← Back
Other miscellaneous
43 WEST STREET
BROOKLYN · BIN 3416853
💬 Discuss this project
1930Year Built
1Stories
Z9Building Class
R6Zoning
1,500 sfGross Floor Area
0Units
8 Open Violations 0 unresolved · 8 paperwork only ▸FDNY Report ↗
Other miscellaneous · Owner of record: 2 NOBLE NORTH LLC · 299,214 sf lot · 0.01 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof3p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 134p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Floor 11
Floor 10
Floor 91p · 1 filing · 20 docs
Floor 83p · 1 filing · 20 docs
Floor 72p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 4
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
3 jobs · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteS. J. ELECTRIC INC.—
06/07/2024CompleteZEV ELECTRIC CORP.—
05/22/2024Permit IssuedZEV ELECTRIC CORP.General Wiring
Building Lifecycle
All (86)Filed (15)Permit Issued (11)Signed Off (6)Violation (6)Objection (26)Special Inspection (19)Tax Incentive (3)
09/30/2031
485-x construction completed
10/01/2026
485-x construction commenced
03/06/2026
485-x registration filed
02/09/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01225391-I1
02/09/2026
Signed off — Alteration
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. SUPPORTED SCAFFOLD FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01226457-I1
12/04/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214889-I1
12/03/2025
Signed off — Full Demolition
mechanical equipment will assist during demolition
B01199951-I1
10/16/2025
Permit issued — Full Demolition
B01199951-I1-FD
10/07/2025
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE ANDERSEN
10/07/2025
Special inspection requirement — Structural Steel - Details
GEORGE ANDERSEN
10/07/2025
Special inspection requirement — Post-installed Anchors
GREG BLINN
09/29/2025
Permit issued — Protection and Mechanical Methods
B01226457-I1-PMM
09/26/2025
Permit issued — Supported Scaffold
B01225391-I1-SF
09/17/2025
Objection resolved — Addressed
09/12/2025
Objection raised — Other
08/27/2025
Filed — Alteration
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. SUPPORTED SCAFFOLD FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01226457-P1
08/27/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01225391-P1
08/27/2025
Special inspection requirement — Post-installed Anchors
GREG BLINN
08/07/2025
Permit issued — Full Demolition
B01199951-I1-FD
08/07/2025
Permit issued — Protection and Mechanical Methods
B01199951-S1-PMM
07/17/2025
Permit issued — Construction Fence
B01214889-I1-FN
07/08/2025
Permit issued — Supported Scaffold
B01225391-I1-SF
07/08/2025
Permit issued — Protection and Mechanical Methods
B01226457-I1-PMM
06/26/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE ANDERSEN
06/26/2025
Special inspection requirement — Demolition
GEORGE ANDERSEN
06/18/2025
Objection resolved — Addressed
06/18/2025
Objection resolved — Addressed
06/11/2025
Filed — Full Demolition
mechanical equipment will assist during demolition
B01199951-P1
06/10/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE ANDERSEN
06/10/2025
Special inspection requirement — Demolition
GEORGE ANDERSEN
05/28/2025
Objection raised — Other
05/28/2025
Objection raised — Other
05/16/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214889-I1
05/15/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01225391-I1
05/15/2025
Filed — Alteration
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. SUPPORTED SCAFFOLD FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01226457-I1
05/07/2025
Objection resolved — Addressed
04/14/2025
Objection resolved — Addressed
04/11/2025
Objection raised — Other
04/08/2025
Objection raised — Admin
03/28/2025
Filed — Full Demolition
mechanical equipment will assist during demolition
B01199951-S1
03/25/2025
Filed — Full Demolition
mechanical equipment will assist during demolition
B01199951-I1
01/15/2025
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Violation issued (ECB, closed)
Construction
04/11/2024
Signed off — Alteration
Installation of temp tents, platforms, scenic and prod. equip., no alt to exist structures for Afropunk. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete.
B00917080-I1
10/11/2023
Violation issued (ECB, closed)
Construction
10/11/2023
Violation issued (ECB, closed)
Construction
08/21/2023
Filed — No Work
B00917089-I1
08/18/2023
Permit issued — General Construction
B00917080-I1-GC
08/14/2023
Filed — Alteration
Installation of temp tents, platforms, scenic and prod. equip., no alt to exist structures for Afropunk. TPA required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete.
B00917080-I1
08/09/2023
Special inspection requirement — Final
DANNY TRUJILLO
12/27/2022
Signed off — Alteration
Temporary structures for a fashion show. Removed at the end of the programing. No changes to existing structures, use or egress.
