← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Quarte Deux Condominium
42 WEST 15TH STREET · BIN 1015300
💬 Discuss this project
1902Year Built
8Stories
RMBuilding Class
C6-2MZoning
15,551 sfGross Floor Area
8Units
Rent Stabilized0 Active Violations 1 likely answered ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 2,581 sf lot · 6.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 35p · 1 filing · 11 docs
Floor 2
Floor 1
CellarQuarante Deux2p · 1 filing · 20 docs
Site & exteriorQuarante Deux9p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Quarante Deux4003/22/2026
The Complete Tile Collection103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JDJ Engineering109/23/2022
Mohammad Ahead, PE109/23/2022
Edward Madocks, Architect108/11/2022
Revans Design PE412/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arsenal Building Consultants203/21/2026
Socotec203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Planet Construction & de*General Contractor507/08/2026
Royalty Heating and ACspecialty_contractor303/21/2026
Kings Group NYScaffold303/21/2026
Victory Plumbing & HeatingPlumbing307/08/2026
Bay ElectricElectrical203/22/2026
Atlas-Acon Electric ServiceElectrical103/21/2026
Pugliese FrankElectrical103/21/2026
Willdan Electrical of NYElectrical103/22/2026
A & M Electrical ServiceElectrical103/21/2026
C. B. ElectricElectrical103/21/2026
Judd ElectricElectrical103/21/2026
Patriot ElectricElectrical103/21/2026
Katz MichaelElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JDJ Engineering6780109/23/2022
Amka & Associates8239108/11/2022
Revans Design PE4617312/11/2020
Robert F. Germain Jr. PE5100110/20/2020
Building Lifecycle
All (118)Filed (8)Permit Issued (11)Signed Off (5)Facade (FISP) (15)Violation (26)Objection (24)Special Inspection (29)
06/13/2025
Signed off — Alteration
INSTALLATION OF OUTRIGGER AND MATERIAL HOIST FOR THE FACADE REPAIR WORK AS PER PLAN SUBMITTED.
M00968806-I1
06/13/2025
Permit issued — Suspended Scaffold
M00968806-I1-SC
06/26/2024
Signed off — Alteration
Filing for FISP Cycle 9A facade repairs and to address DOB violation #04262022LLFAMB02 and ECB violation #035647279L. No change to use, egress or occupancy under this application.
M00786080-I1
06/26/2024
Permit issued — General Construction
M00786080-I1-GC
02/28/2024
Permit issued — Suspended Scaffold
M00968806-I1-SC
12/22/2023
Cycle 9 facade report submitted
12/21/2023
Cycle 9 facade report signed — SWARMP
12/15/2023
Permit issued — Suspended Scaffold
M00968806-I1-SC
12/14/2023
Objection raised — Other
12/14/2023
Objection resolved — Addressed
12/13/2023
Cycle 9 facade inspection completed
11/30/2023
Filed — Alteration
INSTALLATION OF OUTRIGGER AND MATERIAL HOIST FOR THE FACADE REPAIR WORK AS PER PLAN SUBMITTED.
