3 DWELLING UNITS TO 2 DWELLING UNITS FOR AN EXISTING 3 STROY BUILDING WITH CELLAR. PROPOSED STAIR BULKHEAD. WORK ON CELLAR, 1ST THRU 3RD FLOOR, AND ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B08049525-S2
06/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/20/2024
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
05/06/2024
Permit issued — Mechanical Systems
B08049525-S2-MS
04/30/2024
Filed — Alteration CO
CONVERTED 3 DWELLING UNITS TO 2 DWELLING UNITS FOR AN EXISTING 3 STROY BUILDING WITH CELLAR. PROPOSED STAIR BULKHEAD. WORK ON CELLAR, 1ST THRU 3RD FLOOR, AND ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B08049525-S2
04/29/2024
Filed — Alteration CO
CONVERTED 3 DWELLING UNITS TO 2 DWELLING UNITS FOR AN EXISTING 3 STROY BUILDING WITH CELLAR. PROPOSED STAIR BULKHEAD. WORK ON CELLAR, 1ST THRU 3RD FLOOR, AND ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B08049525-P6
04/25/2024
Permit issued — General Construction
B08049525-I1-GC
04/17/2024
Signed off — Alteration CO
CONVERTED 3 DWELLING UNITS TO 2 DWELLING UNITS FOR AN EXISTING 3 STROY BUILDING WITH CELLAR. PROPOSED STAIR BULKHEAD. WORK ON CELLAR, 1ST THRU 3RD FLOOR, AND ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B08049525-S1
04/17/2024
Signed off — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST FLOOR THRU 3RD FLOOR, ROOF IN CONJUNCTION WITH B08049525. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00848199-I1
04/16/2024
Special inspection requirement — Air barrier - visual inspection
QIUFAN JIANG
04/16/2024
Special inspection requirement — Insulation placement and R values
QIUFAN JIANG
04/16/2024
Special inspection requirement — Interior lighting power
QIUFAN JIANG
04/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
QIUFAN JIANG
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
QIUFAN JIANG
04/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
QIUFAN JIANG
04/15/2024
Signed off — Alteration
B00845914-I1
04/10/2024
Violation issued (HPD, open)
A
03/14/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/31/2024
Filed — Alteration CO
CONVERTED 3 DWELLING UNITS TO 2 DWELLING UNITS FOR AN EXISTING 3 STROY BUILDING WITH CELLAR. PROPOSED STAIR BULKHEAD. WORK ON CELLAR, 1ST THRU 3RD FLOOR, AND ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B08049525-P5
11/20/2023
Violation issued (HPD, open)
I
07/31/2023
Permit issued — Structural
B08049525-S1-ST
07/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/24/2023
Filed — Alteration CO
CONVERTED 3 DWELLING UNITS TO 2 DWELLING UNITS FOR AN EXISTING 3 STROY BUILDING WITH CELLAR. PROPOSED STAIR BULKHEAD. WORK ON CELLAR, 1ST THRU 3RD FLOOR, AND ROOF. AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B08049525-P4
07/21/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST FLOOR THRU 3RD FLOOR, ROOF IN CONJUNCTION WITH B08049525. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00848199-P1
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC08/19/2024
DOB NOWMechanical SystemsSigned-offACER CONSTRUCTION INC05/06/2024
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC04/25/2024
DOB NOWStructuralSigned-offLXC CONSTRUCTION INC07/31/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.06/26/2023
DOB NOWSidewalk ShedSigned-offWINWAY DEVELOPMENT LLC04/03/2023
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC03/20/2023
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC03/03/2023
DOB NOWGeneral ConstructionPermit IssuedJRL SKYLINE12/02/2022
1 project · most recent 08/26/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2024Permit IssuedLXC CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ-U1 48,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 03/14/2023
General Wiring
FiledStatusContractorScope
03/14/2023CompleteERIC & NG ELEC'L, INC.General Wiring
1 project · most recent 08/26/2024
Steel Concrete Masonry
FiledStatusContractorScope
08/26/2024Permit IssuedLXC CONSTRUCTION INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/07/2024Pass-Final Construction Permit WithdrawalPassView ↗
07/19/2024Fail-Final Construction Permit WithdrawalFailView ↗
