Elevator co-op, conversion from loft/warehouse
43 EAST 10 STREET
MANHATTAN · Greenwich Village · BIN 1009116
💬 Discuss this project
1900Year Built
6Stories
D0Building Class
R7-2Zoning
40,061 sfGross Floor Area
51Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFE
Elevator co-op, conversion from loft/warehouse · Owner of record: 43 E 10 ST CORP · 6,593 sf lot · 6.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 9 docs
Floor 61p · 2 filings · 18 docs
Floor 5
Floor 4
Floor 34p · 2 filings · 8 docs
Floor 2Under Construction3p · 1 filing · 8 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
43 EAST 10TH STREET4609/13/2026
MELDNYC109/02/2026
43 E 10 STREET2507/08/2026
NEW FORCE CONSTRUCTION903/21/2026
MIDBORO MANAGEMENT903/21/2026
43 EAST 10 STREET603/21/2026
CO-OP BOARD PRES203/21/2026
COOPER SQUARE REALTY103/21/2026
LANDMARK MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IKRA CONSULTING LLC208/11/2026
ATELIER YL ARCHITECTURE D.P.C.105/15/2026
STUDIO FOU312/29/2025
CRAFT ENGINEERING STUDIO PLLC111/18/2024
JOEL PHAGOO P.E. PLLC205/04/2022
PCS ENGINEERING110/10/2021
ELLEN MARTIN ARCHITECT PC208/26/2021
BRIAN CAFFREY210/30/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STUDIO FOU403/21/2026
A1 EXPEDITING SERVICE403/21/2026
ARPAD BAKSA ARCHITECT, P.C.403/21/2026
PCS ENGINEERING103/21/2026
ENKAY DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YARKS NYC INCGeneral Contractor507/08/2026
SIMONSAYS CORPGeneral Contractor204/09/2026
T P HOME CARE CORPGeneral Contractor203/21/2026
OPTIMUM BUILDING RESTORATIONGeneral Contractor207/08/2026
ROBERT COLOMBOElectrical103/21/2026
SCHNABOLK, CHARLESElectrical103/21/2026
TRANSCANADAElectrical103/21/2026
24/7 QUALITY SERVICES INCGeneral Contractor109/02/2026
ICE AGE MECHANICAL CORPGeneral Contractor107/08/2026
A.M.N. CORPORATIONPlumbing107/08/2026
BORIS MECHANICAL INCPlumbing107/08/2026
CARA PLUMBING GROUP INCPlumbing106/28/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
ALEXANDER LEVINElectrical103/21/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
BENJAMIN DREBINElectrical103/21/2026
HOLNESS, GEORGEElectrical103/21/2026
RAMDATHSINGH, PURANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032108/11/2026
STUDIO FOU9001412/29/2025
CRAFT ENGINEERING STUDIO2916111/18/2024
JOEL PHAGOO ,PE, PLLC2416105/04/2022
PCS ENGINEERING3745110/10/2021
ARCHITECTURE WORK OFFICE6054208/26/2021
DOMANI INSPECTION SERVICE843110/30/2019
Building Lifecycle
All (142)Filed (14)Permit Issued (15)Signed Off (6)Facade (FISP) (12)Violation (42)Inspection (14)Objection (12)Special Inspection (27)
09/01/2026
Permit issued — General Construction
M01428991-I1-GC
08/11/2026
Filed — Alteration
RESPECTFULLY REQUEST MINOR INTERIOR RENOVATION AS PER PLANS - RELOCATED EXISTING KITCHEN SINK AND STOVE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01428991-S1
08/11/2026
Filed — Alteration
RESPECTFULLY REQUEST MINOR INTERIOR RENOVATION AS PER PLANS - RELOCATED EXISTING KITCHEN SINK AND STOVE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01428991-I1
07/10/2026
Special inspection requirement — Final
MD MOSTAFA
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
MD MOSTAFA
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD MOSTAFA
07/10/2026
Special inspection requirement — Fenestration areas
MD MOSTAFA
06/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2026
Permit issued — Plumbing
M01402434-I1-PL
05/15/2026
Filed — Alteration
M01402434-I1
04/06/2026
Signed off — Alteration
MODERATE SELECTIVE RENOVATION & PLUMBING MODIFICATIONS FOR THE INTERIOR RENOVATION IN UNIT 6G. NEW FLOOR & WILE TILING IN BATHROOM. REPLACE BATHROOM FIXTURES. RELOCATE KITCHEN/GAS RANGE. NEW WASHER & DISHWASHER, NO CHANGE IN USE, EGRESS, OCCUPANCY.
