| Owner | Filings | Most Recent |
|---|---|---|
| BLDG MANAGEMENT | 251 | 09/14/2026 |
| CREATIVE DESIGN UNLIMITED, LLC | 12 | 07/08/2026 |
| PLATINUM SERVICES NY | 6 | 07/08/2026 |
| BLDG 424 SADDLEBACK | 34 | 03/22/2026 |
| ARCHSTONE BUILDERS | 1 | 03/22/2026 |
| MATMAR | 7 | 03/22/2026 |
| OWNER OF PREMISES 424 MAD | 1 | 03/22/2026 |
| CARAN PROPERTIES | 3 | 03/22/2026 |
| AXIOM REAL ESTATE MGT | 1 | 03/22/2026 |
| 424 MADISON ASSOCIATE | 3 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| JACK GREEN ASSOCIATES | 28 | 08/07/2026 |
| JIN LEE, RA | 3 | 06/01/2026 |
| RAND ENGINEERING & ARCHITECTURE, DP | 4 | 05/07/2026 |
| ZZ ARCHITECTURE PLLC | 11 | 05/04/2026 |
| SB CONSULTING ENGINEERS, LLC | 2 | 02/26/2026 |
| SY ENGINEERING PLLC | 11 | 06/30/2025 |
| HIGHLAND ASSOCIATES | 2 | 06/18/2025 |
| YOUN DESIGN CORP. | 2 | 12/15/2024 |
| KWHC CONSULTING ENGINEER PLLC | 1 | 05/10/2024 |
| TBD ARCHITECTURE AND DESIGN STUDIO | 1 | 01/24/2024 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 01/08/2024 |
| M + K DEVELOPMENT, LLC | 1 | 10/17/2023 |
| ASIF JAMIL, RA | 1 | 08/06/2020 |
| FMC ENGINEERING, PC | 5 | 02/21/2020 |
| LEON SKVIRSKY PE | 2 | 07/24/2019 |
| BAILEYS ENGINEERING PC | 1 | 11/30/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| LMS-ACE SERVICES | 11 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 43 | 03/21/2026 |
| RIGGING CONSULTANTS | 2 | 03/21/2026 |
| HTX BUILDING CONSULTING | 11 | 03/21/2026 |
| J CALLAHAN CONSULTING | 8 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 2 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| RIZZO GROUP | 2 | 03/21/2026 |
| CCM CONSULTING GROUP, INC. | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JOY CONSULTING INC | General Contractor | 11 | 07/08/2026 |
| CREATIVE TEAM INTERIORS I | General Contractor | 9 | 07/25/2026 |
| OMARA ORGANIZATION INC | General Contractor | 7 | 07/08/2026 |
| AIR STREAM AIR CONDITIONING | General Contractor | 7 | 07/08/2026 |
| EL-ROC CONTRACTING OF BK | Plumbing | 5 | 07/30/2026 |
| EL-ROC CONTG OF BKLYN INC | Fire Protection | 5 | 09/09/2026 |
| WESBUILT CONSTRUCTION MAN | General Contractor | 4 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 4 | 07/08/2026 |
| OPTIMUS CONSTRUCTION&DEV* | General Contractor | 3 | 03/21/2026 |
| VEZANDIO CONTRACTING CORP | General Contractor | 3 | 03/21/2026 |
| PRESTIGIOUS MAINTENANCE I | General Contractor | 3 | 03/21/2026 |
| JAM SERVICE CO., INC | Fire Protection | 3 | 07/08/2026 |
| NATIONAL MAINTENANCE | Scaffold | 2 | 07/08/2026 |
| PLUMBING WORKS CORP | Fire Protection | 2 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 2 | 07/08/2026 |
| VMMA CONSTRUCTION LLC | General Contractor | 2 | 03/21/2026 |
| GEORGE BRESLAW PLBNG LLC | Plumbing | 2 | 07/08/2026 |
| JAM SERVICE CO., INC | Plumbing | 2 | 07/08/2026 |
| MAC FELDER INC | Plumbing | 2 | 07/08/2026 |
| J L HVAC INC | General Contractor | 1 | 08/26/2026 |
| SPENELLI, RICHARD | Electrical | 1 | 03/21/2026 |
| RAMDATH, JAIDATH | Electrical | 1 | 03/21/2026 |
| LOUIS DEMICHELE | Electrical | 1 | 03/21/2026 |
| KONTOROUHAS EMANUEL | Electrical | 1 | 03/21/2026 |
| JOSEPH PALETTO | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| JACK GREEN ASSOCIATES | 422 | 38 | 08/07/2026 |
| SY ENGINEERING PLLC | 5149 | 4 | 06/01/2026 |
| JAMES JH CHAI & ASSOCIATE | 6481 | 2 | 06/01/2026 |
| ZZ ARCHITECTURE PLLC | 8687 | 3 | 05/04/2026 |
| CROSSCHECK INSPECTION SER | 544 | 4 | 04/28/2026 |
| CHONG ENGINEERING P.C. | 7411 | 8 | 06/30/2025 |
| PCS ENGINEERING | 3745 | 1 | 05/19/2025 |
| TBD ARCHITECTURE & DESIGN | 3238 | 1 | 01/24/2024 |
| M + K DEVELOPMENT VENTURE | 8486 | 1 | 10/17/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | EL-ROC CONTG OF BKLYN INC | 09/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | J L HVAC INC | 08/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | EL-ROC CONTRACTING OF BK | 07/29/2026 |
| DOB NOW | General Construction | Permit Issued | CREATIVE TEAM INTERIORS I | 07/23/2026 |
| DOB NOW | General Construction | Permit Issued | PRINCIPAL BUILDERS SOLUTI | 07/09/2026 |
| DOB NOW | General Construction | Signed-off | CREATIVE TEAM INTERIORS I | 04/08/2026 |