06/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2024Fail-Final Construction Permit WithdrawalFailView ↗
03/14/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
08/28/2024Construction Operations Influencing Adjacent StructuresQIUFAN JIANGspecial
08/28/2024Permanent certificateQIUFAN JIANGenergy_progress
08/28/2024Interior lighting powerQIUFAN JIANGenergy_progress
08/28/2024Insulation placement and R valuesQIUFAN JIANGenergy_progress
08/28/2024Maintenance informationQIUFAN JIANGenergy_progress
08/28/2024Fenestration air leakageQIUFAN JIANGenergy_progress
08/28/2024Fenestration areasQIUFAN JIANGenergy_progress
08/28/2024Fenestration and door U-factor and product ratingsQIUFAN JIANGenergy_progress
08/28/2024Air barrier - visual inspectionQIUFAN JIANGenergy_progress
08/28/2024Energy Code Compliance InspectionsQIUFAN JIANGprogress
08/28/2024Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
08/28/2024Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
08/23/2024Fenestration areasQIUFAN JIANGenergy_progress
08/23/2024Construction Operations Influencing Adjacent StructuresQIUFAN JIANGspecial
08/23/2024Structural Stability – Alterations of existing buildingsQIUFAN JIANGspecial
08/23/2024Energy Code Compliance InspectionsQIUFAN JIANGprogress
08/23/2024Fire-Resistance Rated ConstructionQIUFAN JIANGprogress
08/23/2024Maintenance informationQIUFAN JIANGenergy_progress
08/23/2024Insulation placement and R valuesQIUFAN JIANGenergy_progress
08/23/2024Permanent certificateQIUFAN JIANGenergy_progress
08/23/2024Fenestration and door U-factor and product ratingsQIUFAN JIANGenergy_progress
08/23/2024Air barrier - visual inspectionQIUFAN JIANGenergy_progress
08/23/2024Interior lighting powerQIUFAN JIANGenergy_progress
08/23/2024Fenestration air leakageQIUFAN JIANGenergy_progress
04/16/2024Fenestration areasQIUFAN JIANGenergy_progress
Latest 25 of 68.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/28/2026B08046262-P1Request digital key ↗
08/28/2026B08046262-I1Request digital key ↗
08/27/2026B00845914-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits3
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/10/2024322117115Open ↗
05/10/2024322117115Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/24/2024322117115Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWRestrictive Declaration/Easement 13
08/26/2026B08049525-P7Open ↗
08/26/2026B08049525-P8Open ↗
08/14/2026B08049525-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 23
08/26/2026B08049525-P8Open ↗
08/26/2026B08049525-P7Open ↗
08/14/2026B08049525-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/26/2026B08049525-P8Open ↗
08/26/2026B08049525-P7Open ↗
08/14/2026B08049525-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/10/2024322117115Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/10/2024322117115Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/10/2024322117115Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B08049525-I1Open ↗
▸Seals & Professional Certifications88
▸DOB NOWProgress Inspector Seal & Signature55
09/29/2026B08049525-P2Open ↗
09/29/2026B08049525-P2Open ↗
09/29/2026B08049525-P2Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/29/2026B08049525-P2Open ↗
09/29/2026B08049525-P2Open ↗
09/27/2026B08049525-P8Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/28/2026B08046262-I1Open ↗
08/27/2026B00848199-I1Open ↗
08/27/2026B00848199-P1Open ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist6
08/26/2026B08049525-P6Open ↗
08/26/2026B08049525-P8Open ↗
08/26/2026B08049525-P7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026B08049525-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/28/2026B08046262-I1Open ↗
08/27/2026B00848199-I1Open ↗
08/27/2026B00848199-P1Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/24/2024322117115Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification6
08/26/2026B08049525-P8Open ↗
08/26/2026B08049525-P7Open ↗
08/26/2026B08049525-P6Open ↗
Showing 3 of 6 on file for this type
▸BISRESTRICTION: DEED1
05/10/2024322117115Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/10/2024322117115Open ↗
▸BISPLOT DIAGRAM1
05/10/2024322117115Open ↗
▸DOB NOWFinal Survey1
08/14/2026B08049525-I1Open ↗