M00917309-I1
03/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2026
Signed off — Alteration
MODERATE SELECTIVE RENOVATION & PLUMBING MODIFICATIONS FOR THE INTERIOR RENOVATION IN UNIT 6G. NEW FLOOR & WILE TILING IN BATHROOM. REPLACE BATHROOM FIXTURES. RELOCATE KITCHEN/GAS RANGE. NEW WASHER & DISHWASHER, NO CHANGE IN USE, EGRESS, OCCUPANCY.
M00917307-I1
01/20/2026
Signed off — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH M00917307 + M00917309. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01115560-I1
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Farzam Yazdanseta
01/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
Farzam Yazdanseta
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Farzam Yazdanseta
12/29/2025
Filed — Alteration
MODERATE SELECTIVE RENOVATION & PLUMBING MODIFICATIONS FOR THE INTERIOR RENOVATION IN UNIT 6G. NEW FLOOR & WILE TILING IN BATHROOM. REPLACE BATHROOM FIXTURES. RELOCATE KITCHEN/GAS RANGE. NEW WASHER & DISHWASHER, NO CHANGE IN USE, EGRESS, OCCUPANCY.
M00917309-P1
12/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2025
Permit issued — Plumbing
M00917309-I1-PL
07/11/2025
Permit issued — Structural
M01115560-I1-ST
07/11/2025
Permit issued — General Construction
M00917307-I1-GC
03/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/17/2025
Objection resolved — Addressed
01/17/2025
Objection resolved — Addressed
12/04/2024
Objection raised — Mechanical
11/26/2024
Objection raised — Other
11/26/2024
Objection raised — Accessibility
11/26/2024
Objection raised — Other
11/18/2024
Filed — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH M00917307 + M00917309. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01115560-I1
11/16/2024
Filed — Alteration
MODERATE SELECTIVE RENOVATION & PLUMBING MODIFICATIONS FOR THE INTERIOR RENOVATION IN UNIT 6G. NEW FLOOR & WILE TILING IN BATHROOM. REPLACE BATHROOM FIXTURES. RELOCATE KITCHEN/GAS RANGE. NEW WASHER & DISHWASHER, NO CHANGE IN USE, EGRESS, OCCUPANCY.
M00917309-I1
11/16/2024
Filed — Alteration
MODERATE SELECTIVE RENOVATION & PLUMBING MODIFICATIONS FOR THE INTERIOR RENOVATION IN UNIT 6G. NEW FLOOR & WILE TILING IN BATHROOM. REPLACE BATHROOM FIXTURES. RELOCATE KITCHEN/GAS RANGE. NEW WASHER & DISHWASHER, NO CHANGE IN USE, EGRESS, OCCUPANCY.
M00917307-I1
09/26/2024
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
NATHANIEL STANTON
09/23/2024
Special inspection requirement — Structural Wood Frame
NATHANIEL STANTON
09/23/2024
Special inspection requirement — Preliminary
NATHANIEL STANTON
09/23/2024
Special inspection requirement — Lighting controls
Farzam Yazdanseta
09/23/2024
Special inspection requirement — Structural Steel - Details
NATHANIEL STANTON
09/23/2024
Special inspection requirement — Wood – Seismic Resistance
NATHANIEL STANTON
09/23/2024
Special inspection requirement — Final
NATHANIEL STANTON
09/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Farzam Yazdanseta
09/23/2024
Special inspection requirement — Chimneys and vents
Farzam Yazdanseta
09/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Farzam Yazdanseta
09/04/2024
Permit issued — Plumbing
M00552271-I1-PL
04/15/2024
Cycle 9 facade report signed — SAFE
01/10/2024
Cycle 9 facade report submitted
01/02/2024
Cycle 9 facade inspection completed
08/16/2023
Special inspection requirement — Lighting in dwelling units
Farzam Yazdanseta
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Farzam Yazdanseta
08/16/2023
Special inspection requirement — Final
Farzam Yazdanseta
01/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/06/2022
Permit issued — General Construction
M00592506-I1-GC
07/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit Issued24/7 QUALITY SERVICES INC09/01/2026
DOB NOWPlumbingSigned-offCARA PLUMBING GROUP INC06/22/2026
DOB NOWPlumbingSigned-offA.M.N. CORPORATION08/19/2025
DOB NOWStructuralSigned-offSIMONSAYS CORP07/11/2025
DOB NOWGeneral ConstructionSigned-offSIMONSAYS CORP07/11/2025
DOB NOWPlumbingSigned-offBORIS MECHANICAL INC09/04/2024
