Roof1p · 3 filings · 6 docs
ArchitectureElectricalStructural
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF TEMPORARY ROOF PROTECTION AT THE ADJACENT PROPERTY. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
1 document · 1 drawing sheet
USE OF BUILDING MAINTENANCE UNIT FOR EXTERIOR BUILDING MAINTENANCE.
On file for this project
2 documents
INSTALLATION OF SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS DURING N.B CONSTRUCTION FILED SEPARATELY. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 421 filing · 2 docs
ElectricalEquipmentStructural
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF A TEMPORARY SCAFFOLD @ 41st FLOOR AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
Floor 416p · 13 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
PLUMBING MODIFICATIONS ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents
SPRINKLER MODIFICATIONS ON THE 41ST FLOOR CONSTRUCTION (47TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
INSTALLATION OF PRE-ACTION SPRINKLER SYSTEM ON THE 41ST CONSTRUCTION FLOOR (47TH MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents
Latest 3 of 13 filings on this floor.
Floor 401p · 9 filings · 20 docs
ElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
MECHANICAL WORK ON THE 40TH AND 41ST CONSTRUCTION FLOORS (46TH AND 47TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
17 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 40TH FLOOR CONSTRUCTION (46TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON THE 39TH, 40TH FLOOR CONSTRUCTION (45TH, 46TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents
Latest 3 of 9 filings on this floor.
Floor 3961p · 6 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
PLUMBING MODIFICATIONS TAKING PLACE ON THE 39TH, 40TH FLOOR CONSTRUCTION (45TH, 46TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
16 documents · 59 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 39TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents
Latest 3 of 6 filings on this floor.
Floor 3813p · 13 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
MECHANICAL WORK TAKING PLACE ON THE 32 CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 13 filings on this floor.
Floor 3713p · 10 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 37TH CONSTRUCTION FLOOR (43RD MARKETING FLOOR) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
PLUMBING MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR (37TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR (37TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 3623p · 13 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
PLUMBING MODIFICATIONS TAKING PLACE ON THE 35TH AND 36TH FLOOR (41ST AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 35TH FLOOR AND 36TH FLOOR (41ST AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Mechanical modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
26 documents · 3 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 3513p · 6 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
PLUMBING MODIFICATIONS TAKING PLACE ON THE 35TH AND 36TH FLOOR (41ST AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 35TH FLOOR AND 36TH FLOOR (41ST AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Mechanical modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
26 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 347p · 9 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers
MECHANICAL WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
GENERAL CONSTRUCTION TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents
PLUMBING WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 9 filings on this floor.
Floor 3317p · 8 filings · 20 docs
ArchitectureElectricalEquipmentFire AlarmFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers
MECHANICAL WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
GENERAL CONSTRUCTION TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 8 drawing sheets
PLUMBING WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 32Under Construction6p · 15 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
PLUMBING WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON THE 32ND FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 15 filings on this floor.
Floor 3110p · 8 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
PLUMBING MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR (37TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 31ST FLOOR (37TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Structural modifications taking place on the 31st floor (37th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 8 filings on this floor.
Floor 302p · 7 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
General construction modifications taking place on the 30th floor (36th marketing) as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
Mechanical systems modifications taking place on the 30th floor (36th marketing) as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents
Structural modifications taking place on the 30th floor (36th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents
Latest 3 of 7 filings on this floor.
Floor 2914p · 10 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
22 documents · 3 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents · 5 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 2821p · 18 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
PLUMBING MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 28TH CONSTRUCTION FLOOR (34TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
Latest 3 of 18 filings on this floor.
Floor 275p · 11 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers
MECHANICAL WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
GENERAL CONSTRUCTION TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents
PLUMBING WORK TAKING PLACE ON THE 27TH, 33RD, AND 34TH CONSTRUCTION FLOORS (33RD, 39TH, AND 40TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 11 filings on this floor.
Floor 261p · 5 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
PLUMBING MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 26TH FLOOR CONSTRUCTION (32ND FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 5 filings on this floor.
Floor 255p · 8 filings · 19 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Application filed on the 24th and 25th floors (30st and 31st Marketing floors) to obtain Equipment Certificate of compliance as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 18TH FLOOR CONSTRUCTION (24TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Sprinkler modifications taking place on the 24th and 25th floors (30st and 31st Marketing floors) as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 8 filings on this floor.
Floor 247p · 11 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
SPRINKLER WORK TAKING PLACE ON THE 32ND CONSTRUCTION FLOOR (38TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
SPRINKLER WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Application filed on the 24th and 25th floors (30st and 31st Marketing floors) to obtain Equipment Certificate of compliance as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents
Latest 3 of 11 filings on this floor.
Floor 238p · 9 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
22 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR CONSTRUCTION (29TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
33 documents · 6 drawing sheets
INSTALLATION OF A TEMPORARY SPRINKLER SYSTEM FOR PROTECTION OF EGRESS ON THE 23RD CONSTRUCTION FLOOR (29TH MARKETING FLOOR) AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 9 filings on this floor.
Floor 222p · 6 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
11 documents
PLUMBING MODIFICATIONS TAKING PLACE ON THE 22ND CONSTRUCTION FLOOR (28TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 6 filings on this floor.