| DOB NOW | Mechanical Systems | Signed-off | AIR STREAM AIR CONDITIONI | 03/19/2026 |
| DOB NOW | General Construction | Signed-off | CREATIVE TEAM INTERIORS I | 03/18/2026 |
| DOB NOW | Sprinklers | Signed-off | EL-ROC CONTG OF BKLYN INC | 03/18/2026 |
| DOB NOW | Plumbing | Permit Issued | EL-ROC CONTRACTING OF BK | 03/18/2026 |
| DOB NOW | Structural | Signed-off | JOY CONSULTING INC | 11/19/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | AIR STREAM AIR CONDITIONI | 08/21/2025 |
| DOB NOW | Plumbing | Signed-off | EL-ROC CONTRACTING OF BK | 08/06/2025 |
| DOB NOW | Sprinklers | Signed-off | EL-ROC CONTG OF BKLYN INC | 08/06/2025 |
| DOB NOW | Plumbing | Signed-off | P & D MECHANICAL CORP | 07/21/2025 |
| DOB NOW | Sprinklers | Signed-off | CM PLUMBING INC | 07/21/2025 |
| DOB NOW | General Construction | Signed-off | THE SCI CONSTRUCTION | 07/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | AIR STREAM AIR CONDITIONI | 07/14/2025 |
| DOB NOW | General Construction | Signed-off | WESBUILT CONSTRUCTION MAN | 06/24/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | SAFETECH ENTERPRISES CORP | 05/28/2025 |
| DOB NOW | Sprinklers | Signed-off | UNIVERSAL FIRE SPR LLC | 01/31/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CREATIVE TEAM INTERIORS I | 01/16/2025 |
| DOB NOW | General Construction | Signed-off | JOY CONSULTING INC | 01/14/2025 |
| DOB NOW | General Construction | Signed-off | JOY CONSULTING INC | 01/14/2025 |
| DOB NOW | Sprinklers | Permit Issued | AVON PLBG & HTG INC | 10/17/2024 |
| DOB NOW | Sprinklers | Signed-off | POWER PLUMBING & HEATING | 10/09/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | M.G.R. RESTORATION INC | 09/20/2024 |
| DOB NOW | Sprinklers | Signed-off | EL-ROC CONTG OF BKLYN INC | 09/16/2024 |
| DOB NOW | Plumbing | Signed-off | EL-ROC CONTRACTING OF BK | 09/12/2024 |
| DOB NOW | General Construction | Signed-off | CREATIVE TEAM INTERIORS I | 09/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | PRESTIGIOUS MAINTENANCE I | 09/04/2024 |
| DOB NOW | General Construction | Signed-off | JOY CONSULTING INC | 06/06/2024 |
| DOB NOW | General Construction | Signed-off | JOY CONSULTING INC | 05/29/2024 |
| DOB NOW | Sprinklers | Permit Issued | DDS MECHANICAL FPS CORP | 04/16/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | AIR STREAM AIR CONDITIONI | 02/29/2024 |
| DOB NOW | Plumbing | Signed-off | D.D.S. MECH PBG&HTG CORP | 02/14/2024 |
| DOB NOW | General Construction | Signed-off | OPTIMUS CONSTRUCTION&DEV* | 02/14/2024 |
| DOB NOW | Structural | Signed-off | VEZANDIO CONTRACTING CORP | 01/24/2024 |
| DOB NOW | Antenna | Signed-off | SKYLINE STEEL FABRICATORS | 12/12/2023 |
| DOB NOW | Sprinklers | Signed-off | BLUEWATER P&H, INC | 10/19/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/07/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | |
| 04/28/2026 | Permit Issued | J L HVAC INC | Heating and Air Conditioning Systems, Ventilation Systems | |
| 02/26/2026 | Signed-off | CREATIVE TEAM INTERIORS I | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool Lg ARNU363M2A4 40,600 BTU · Vrf Indoor ×2 ARNU123MAA4 13,600 BTU · Vrf Indoor ×1 ARNU483M3A4 54,200 BTU · Vrf Indoor ×1 ARUM144BTE5 162,000 BTU · Vrf Outdoor ×1 Heating Ventilation |
| 11/07/2025 | Permit Issued | AIR STREAM AIR CONDITIONI | Heating and Air Conditioning Systems | Heat / Cool Lg ARNU543B8A4 54,000 BTU · Vrf Indoor ×15 ARNU093SJS4 9,600 BTU · Vrf Indoor ×5 ARUM192BTE5 216,000 BTU · Vrf Outdoor ×5 |
| 06/18/2025 | Signed-off | AIR STREAM AIR CONDITIONI | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | |
| 02/21/2020 | Permit Issued | AIR STREAM AIR CONDITIONI | Air Conditioning Systems | Cooling Daikin FXSQ24TAVJU 2 tons · Vrf Indoor ×4 FXSQ30TAVJU 25 tons · Vrf Indoor ×4 RXTQ48TAVJU 4 tons · Vrf Outdoor ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Signed-off | EL-ROC CONTG OF BKLYN INC | 70 heads |
| 06/01/2026 | — | — | Sprinkler System |
| 05/07/2026 | — | — | Sprinkler System |
| 04/28/2026 | Permit Issued | EL-ROC CONTG OF BKLYN INC | — |
| 06/30/2025 | Permit Issued | AVON PLBG & HTG INC | Sprinkler System |