DOB NOWGeneral ConstructionPermit IssuedOPTIMUM BUILDING RESTORAT10/06/2022
DOB NOWSupported ScaffoldPermit IssuedYARKS NYC INC05/04/2022
DOB NOWGeneral ConstructionPermit IssuedOPTIMUM BUILDING RESTORAT03/08/2022
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC02/22/2022
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP12/09/2021
DOB NOWGeneral ConstructionSigned-offT P HOME CARE CORP10/05/2021
DOB NOWSidewalk ShedPermit IssuedYARKS NYC INC10/05/2021
DOB NOWMechanical SystemsSigned-offICE AGE MECHANICAL CORP12/20/2019
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC10/31/2019
BISOTISSUEDLB GENERAL CONTRACTING CO10/31/2019
BISOTISSUEDNEW FORCE CONSTRUCTION CORP04/26/2018
BISPLISSUEDFLINT MECHANICAL CORP03/20/2018
BISOTISSUEDMALCON CONSTRUCTION CORP01/10/2018
BISOTISSUEDNEW FORCE CONSTRUCTION CORP12/18/2017
BISPLISSUEDGANIC PLUMBING & HTG INC10/05/2017
BISBLISSUEDAMERICAN BOILER & WELDING09/19/2017
BISOTISSUEDROMANOV INC09/15/2017
BISOTISSUEDROMANOV INC09/15/2017
BISBLISSUEDAMERICAN BOILER & WELDING08/04/2017
BISPLISSUEDDUAL FUEL PLUBING & HTING07/24/2017
BISMHISSUEDDUAL FUEL COMPANY LLC07/24/2017
BISMHISSUEDCOLVENT INC07/17/2017
BISOTISSUEDNEW FORCE CONSTRUCTION CORP05/24/2017
BISOTISSUEDDAVID M CONSTRUCTION CO04/20/2016
BISOTISSUEDNEW FORCE CONSTRUCTION CORP11/13/2015
BISEQISSUEDNEW FORCE CONSTRUCTION CORP10/30/2015
BISPLISSUEDDC BUILDING SERVICES INC01/12/2015
BISOTISSUEDDAVID M CONSTRUCTION CO11/26/2014
BISEQISSUEDNEW FORCE CONSTRUCTION CORP03/13/2012
BISEQISSUEDNEW FORCE CONSTRUCTION CORP03/13/2012
BISSPISSUEDAMOK INC12/23/2010
BISPLISSUEDAMOK INC12/23/2010
BISPLISSUEDAMOK INC11/19/2010
BISOTISSUEDQUEDAN CONSTRUCTION SERVICES11/15/2010
+ 21 more permits on file
3 projects · most recent 08/11/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/11/2026——Water/Sanitary
05/15/2026Signed-offCARA PLUMBING GROUP INCGas, Water/Sanitary
08/26/2021Signed-offBORIS MECHANICAL INCGas, Water/Sanitary
6 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteA.L. ELECTRICAL CORP.General Wiring
09/28/2021Permit IssuedRICHARD NEU—
03/01/2021Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
11/07/2019CompleteDENMAR ELECTRIC CORPGeneral Wiring
07/02/2018Permit IssuedVALLEY ELECTRIC OF NY INC55 meters, 1 new_meters
04/03/2018CompleteQEC ELECTRICAL SVCE CORPGeneral Wiring
1 project · most recent 05/04/2022
Scaffold
FiledStatusContractorScope
05/04/2022Permit IssuedYARKS NYC INCScaffold
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
06/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/10/2026FinalMD MOSTAFAprogress
07/10/2026Energy Code Compliance InspectionsMD MOSTAFAprogress
07/10/2026Fire-Resistant Penetrations and JointsMD MOSTAFAspecial
07/10/2026Fenestration areasMD MOSTAFAenergy_progress
01/20/2026Fire-Resistant Penetrations and JointsFarzam Yazdansetaspecial
01/20/2026Tenant Protection Plan ComplianceFarzam Yazdansetaspecial
01/20/2026Energy Code Compliance InspectionsFarzam Yazdansetaprogress
09/26/2024Construction Utilizing CLT or SCL, Type IVNATHANIEL STANTONspecial
09/23/2024Structural Wood FrameNATHANIEL STANTONprogress
09/23/2024PreliminaryNATHANIEL STANTONprogress
09/23/2024Lighting controlsFarzam Yazdansetaenergy_progress
09/23/2024Structural Steel - DetailsNATHANIEL STANTONspecial
09/23/2024Wood – Seismic ResistanceNATHANIEL STANTONspecial
09/23/2024FinalNATHANIEL STANTONprogress
09/23/2024Fire-Resistance Rated ConstructionFarzam Yazdansetaprogress
09/23/2024Chimneys and ventsFarzam Yazdansetaspecial
09/23/2024Fire-Resistant Penetrations and JointsFarzam Yazdansetaspecial
08/16/2023Lighting in dwelling unitsFarzam Yazdansetaenergy_progress
08/16/2023Energy Code Compliance InspectionsFarzam Yazdansetaprogress
08/16/2023FinalFarzam Yazdansetaprogress
05/03/2022Post-installed AnchorsJOEL PHAGOOspecial
10/05/2021MasonryMichael Walshspecial
09/13/2021FinalMichael Walshprogress
08/20/2019HVAC and service water heating equipment BRIAN CAFFREYenergy_progress
08/20/2019Mechanical SystemsSTEPHEN WOODCHEKEspecial
Latest 25 of 27.
