← Back
Self-storage warehouse
425 GREENPOINT AVENUE
BROOKLYN · BIN 3336838
💬 Discuss this project
1931Year Built
5Stories
E7Building Class
M3-1Zoning
116,000 sfGross Floor Area
3Units
LL97 Covered2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Self-storage warehouse · Owner of record: GREENPOINT STORAGE REALTY LLC · 59,260 sf lot · 1.96 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 13 docs
Floor 53p · 1 filing · 3 docs
Floor 43p · 1 filing · 3 docs
Floor 33p · 1 filing · 3 docs
Floor 23p · 1 filing · 3 docs
Floor 13p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIBERTY REALTY809/13/2026
KINGS GROUP NY1007/08/2026
RELIABLE ENTERPRISES707/08/2026
GREEN POINT STORAGE REALTY LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/24/2013$10.5M—— → —$91/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THE MTM DESIGN GROUP, LLC308/12/2026
ENTHINK ENGINEERS LLC201/10/2022
GREEN DESIGN104/15/2021
SYED ENGINEERING, P.C.103/25/2021
MOHAMMAD AHEAD, PE103/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor507/08/2026
RAMNARINE JAGNARINEElectrical303/21/2026
PREMIER CONSTRUCT SVC LLCGeneral Contractor207/08/2026
D. PATTAR CONSTRUCTION COGeneral Contractor107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE MTM DESIGN GROUP, LLC1319308/12/2026
BUTTERFIELD & O'CONNOR4189104/15/2021
Building Lifecycle
All (65)Filed (8)Permit Issued (7)Signed Off (5)Violation (30)Inspection (4)Objection (6)Special Inspection (5)
08/25/2026
Signed off — Alteration
Modification to existing VERIZON site on the roof. Install 1 sector (3 antennas), 2 antennas, 6 RRH units, 3 OVP's, 2 cabinets and 2 GPS antennas. Replace 2 antennas & 2 RRH units. Relocate 1 antenna & 2 GPS antennas. Remove 2 cabinets.
B00853929-S1
08/25/2026
Signed off — Alteration
Modification to existing VERIZON site on the roof. Install 1 sector (3 antennas), 2 antennas, 6 RRH units, 3 OVP's, 2 cabinets and 2 GPS antennas. Replace 2 antennas & 2 RRH units. Relocate 1 antenna & 2 GPS antennas. Remove 2 cabinets.
B00853929-I1
08/24/2026
Special inspection requirement — Mechanical Systems
Robert Toms
08/24/2026
Special inspection requirement — Final
Robert Toms
08/12/2026
Filed — Alteration
Modification to existing VERIZON site on the roof. Install 1 sector (3 antennas), 2 antennas, 6 RRH units, 3 OVP's, 2 cabinets and 2 GPS antennas. Replace 2 antennas & 2 RRH units. Relocate 1 antenna & 2 GPS antennas. Remove 2 cabinets.
B00853929-P1
08/04/2026
Special inspection requirement — Mechanical Systems
Robert Toms
08/04/2026
Special inspection requirement — Final
Robert Toms
02/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/01/2025
Permit issued — Antenna
B00853929-I1-AN
12/01/2025
Permit issued — Mechanical Systems
B00853929-S1-MS
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
07/30/2025
Objection raised — Scope
07/30/2025
Objection raised — Zoning
07/30/2025
Objection raised — Other
07/21/2025
Filed — Alteration
Modification to existing VERIZON site on the roof. Install 1 sector (3 antennas), 2 antennas, 6 RRH units, 3 OVP's, 2 cabinets and 2 GPS antennas. Replace 2 antennas & 2 RRH units. Relocate 1 antenna & 2 GPS antennas. Remove 2 cabinets.
B00853929-S1
07/17/2025
Filed — Alteration
Modification to existing VERIZON site on the roof. Install 1 sector (3 antennas), 2 antennas, 6 RRH units, 3 OVP's, 2 cabinets and 2 GPS antennas. Replace 2 antennas & 2 RRH units. Relocate 1 antenna & 2 GPS antennas. Remove 2 cabinets.