B07998887-I1
12/21/2022
Objection raised — Inspections
12/21/2022
Objection resolved — Addressed
12/21/2022
Special inspection requirement — Sprayed fire-resistant materials
12/21/2022
Special inspection requirement — Insulation placement and R values
12/21/2022
Special inspection requirement — Masonry
12/21/2022
Special inspection requirement — Post-installed Anchors
12/21/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Latest 60 of 86 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
57 WEST1503/22/2026
2 NOBLE NORTH LLC C/O TF103/22/2026
BROOKLYN103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/31/2024$144.1M—57 WEST LLC → 2 NOBLE NORTH LLC$96,067/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING INC603/21/2026
EXPEDITE DEM603/21/2026
MUNICIPAL BUILDING CONSULTANTS303/21/2026
JAM CONSULTANTS, INC.1403/21/2026
A1 EXPEDITING SERVICE803/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E BRIDGE & SCAFFOLD LLC.General Contractor404/09/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor404/09/2026
WINICK PRODUCTIONS, LLCGeneral Contractor403/21/2026
ZEV ELECTRIC CORP.Electrical103/22/2026
LNM CONSTRUCTION LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLE TECHNOLOGIES/CONTROL1290408/27/2025
G. BLINN CONSULTING, LLC2894408/27/2025
RICHARD H. BALSER ENGINEE3028109/06/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offTITAN INDUSTRIAL SVC CORP10/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC09/29/2025
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/26/2025
DOB NOWFull DemolitionSigned-offTITAN INDUSTRIAL SVC CORP08/07/2025
DOB NOWProtection and Mechanical MethodsSigned-offTITAN INDUSTRIAL SVC CORP08/07/2025
DOB NOWConstruction FenceSigned-offTITAN INDUSTRIAL SVC CORP07/17/2025
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC07/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC07/08/2025
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC08/18/2023
DOB NOWGeneral ConstructionSigned-offWINICK PRODUCTIONS, LLC09/13/2022
DOB NOWConstruction FencePermit IssuedLNM CONSTRUCTION LLC09/20/2019
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/07/2025Structural Steel - High Strength BoltingGEORGE ANDERSENspecial
10/07/2025Structural Steel - DetailsGEORGE ANDERSENspecial
10/07/2025Post-installed AnchorsGREG BLINNspecial
08/27/2025Post-installed AnchorsGREG BLINNspecial
06/26/2025Structural Stability – Alterations of existing BuildingsGEORGE ANDERSENspecial
06/26/2025DemolitionGEORGE ANDERSENspecial
06/10/2025Structural Stability – Alterations of existing BuildingsGEORGE ANDERSENspecial
06/10/2025DemolitionGEORGE ANDERSENspecial
08/09/2023FinalDANNY TRUJILLOprogress
12/21/2022Sprayed fire-resistant materials—special
12/21/2022Insulation placement and R values—energy_progress
12/21/2022Masonry—special
12/21/2022Post-installed Anchors—special
12/21/2022Structural Stability – Alterations of existing buildings—special
12/21/2022Energy Code Compliance Inspections—progress
09/06/2022Structural Steel - DetailsBalser Richardspecial
09/06/2022FinalANDY ENGLER ROTHprogress
06/20/2022Final—progress
06/20/2022Concrete - Cast-In-Place—special
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
08/28/2026B07998887-I1Request digital key ↗
08/27/2026B00917080-I1Request digital key ↗
08/22/2026B01199951-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00223272-I1Request digital key ↗
09/02/2026B00229969-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/28/2026B07998709-I1Request digital key ↗
08/27/2026B00917089-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
12/12/2022340873923Open ↗
12/19/2018322065251Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/29/2026B00760868-I1Open ↗
08/28/2026B07998887-I1Open ↗
08/28/2026B07998709-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026B01199951-I1Open ↗
08/30/2026B01199951-I1Open ↗
08/27/2026B07998887-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B07998887-I1Open ↗
08/24/2026B00917080-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/12/2022340873923Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/12/2022340873923Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/19/2018322065251Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/19/2018322065251Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01199951-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01199951-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01199951-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01199951-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026B01199951-P1Open ↗
08/15/2026B01199951-I1Open ↗
08/14/2026B00760868-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00229969-I1Open ↗
08/13/2026B00223272-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
12/12/2022340873923Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/12/2022340873923Open ↗
▸DOB NOWRodent Control1
08/13/2026B01199951-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/12/2022340873923Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/19/2018322065251Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/30/2019322065251Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/12/2022340873923Open ↗
12/19/2018322065251Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
12/19/2018322065251Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/12/2022340873923Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B01199951-I1Open ↗
▸Other Documents7
▸DOB NOWStructure Photographs2
08/13/2026B01199951-I1Open ↗
08/13/2026B01199951-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026B01199951-P1Open ↗
08/15/2026B01199951-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01199951-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B00760868-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01199951-I1Open ↗