← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
44 EAST 67TH STREET
MANHATTAN · BIN 1076286
💬 Discuss this project
1941Year Built
13Stories
RMBuilding Class
R8BZoning
60,242 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized76 Active Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 8,033 sf lot · 7.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade Repair ProjectUnder Construction4p · 3 filings · 20 docs
PenthouseUnit PHA, Unit PHCUnder Construction19p · 3 filings · 20 docs
Floor 13Under Construction9p · 2 filings · 20 docs
Floor 12Unit 12C17p · 3 filings · 20 docs
Floor 11Unit 11C, Unit 11D, Unit 11E31p · 5 filings · 20 docs
Floor 10Under Construction31p · 2 filings · 20 docs
Floor 9Unit 9A, Unit 9D, Unit 9E +1Under Construction30p · 3 filings · 20 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Install two thru wall AC units2p · 2 filings · 10 docs
Floor 3Unit 3A, Unit 3CUnder Construction20p · 2 filings · 20 docs
Floor 2Unit 2E2p · 1 filing · 4 docs
Floor 1
CellarCellar Tenant Laundry Installation2p · 1 filing · 7 docs
Basement1p · 1 filing · 20 docs
Site & exteriorFacade Repair Project19p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
44 East 67 St Condominium3403/21/2026
Walter & Samuels803/21/2026
Harley 67th Street Group403/21/2026
Dmna-Mnfe310/04/2026
44 East 67th Street303/21/2026
Madison-Park 67 Associates by Jamp203/21/2026
44 E 67 Street Condo103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rodriguezarchstudio209/23/2026
RJD Engineering509/08/2026
John B Murray Architect309/08/2026
Churchward Architecture506/02/2026
Inm Architects110/26/2025
Mirella Boselli Architect105/20/2025
FGS Design803/20/2025
Anjie Cho Architect412/02/2024
Hage Engineering208/09/2024
Joseph K. Blum Co111/03/2023
Ida Galea, Architect309/26/2023
GT Consulting Engineers109/25/2023
Ashraf207/19/2023
Stone106/20/2023
Moore101/26/2023
Robin Edward Bernstein, Architect302/25/2022
Arpaia Associates108/27/2020
Associates107/29/2020
Piro Studio112/06/2019
Shahrish Shuvo Engineering112/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Code403/21/2026
Richard Lewis Architect103/21/2026
J Callahan Consulting1403/21/2026
Building Violation Solutions2003/21/2026
Rigid Structural Design203/21/2026
Stone203/21/2026
Clarke Construction Consultants303/21/2026
Richard Kreshtool Architect203/21/2026
Agouti Construction Consulting103/21/2026
Kirschenbaum Arriaga203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
South Pacific GeneralGeneral Contractor2707/08/2026
Wynne Plumbing & HeatingPlumbing507/08/2026
Kanaris ContractingGeneral Contractor407/08/2026
Pna ContractingGeneral Contractor307/08/2026
LCS Restorationspecialty_contractor303/21/2026
Steel SystemsScaffold303/21/2026
Reyes EnterpriseGeneral Contractor207/08/2026
United Elite GroupGeneral Contractor203/21/2026
M&M Plumbing & HeatingPlumbing207/08/2026
NU-Way Heating & Coolingspecialty_contractor203/21/2026
City Gas Heating Service CoPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Shaw MechanicalPlumbing110/04/2026
Accurate ElectricalElectrical103/21/2026
Zerega ContractingPlumbing110/04/2026
Jeco Electrical ServiceElectrical103/21/2026
RHR Electric CoElectrical103/21/2026
Principal ElectricalElectrical103/22/2026
Clearcut GroupGeneral Contractor107/08/2026
Dutchess Cabinets of NY *specialty_contractor104/09/2026
Link RenovationGeneral Contractor108/07/2026
LRL ConstructionGeneral Contractor107/08/2026
Alan E. RosenbergPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEP Inspections1102509/08/2026
SH Projects4144204/09/2026
Inm Architect3351110/26/2025
Crosscheck Inspection Services544803/20/2025
Anjie Cho Architect3954210/07/2024
Vincent J. Liotta P. E1974210/07/2024
Chen Engineering Services1826104/29/2024
Joseph K. Blum Co1741111/03/2023
Domani Inspection Service843111/01/2023
Ida Galea, Architect838207/28/2023
Metric Consulting and Ins1803106/20/2023
Stone Engineering & Architects1362106/20/2023
Moore Associates3408101/26/2023
Building Consulting Engineering1034101/26/2023
Esnyc Consulting4099302/25/2022
Robin Edward Bernstein, A5035201/26/2022
Carusone & Cherres Architects6166107/29/2020
Maasarani Engineering6458112/06/2019
Shahrish Consulting5702112/03/2019
Building Lifecycle
All (300)Filed (48)Permit Issued (39)Signed Off (19)Facade (FISP) (9)Violation (58)Inspection (17)Objection (80)Special Inspection (30)
10/16/2026
Signed off — Alteration
Architectural modifications to unit 11D. Demolition and installation of interior, non-loadbearing partitions and related finishes. No Changes to use, egress or occupancy.
M00513192-S2
10/13/2026
Signed off — Alteration
Architectural modifications to unit 11D. Demolition and installation of interior, non-loadbearing partitions and related finishes. No Changes to use, egress or occupancy.