M00968806-I1
10/06/2023
Permit issued — Mechanical Systems
M00713337-I1-MS
09/11/2023
Permit issued — General Construction
M00786080-I1-GC
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2023
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M08009006-I1
10/17/2022
Objection raised — Other
10/17/2022
Objection resolved — Addressed
10/17/2022
Objection raised — Zoning
10/17/2022
Objection resolved — Addressed
10/17/2022
Objection raised — Mechanical
10/17/2022
Objection resolved — Addressed
10/17/2022
Objection raised — Other
10/17/2022
Objection resolved — Addressed
10/17/2022
Objection raised — Other
10/17/2022
Objection resolved — Addressed
10/17/2022
Objection raised — Energy
10/17/2022
Objection resolved — Addressed
10/17/2022
Objection raised — Fire_Protection
10/17/2022
Objection resolved — Addressed
10/03/2022
Permit issued — General Construction
M00786080-I1-GC
09/23/2022
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M08009006-I1
09/23/2022
Filed — Alteration
FURNISH ONE (1) 2.5-TON, ONE (1) 3-TON DUCTED HEATING & COOLING INVERTER-BASED HEAT PUMP SYSTEMS W/TWO (2) INDOOR DUCTED AHUS & ASSOCIATED THERMOSTATS FOR APT. #3. CONNECTIONS TO EXIST. DUCTWORK AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00713337-I1
09/23/2022
Permit issued — Sidewalk Shed
M08009006-I1-SH
09/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jonathan Johrden
09/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Jonathan Johrden
09/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Johrden
09/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jonathan Johrden
09/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jonathan Johrden
09/22/2022
Special inspection requirement — Maintenance information
Jonathan Johrden
08/16/2022
Objection raised — Other
08/16/2022
Objection resolved — Addressed
08/16/2022
Objection raised — Other
08/16/2022
Objection resolved — Addressed
08/16/2022
Objection raised — Other
08/16/2022
Objection resolved — Addressed
08/16/2022
Objection raised — Other
08/16/2022
Objection resolved — Addressed
08/11/2022
Filed — Alteration
Filing for FISP Cycle 9A facade repairs and to address DOB violation #04262022LLFAMB02 and ECB violation #035647279L. No change to use, egress or occupancy under this application.
M00786080-I1
08/10/2022
Special inspection requirement — Final
EDWARD MADOCKS
08/09/2022
Special inspection requirement — Masonry
AHMAD KHANZADA
06/17/2022
Cycle 9 facade report signed — SWARMP
04/26/2022
Violation issued (ECB, closed)
Construction
04/06/2022
Special inspection requirement — Final
Jonathan Johrden
04/06/2022
Special inspection requirement — Mechanical Systems
Jonathan Johrden
02/10/2022
Cycle 9 facade report submitted
02/10/2022
Cycle 9 facade inspection completed
04/21/2021
Signed off — Alteration
REPLACE (1) NEW LOW PRESSURE STEAM BOILER AND (1) NEW NATURAL GAS BURNER IN SAME PLACE AS EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00229592-S3
04/20/2021
Signed off — Alteration
REPLACE (1) NEW LOW PRESSURE STEAM BOILER AND (1) NEW NATURAL GAS BURNER IN SAME PLACE AS EXISTING. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
M00229592-I1
03/18/2021
Permit issued — Boiler Equipment
M00229592-I1-BE
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offApex Group NY06/13/2025
DOB NOWGeneral ConstructionSigned-offPlanet Construction & de*06/26/2024
DOB NOWSuspended ScaffoldSigned-offApex Group NY02/28/2024
DOB NOWSuspended ScaffoldSigned-offApex Group NY12/15/2023
DOB NOWMechanical SystemsPermit IssuedRoyalty Heating and AC10/06/2023
DOB NOWGeneral ConstructionSigned-offPlanet Construction & de*09/11/2023
DOB NOWGeneral ConstructionSigned-offPlanet Construction & de*10/03/2022
DOB NOWSidewalk ShedSigned-offKings Group NY09/23/2022
DOB NOWBoiler EquipmentSigned-offVictory Plumbing & Heating03/18/2021
DOB NOWBoiler EquipmentSigned-offVictory Plumbing & Heating10/21/2020
DOB NOWBoiler EquipmentSigned-offVictory Plumbing & Heating12/12/2019
BISPLISSUEDVictory Plumbing & Heating02/16/2022
BISBLISSUEDVictory Plumbing & Heating12/22/2020