▾Documents — 338 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/03/2026M00552270-I1Request digital key ↗
09/03/2026M00596358-I1Request digital key ↗
09/03/2026M00592506-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00213500-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00213541-I1Request digital key ↗
▸Applications & Permits56
▸BISWORK PERMIT APPLICATION30
10/31/2019123901643Open ↗
04/25/2018140758142Open ↗
03/23/2018123337914Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION26
07/26/2023103176634Open ↗
02/15/2023103176634Open ↗
08/03/2021123337914Open ↗
Showing 3 of 26 on file for this type
▸Seals & Professional Certifications108
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
02/12/2020123901643Open ↗
02/12/2020123901643Open ↗
02/12/2020123901643Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026M00213500-I1Open ↗
09/01/2026M00213500-I1Open ↗
09/01/2026M00213500-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026M00552270-I1Open ↗
09/03/2026M00596358-I1Open ↗
09/03/2026M00592506-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026M00213500-I1Open ↗
08/31/2026M00592506-I1Open ↗
08/27/2026M01115560-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
10/29/2019123901643Open ↗
08/28/2017123082145Open ↗
04/21/2016122764696Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
10/29/2019123901643Open ↗
04/25/2018140758142Open ↗
08/28/2017123082145Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/25/2018140758142Open ↗
07/14/2017140668212Open ↗
05/22/2017140645951Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/25/2018140758142Open ↗
07/14/2017140668212Open ↗
05/22/2017140645951Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/13/2012121004402Open ↗
▸Trade Schedules & Equipment19
▸BISSELF-CERT PLUMBING NOTICE5
01/23/2015122130764Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
09/15/2017123337914Open ↗
08/28/2017123082145Open ↗
06/02/2017121240825Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS3
05/31/2018140668212Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
05/31/2018140668212Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/01/2017121240825Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes8
10/29/2019123901643Open ↗
09/15/2017123337914Open ↗
08/28/2017123082145Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00213500-I1Open ↗
08/13/2026M00213541-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/21/2016122764696Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
10/31/2019123901643Open ↗
09/15/2017123337914Open ↗
08/28/2017123082145Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00552270-I1Open ↗
09/03/2026M00592506-I1Open ↗
08/16/2026M01428991-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
03/13/2012121004402Open ↗
03/13/2012121004402Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026M00917309-I1Open ↗
08/25/2026M01115560-I1Open ↗
08/13/2026M00917307-I1Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
02/12/2020123901643Open ↗
02/12/2020123901643Open ↗
10/09/2018121240825Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
08/02/2021123337914Open ↗
02/12/2020123901643Open ↗
10/09/2018121240825Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/14/2021123337914Open ↗
07/14/2017140668212Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00552271-I1Open ↗
08/13/2026M00552270-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/14/2017140668212Open ↗
▸BISNYCECC ANALYSIS1
07/14/2017140668212Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/14/2021123337914Open ↗
07/14/2021123337914Open ↗
04/25/2018140758142Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
08/02/2021123337914Open ↗
02/12/2020123901643Open ↗
10/09/2018121240825Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
03/13/2012121005287Open ↗
Showing 1 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/09/2018121240825Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT23
08/02/2021123337914Open ↗
02/12/2020123901643Open ↗
10/29/2019123901643Open ↗
Showing 3 of 23 on file for this type
▸Filing & Intake Forms33
▸BISEFILING COVER SHEET17
10/29/2019123901643Open ↗
09/15/2017123337914Open ↗
08/28/2017123082145Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM8
02/12/2020123901643Open ↗
10/09/2018121240825Open ↗
10/02/2018121240825Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
10/09/2018121240825Open ↗
06/07/2018123082145Open ↗
12/21/2017121240825Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/25/2018140758142Open ↗
07/14/2017140668212Open ↗
05/22/2017140645951Open ↗