| 02/10/2020 | Permit Issued | JAM SERVICE CO., INC | 47 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2026 | Signed-off | EL-ROC CONTRACTING OF BK | Water/Sanitary |
| 06/01/2026 | — | — | Water/Sanitary |
| 05/07/2026 | — | — | Water/Sanitary |
| 04/28/2026 | Permit Issued | EL-ROC CONTRACTING OF BK | Water/Sanitary |
| 06/30/2025 | Signed-off | POWER PLUMBING & HEATING | Gas, Water/Sanitary |
| 02/14/2020 | Signed-off | JAM SERVICE CO., INC | Water/Sanitary |
| 02/10/2020 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/15/2026 | Complete | ASKO ELEC CONST & MAIN IN | General Wiring |
| 11/25/2025 | Permit Issued | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 06/04/2024 | Complete | ETRICITY ELECTRICAL CO IN | General Wiring |
| 11/01/2023 | Permit Issued | J.A. LEE ELEC SVCS LLC | 2 meters, 1 new_meters |
| 07/12/2023 | Complete | TIKVAH ELECTRIC CO, INC. | General Wiring |
| 10/05/2022 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| 08/07/2020 | Complete | ILLUMINOUS ELECTRIC CORP. | — |
| 12/19/2018 | Permit Issued | NEE ELECTRICAL, LLC | General Wiring |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/06/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/29/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/23/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/30/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/27/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/05/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/26/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/17/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/02/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/03/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 05/16/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 03/28/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/19/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/19/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/18/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/20/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/10/2026 | Sprinkler Systems | LAWRENCE GREEN | special |
| 08/10/2026 | Fire-Resistant Penetrations and Joints | LAWRENCE GREEN | special |
| 08/10/2026 | Post-installed Anchors | LAWRENCE GREEN | special |
| 08/10/2026 | Energy Code Compliance Inspections | LAWRENCE GREEN | progress |
| 06/26/2026 | Energy Code Compliance Inspections | LAWRENCE GREEN | progress |
| 06/26/2026 | Fire-Resistant Penetrations and Joints | LAWRENCE GREEN | special |
| 06/26/2026 | Post-installed Anchors | LAWRENCE GREEN | special |
| 06/26/2026 | Sprinkler Systems | LAWRENCE GREEN | special |
| 05/19/2026 | Sprinkler Systems | SUNGBOM YI | special |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | Ziv Zamir | special |
| 05/01/2026 | Energy Code Compliance Inspections | Ziv Zamir | progress |
| 05/01/2026 | Final | Ziv Zamir | progress |
| 05/01/2026 | Fire-Resistance Rated Construction | Ziv Zamir | progress |
| 05/01/2026 | Interior lighting power | Ziv Zamir | energy_progress |
| 05/01/2026 | Lighting controls | Ziv Zamir | energy_progress |
| 05/01/2026 | Mastic and Intumescent Fire-resistant Coatings | — | special |
| 04/24/2026 | Energy Code Compliance Inspections | EUGENE BIFULCO | progress |
| 04/24/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 04/24/2026 | Energy Code Compliance Inspections | EUGENE BIFULCO | progress |
| 04/24/2026 | HVAC-R and service water piping design and insulation | EUGENE BIFULCO | energy_progress |
| 04/24/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 04/24/2026 | Heating Systems | EUGENE BIFULCO | special |
| 04/24/2026 | HVAC-R and service water heating system controls | EUGENE BIFULCO | energy_progress |
| 04/24/2026 | HVAC-R and service water heating equipment | EUGENE BIFULCO | energy_progress |
| 04/24/2026 | Maintenance information | EUGENE BIFULCO | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Blue Panther | Office | Floor 6 | Project M01227044 |
| Bagizza | Restaurant / Food Service | Floor 1 | Project M01035145 |
| Fleischman Salon | Other | Floor 9 | Project M00967763 Project M00967745 Project M00967755 Project M00965795 |
| Joseph Abboud | Retail | Floors 1–5 | Project M00167972 Project M00168018 |