← Back
Primarily 2 family with 1 store or office
429 COLUMBIA STREET
BROOKLYN · BIN 3008429
💬 Discuss this project
1921Year Built
3Stories
S2Building Class
R5Zoning
2,045 sfGross Floor Area
3Units
0 Open Violations
Primarily 2 family with 1 store or office · Owner of record: 429 COLUMBIA LLC · 1,670 sf lot · 1.22 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 15 docs
Floor 3Under Construction4p · 1 filing · 15 docs
Floor 2Under Construction5p · 1 filing · 15 docs
Floor 1Under Construction1p · 1 filing · 15 docs
CellarUnder Construction5p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
76 LEXINGTON407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2025$900K—429 COLUMBIA STREET ASSOCIATES INC. → 429 COLUMBIA LLC$440/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHOSEN MEP, CORP.101/05/2026
PRAMODRAY SHAH, P.E.107/08/2025
MOHAMMAD AHEAD, PE107/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.J.J. HANDYMAN INCGeneral Contractor207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818201/05/2026
Building Lifecycle
All (27)Filed (3)Permit Issued (3)Signed Off (1)Violation (5)Inspection (1)Objection (8)Special Inspection (6)
03/06/2026
Signed off — Alteration
HEREWITH FILING AN ALTERATION TYPE 2 APPLICATION FOR AN INTERIOR RENOVATIONON ALL FLOORS. INTERIOR RENOVATION WILL CONSIST OF PATCHING AND PAINTING WALLS. NO CHANGE TO USE, OCCUPANCYOR EGRESS.
B01248211-I1
02/04/2026
Permit issued — Mechanical Systems
B01248211-S2-MS
01/12/2026
Objection resolved — Addressed
01/06/2026
Objection raised — Cost
01/05/2026
Filed — Alteration
HEREWITH FILING AN ALTERATION TYPE 2 APPLICATION FOR AN INTERIOR RENOVATIONON ALL FLOORS. INTERIOR RENOVATION WILL CONSIST OF PATCHING AND PAINTING WALLS. NO CHANGE TO USE, OCCUPANCYOR EGRESS.
B01248211-S2
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
NORMAN LOK
12/25/2025
Special inspection requirement — Mechanical Systems
NORMAN LOK
12/25/2025
Special inspection requirement — Final
ADITYA DESAI
11/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/29/2025
Permit issued — Plumbing
B01248211-S1-PL
07/31/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
07/11/2025
Permit issued — General Construction
B01248211-I1-GC
07/10/2025
Objection raised — Other
07/10/2025
Objection raised — Zoning
07/10/2025
Objection raised — Cost
07/08/2025
Filed — Alteration
HEREWITH FILING AN ALTERATION TYPE 2 APPLICATION FOR AN INTERIOR RENOVATIONON ALL FLOORS. INTERIOR RENOVATION WILL CONSIST OF PATCHING AND PAINTING WALLS. NO CHANGE TO USE, OCCUPANCYOR EGRESS.
B01248211-I1
07/08/2025
Filed — Alteration
HEREWITH FILING AN ALTERATION TYPE 2 APPLICATION FOR AN INTERIOR RENOVATIONON ALL FLOORS. INTERIOR RENOVATION WILL CONSIST OF PATCHING AND PAINTING WALLS. NO CHANGE TO USE, OCCUPANCYOR EGRESS.
B01248211-S1
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
NORMAN LOK
06/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
06/27/2025
Special inspection requirement — Final
ADITYA DESAI
08/02/2005
Violation issued (HPD, closed)
A
08/02/2005
Violation issued (HPD, closed)
A
08/02/2005
Violation issued (HPD, closed)
A
08/02/2005
Violation issued (HPD, closed)
A
06/06/2001
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJ.J.J. HANDYMAN INC02/04/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.08/29/2025
DOB NOWGeneral ConstructionSigned-offJ.J.J. HANDYMAN INC07/11/2025
1 project · most recent 01/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/05/2026Permit IssuedJ.J.J. HANDYMAN INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MZX-5C42NA4 405,000 BTU · Vrf Outdoor ×3
MUZ-WR18NA 18,000 BTU · Split System ×1
1 project · most recent 01/05/2026
Water/Sanitary
FiledStatusContractorScope
01/05/2026Permit IssuedAMERICAN STANDARD P&H CORWater/Sanitary
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/29/2025Energy Code Compliance InspectionsNORMAN LOKprogress
12/25/2025Mechanical SystemsNORMAN LOKspecial
12/25/2025FinalADITYA DESAIprogress
07/07/2025Energy Code Compliance InspectionsNORMAN LOKprogress
06/27/2025Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
06/27/2025FinalADITYA DESAIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026B01248211-S1Request digital key ↗
08/19/2026B01248211-I1Request digital key ↗
08/19/2026B01248211-S2Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B01248211-S2Open ↗
09/23/2026B01248211-S2Open ↗
08/29/2026B01248211-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026B01248211-S1Open ↗
08/19/2026B01248211-I1Open ↗
08/19/2026B01248211-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B01248211-S2Open ↗
08/29/2026B01248211-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026B01248211-S1Open ↗
08/19/2026B01248211-S2Open ↗