B00853929-I1
02/24/2023
Signed off — Alteration
B00492335-I1
08/01/2022
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00602714-I1
06/21/2022
Signed off — Alteration
B00492342-I1
03/25/2022
Permit issued — Sidewalk Shed
B00492335-I1-SH
02/16/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/12/2022
Special inspection requirement — Final
Sunil Saigal
01/10/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00602714-P1
11/24/2021
Violation issued (ECB, closed)
Construction
11/24/2021
Violation issued (ECB, closed)
Construction
11/12/2021
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
11/03/2021
Permit issued — General Construction
B00491628-I1-GC
10/01/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00602714-I1
10/01/2021
Permit issued — Supported Scaffold
B00602714-I1-SF
04/15/2021
Filed — Alteration
INSTALLATION OF STUCCO AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION
B00491628-I1
03/26/2021
Permit issued — Supported Scaffold
B00492342-I1-SF
03/26/2021
Permit issued — Sidewalk Shed
B00492335-I1-SH
03/25/2021
Filed — Alteration
B00492335-I1
03/25/2021
Filed — Alteration
B00492342-I1
09/15/2016
Violation issued (FDNY_ORDER, closed)
03/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/12/2015
Violation issued (FDNY_NOV, closed)
06/24/2014
Violation issued (FDNY_NOV, closed)
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/03/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/08/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/08/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offPREMIER CONSTRUCT SVC LLC12/01/2025
DOB NOWMechanical SystemsSigned-offPREMIER CONSTRUCT SVC LLC12/01/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP03/25/2022
DOB NOWGeneral ConstructionPermit IssuedD. PATTAR CONSTRUCTION CO11/03/2021
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC10/01/2021
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP03/26/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP03/26/2021
BISOTISSUEDRAMAPO COMMUNICATION CORP03/09/2015
BISEQISSUEDP.J.B. CONTRACTING CORP04/06/2011
BISOTISSUEDRAFAE CONSTRUCTION CORP04/06/2011
BISPLISSUEDAMERICAN NATIONAL PL & HTG CORP10/04/2006
BIS—ISSUEDINTERBORO SIGN & MAINTENANCE CO09/19/2002
BIS—ISSUEDEMANUEL BROS CONSTR CORP04/28/1993
1 project · most recent 08/12/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Signed-offPREMIER CONSTRUCT SVC LLCHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-RH36MASTWM-230VI / CH-REL36-230VO 36,000 BTU · Heat Pump Outdoor ×1
7 projects · most recent 01/02/2026
General Wiring
FiledStatusContractorScope
01/02/2026CompleteUL ELECTRICAL CORP.—
01/02/2026CompleteUL ELECTRICAL CORP.—
01/02/2026CompleteUL ELECTRICAL CORP.General Wiring
04/20/2021Permit IssuedHIGH QUALITY ELECTRIC OF—
02/19/2021CompleteGEMINI ELECTRIC CO., INC.General Wiring
11/05/2019CompleteGEMINI ELECTRIC CO., INC.General Wiring
10/30/2019CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/12/2021Fail-Final PL - UndergroundFailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/24/2026Mechanical SystemsRobert Tomsspecial
08/24/2026FinalRobert Tomsprogress
08/04/2026Mechanical SystemsRobert Tomsspecial
08/04/2026FinalRobert Tomsprogress
01/12/2022FinalSunil Saigalprogress
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00492335-I1Request digital key ↗
09/01/2026B00492342-I1Request digital key ↗
09/01/2026B00491628-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
02/11/2015321065609Open ↗
05/24/2011320310187Open ↗
04/11/2011320295649Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
03/09/2015321065609Open ↗
05/24/2011320310187Open ↗
04/08/2011320295630Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00492335-I1Open ↗
09/01/2026B00492342-I1Open ↗
09/01/2026B00491628-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/11/2015321065609Open ↗
05/24/2011320310187Open ↗
04/11/2011320295649Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
05/24/2011320310187Open ↗
04/11/2011320295649Open ↗
04/04/2011320295630Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/24/2011320310187Open ↗
04/11/2011320295649Open ↗
04/04/2011320295630Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026B00853929-S1Open ↗
08/27/2026B00853929-P1Open ↗
08/23/2026B00602714-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B00853929-S1Open ↗
08/27/2026B00853929-P1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00491628-I1Open ↗
08/21/2026B00853929-I1Open ↗
08/21/2026B00853929-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/24/2011320310187Open ↗
04/11/2011320295649Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/11/2015321065609Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/04/2011320295630Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/11/2015321065609Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS4
02/11/2015321065609Open ↗
05/24/2011320310187Open ↗
04/11/2011320295649Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/11/2015321065609Open ↗
04/11/2011320295649Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
02/11/2015321065609Open ↗
05/24/2011320310187Open ↗
04/11/2011320295649Open ↗
Showing 3 of 4 on file for this type