BISPLISSUEDVictory Plumbing & Heating12/16/2020
BISPLISSUEDVictory Plumbing & Heating11/23/2020
BISPLISSUEDVictory Plumbing & Heating11/23/2020
BISOTISSUEDDavrial Enterprises04/30/2018
BISPLISSUEDMCM Plumbing & Heating11/04/2016
BISMHISSUEDBluetec Cabinetry09/20/2016
BISOTISSUEDBluetec Cabinetry09/20/2016
BISPLISSUEDDC Building Services04/23/2015
BISEQISSUEDEverest Scaffolding09/25/2009
BISMHISSUEDChristopher Stachecki02/13/2009
BISOTISSUEDChristopher Stachecki02/13/2009
BISPLISSUEDM & A Plumbing & Heating10/31/2008
BISOTISSUEDChristopher Stachecki10/10/2008
BISMHISSUEDChristopher Stachecki10/10/2008
BISPLISSUEDRobert J. Sankey P&H05/21/2008
BISMHISSUEDTL Contractors05/02/2008
BISOTISSUEDTL Contractors05/02/2008
BISOTISSUEDJepol Construction03/18/2008
BISPLISSUEDAvon Plumbing & Heating01/23/2006
BISMHISSUEDBando Construction01/12/2006
BISPLISSUEDAvon Plumbing & Heating03/28/2005
BISOTISSUEDBando Construction03/10/2005
BISMHISSUEDBando Construction03/10/2005
BISEQISSUEDRockledge Scaffold01/05/2005
BISOTISSUEDGS Universal Construction12/07/2004
BISOTISSUEDGS Universal Construction11/27/2004
BISEQISSUEDRockledge Scaffold07/08/2004
+ 18 more permits on file
1 project · most recent 09/23/2022
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2022Permit IssuedRoyalty Heating and ACHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU30RGLX 30,000 BTU · Heat Pump Outdoor ×1
AOU36RGLX 36,000 BTU · Heat Pump Outdoor ×1
4 projects · most recent 02/25/2022
FiledStatusContractorScope
02/25/2022CompleteBay Electric10 meters, 4 new_meters
11/02/2019CompleteHI-Lights Electric—
03/20/2018CompleteStar Electrical Contractors—
03/09/2018CompleteWilldan Electrical of NY—
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
09/22/2022HVAC-R and service water piping design and insulationJonathan Johrdenenergy_progress
09/22/2022Energy Code Compliance InspectionsJonathan Johrdenprogress
09/22/2022Fire-Resistant Penetrations and JointsJonathan Johrdenspecial
09/22/2022HVAC-R and service water heating equipmentJonathan Johrdenenergy_progress
09/22/2022HVAC-R and service water heating system controlsJonathan Johrdenenergy_progress
09/22/2022Maintenance informationJonathan Johrdenenergy_progress
08/10/2022FinalEDWARD MADOCKSprogress
08/09/2022MasonryAHMAD KHANZADAspecial
04/06/2022FinalJonathan Johrdenprogress
04/06/2022Mechanical SystemsJonathan Johrdenspecial
12/11/2020HVAC and service water heating system controls PAUL REVANSenergy_progress
12/11/2020HVAC and service water heating equipment PAUL REVANSenergy_progress
12/11/2020Fire-Resistant Penetrations and JointsPAUL REVANSspecial
12/11/2020Heating SystemsPAUL REVANSspecial
12/11/2020Maintenance informationPAUL REVANSenergy_progress
10/23/2020HVAC and service water heating equipment PAUL REVANSenergy_progress
10/23/2020Fire-Resistant Penetrations and JointsPAUL REVANSspecial
10/23/2020Maintenance informationPAUL REVANSenergy_progress
10/23/2020Heating SystemsPAUL REVANSspecial
10/23/2020HVAC and service water heating system controls PAUL REVANSenergy_progress
10/19/2020Maintenance informationPAUL REVANSenergy_progress
10/19/2020Fire-Resistant Penetrations and JointsRobert Germain Jr.special
10/19/2020HVAC and service water heating equipment PAUL REVANSenergy_progress
10/19/2020HVAC and service water heating system controls PAUL REVANSenergy_progress
09/11/2020Heating SystemsPAUL REVANSspecial
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Quarante DeuxRestaurant / Food ServiceCellar
Project M00786080 Alteration · LOC Issued · 08/11/2022
Project M00229592 Alteration · LOC Issued · 12/03/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 267 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/05/2026M00229592-S3Request digital key ↗
09/05/2026M00229592-P1Request digital key ↗
09/05/2026M00229592-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch4
09/01/2026M08009006-I1Request digital key ↗
08/15/2026M00713337-I1Request digital key ↗
08/14/2026M00786080-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION33
05/18/2022100172705Open ↗