Floor 211p · 3 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 21ST AND 22ND FLOORS CONSTRUCTION (27TH AND 28TH FLOORS MARKETING) AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents
Mechanical work taking place on the 20th and 21st floors (26th and 27th floors marketing) as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Structural work taking place on the 20th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Floor 201p · 7 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Mechanical work taking place on the 20th and 21st floors (26th and 27th floors marketing) as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Structural work taking place on the 20th floors per plans filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents
Sprinkler work as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 7 filings on this floor.
Floor 1919p · 6 filings · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
STANDPIPE WORK ON THE 3RD FL , 18TH AND 19TH FLOOR CONSTRUCTION (8TH, 24TH AND 25TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
13 documents · 19 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 19TH FLOOR CONSTRUCTION (25TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
Latest 3 of 6 filings on this floor.
Floor 1827p · 7 filings · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
GENERAL CONSTRUCTION ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
26 documents · 26 drawing sheets
STANDPIPE WORK ON THE 3RD FL , 18TH AND 19TH FLOOR CONSTRUCTION (8TH, 24TH AND 25TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
MECHANICAL WORK ON THE 18TH FL CONSTRUCTION (24TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
27 documents
Latest 3 of 7 filings on this floor.
Floor 171p · 1 filing · 4 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 11TH CONSTRUCTION FLOOR (17TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 16
Floor 1512p · 4 filings · 18 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR CONSTRUCTION (21ST FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 10 drawing sheets
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 15TH FLOOR CONSTRUCTION (21ST FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
PLUMBING WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 14
Floor 13
Floor 12
Floor 112 filings · 8 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 11TH CONSTRUCTION FLOOR (17TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 11TH CONSTRUCTION FLOOR (17TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Floor 101 filing · 4 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
GENERAL CONSTRUCTION WORK TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Floor 91p · 4 filings · 18 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
SPRINKLER WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
PLUMBING WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
Latest 3 of 4 filings on this floor.
Floor 83p · 6 filings · 18 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPRINKLER WORK ON THE 3RD FL CONSTRUCTION (8TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 2 drawing sheets
SPRINKLER WORK ON THE 7TH-9TH FLOOR CONSTRUCTION (12, 14, 15 FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 8TH FLOOR CONSTRUCTION (14TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 76p · 11 filings · 18 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Supported Scaffold
PLUMBING MODIFICATIONS TAKING PLACE ON THE 6TH AND 7TH FLOORS CONSTRUCTION (11TH & 12TH FLOORS MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR CONSTRUCTION (12TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR CONSTRUCTION (12TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 610p · 9 filings · 18 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR CONSTRUCTION (11TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
PLUMBING MODIFICATIONS TAKING PLACE ON THE 6TH AND 7TH FLOORS CONSTRUCTION (11TH & 12TH FLOORS MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 6TH CONSTRUCTION FLOOR (11TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 52p · 4 filings · 18 docs
ElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPRINKLER WORK ON THE 4TH-6TH FL CONSTRUCTION (9-11FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
23 documents
MECHANICAL WORK FROM THE 3RD-6TH FLOOR CONSTRUCTION (8-11 FLOOR MARKETING) NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
23 documents
PLUMBING WORK ON THE 3RD-6TH FL CONSTRUCTION (8TH-11TH FL MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
15 documents
Latest 3 of 4 filings on this floor.
Floor 4Under Construction2p · 7 filings · 18 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 4TH CONSTRUCTION FLOOR (9TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 314p · 13 filings · 18 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD CONSTRUCTION FLOOR (8TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 3RD CONSTRUCTION FLOOR (8TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 2Under Construction10p · 9 filings · 18 docs
ArchitectureCivilDMElectricalEquipmentFire AlarmFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
STRUCTURAL MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 3 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE IN THE CELLAR, 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
SPRINKLER MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 1Under Construction19p · 14 filings · 18 docs
ArchitectureCivilDMElectricalEquipmentFire AlarmFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
STRUCTURAL MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE IN THE CELLAR, 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 14 filings on this floor.
Mezzanine3p · 3 filings · 16 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
GENERAL CONSTRUCTION ON THE CEL (MARKETING B1), MEZZ 2, GROUND, 2ND FLOOR AND 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
MECHANICAL WORK IN THE CELLAR (B1 MARKETING), GROUND FLOOR, MEZZANINE 2, 2ND FLOOR AND 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
STRUCTURAL WORK IN THE CELLAR (B1 MARKETING), GROUND FLOOR, MEZZANINE 2, 2ND FLOOR AND 3RD FLOOR CONSTRUCTION (8TH FLOOR MARKETING) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
CellarUnder Construction9p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
STRUCTURAL MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents
PLUMBING MODIFICATIONS TAKING PLACE IN THE CELLAR, 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
SPRINKLER MODIFICATIONS TAKING PLACE IN THE CELLAR AND ON THE 1ST AND 2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Site & exteriorUnder Construction9 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE WORK PLATFORM IS ON THE 1ST AND 2ND FLOORS INSIDE THE BUILDING.
On file for this project
3 documents · 7 drawing sheets
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE INSTALLED ON ROADWAY. DOT PERMITS BY OTHERS.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Filed — no permit issued11 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 10 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING FLOOR) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
3 documents · 4 drawing sheets
Latest 3 of 11 filings on this floor.