04/06/2022100172705Open ↗
01/26/2021100172705Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION21
12/23/2020100172705Open ↗
12/16/2020100172705Open ↗
11/25/2020100172705Open ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
10/19/2021122772794Open ↗
10/19/2021122772794Open ↗
01/14/2020100172705Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026M00229592-I1Open ↗
09/23/2026M00229592-S3Open ↗
09/23/2026M00229592-S3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026M00229592-S3Open ↗
09/23/2026M00229592-I1Open ↗
09/23/2026M00229592-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/05/2026M00229592-S3Open ↗
09/05/2026M00229592-P1Open ↗
09/05/2026M00229592-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/25/2009120164455Open ↗
10/09/2008110355133Open ↗
10/09/2008110355133Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/18/2019123744038Open ↗
09/25/2009120164455Open ↗
10/09/2008110355133Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/18/2019123744038Open ↗
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING6
04/06/2022100172705Open ↗
08/15/2009110355133Open ↗
08/13/2009110355133Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
05/20/2015110133105Open ↗
10/05/2009110355133Open ↗
09/30/2009110355133Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
10/13/2021122772794Open ↗
09/25/2017122772794Open ↗
09/25/2017122772794Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/06/2019100172705Open ↗
08/10/2016122772794Open ↗
▸BISGAS CUT-OFF1
12/16/2020100172705Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/17/2017122772794Open ↗
▸BISEQUIPMENT USE PERMITS1
10/13/2021122772794Open ↗
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan4
09/05/2026M00229592-S3Open ↗
09/05/2026M00229592-P1Open ↗
09/05/2026M00229592-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes2
09/18/2019123744038Open ↗
05/05/2016122772794Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/05/2026M00229592-S3Open ↗
09/05/2026M00229592-P1Open ↗
09/05/2026M00229592-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
10/09/2008110355133Open ↗
05/05/2008110154724Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/18/2019123744038Open ↗
05/05/2016122772794Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/25/2009120164455Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
09/18/2019123744038Open ↗
05/24/2018122376115Open ↗
03/26/2018122376115Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/28/2020123744038Open ↗
05/24/2018122376115Open ↗
09/25/2017122772794Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/28/2020123744038Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/05/2026M00229592-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/28/2020123744038Open ↗
10/28/2020123744038Open ↗
06/09/2020100172705Open ↗
▸Approvals, Objections & Sign-offs23
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
10/28/2020123744038Open ↗
05/24/2018122376115Open ↗
10/13/2017122772794Open ↗
Showing 3 of 11 on file for this type
▸BISSUPERSEDING LETTER7
12/23/2020100172705Open ↗
12/16/2020100172705Open ↗
11/25/2020100172705Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/25/2009120164455Open ↗
10/09/2008110355133Open ↗
05/05/2008110154724Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/28/2020123744038Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT21
10/28/2020123744038Open ↗
09/18/2019123744038Open ↗
05/24/2018122376115Open ↗
Showing 3 of 21 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
09/30/2016122772794Open ↗
10/10/2008110355133Open ↗
▸Filing & Intake Forms33
▸BISBOROUGH INTAKE FORM17
12/23/2020100172705Open ↗
11/25/2020100172705Open ↗
11/25/2020100172705Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET11
09/18/2019123744038Open ↗
08/10/2016122772794Open ↗
08/10/2016122772794Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
03/26/2018122376115Open ↗
10/06/2017122772794Open ↗
08/08/2017122772794Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M00968806-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00968806-I1Open ↗