M00513192-S1
10/01/2026
Signed off — Alteration
Architectural modifications to unit 11D. Demolition and installation of interior, non-loadbearing partitions and related finishes. No Changes to use, egress or occupancy.
M00513192-I1
09/28/2026
Permit issued — Plumbing
M01437590-S1-PL
09/28/2026
Permit issued — Plumbing
M01437590-S1-PL
09/23/2026
Filed — Alteration
Renovation of an existing duplex apartment. Work includes new kitchen, bathrooms finishes and fixtures,
M01437590-S1
09/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/15/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL RODRIGUEZ
09/08/2026
Filed — Alteration
Installation of (1) 5-ton AC unit. No change to use, occupancy or egress.
M00956641-P1
09/08/2026
Filed — Alteration
Combination and Renovation of two existing apartments. Window and door replacement proposed. Lower sills of three windows and combine two existing windows into one bay window. There will be no change to use, occupancy and egress.
M00956626-P2
09/08/2026
Filed — Alteration
Plumbing work proposed for an existing penthouse. No change to use, occupancy or egress.
M00956651-P1
09/01/2026
Special inspection requirement — Final
Nicolas Crosetto
09/01/2026
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
09/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
09/01/2026
Special inspection requirement — Final
Robert Divilio
08/06/2026
Permit issued — General Construction
M01437590-I1-GC
07/31/2026
Filed — Alteration
Renovation of an existing duplex apartment. Work includes new kitchen, bathrooms finishes and fixtures,
M01437590-I1
07/28/2026
Special inspection requirement — Final
MICHAEL RODRIGUEZ
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL RODRIGUEZ
06/02/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-S2
05/22/2026
Special inspection requirement — Final
Ryan Churchward
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID HOFMANN
05/22/2026
Special inspection requirement — Post-installed Anchors
DAVID HOFMANN
05/06/2026
Violation issued (HPD, open)
B
05/06/2026
Violation issued (HPD, closed)
C
05/06/2026
Violation issued (HPD, open)
B
04/09/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-P1
04/09/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-P2
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID HOFMANN
03/19/2026
Special inspection requirement — Final
Ryan Churchward
03/19/2026
Special inspection requirement — Post-installed Anchors
DAVID HOFMANN
02/11/2026
Signed off — Alteration
THE PROPOSED SCOPE OF WORK IS FOR FLOOR REPLACEMENT AT THE 11D & 11E TERRACES ONLY. NO INTERIOR WORK OR CHANGE IN OCCUPANCY, USE OR EGRESS.
M01280066-I1
01/21/2026
Permit issued — Plumbing
M01264447-S1-PL
01/12/2026
Permit issued — General Construction
M01264447-I1-GC
01/06/2026
Permit issued — General Construction
M01280066-I1-GC
12/01/2025
Permit issued — Mechanical Systems
M00956641-I1-MS
12/01/2025
Permit issued — General Construction
M00956626-I1-GC
12/01/2025
Permit issued — Structural
M01002757-I1-ST
11/21/2025
Signed off — Alteration
Plumbing Modifications to unit 11D as indicated on the plans. No change to use, egress or occupancy.
M00513164-I1
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/10/2025
Objection raised — Admin
11/10/2025
Objection raised — Scope
11/10/2025
Objection raised — Admin
11/10/2025
Objection raised — Cost
10/26/2025
Filed — Alteration
THE PROPOSED SCOPE OF WORK IS FOR FLOOR REPLACEMENT AT THE 11D & 11E TERRACES ONLY. NO INTERIOR WORK OR CHANGE IN OCCUPANCY, USE OR EGRESS.
M01280066-I1
10/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nikola Martinovic
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Nikola Martinovic
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
10/24/2025
Special inspection requirement — Insulation placement and R values
Nikola Martinovic
10/24/2025
Special inspection requirement — Final
Nikola Martinovic
09/17/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-S1
09/17/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01264447-I1
09/11/2025
Special inspection requirement — Final
Nicolas Crosetto
09/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nicolas Crosetto
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
09/05/2025
Objection raised — Admin
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedZerega Contracting09/28/2026
DOB NOWPlumbingPermit IssuedShaw Mechanical09/28/2026
DOB NOWGeneral ConstructionPermit IssuedLink Renovation08/06/2026
DOB NOWPlumbingPermit IssuedCity Gas Heating Service Co01/21/2026
DOB NOWGeneral ConstructionPermit IssuedDutchess Cabinets of NY *01/12/2026
DOB NOWGeneral ConstructionSigned-offLCS Restoration01/06/2026
DOB NOWMechanical SystemsPermit IssuedSouth Pacific General12/01/2025
DOB NOWGeneral ConstructionPermit IssuedSouth Pacific General12/01/2025
DOB NOWStructuralPermit IssuedSouth Pacific General12/01/2025
DOB NOWGeneral ConstructionSigned-offClearcut Group08/08/2025
DOB NOWPlumbingSigned-offWynne Plumbing & Heating01/24/2025
DOB NOWPlumbingPermit IssuedWynne Plumbing & Heating12/20/2024
DOB NOWStructuralPermit IssuedSouth Pacific General12/16/2024
DOB NOWMechanical SystemsPermit IssuedSouth Pacific General12/16/2024
DOB NOWGeneral ConstructionPermit IssuedSouth Pacific General12/12/2024
DOB NOWGeneral ConstructionPermit IssuedPna Contracting11/21/2024
DOB NOWStructuralSigned-offSouth Pacific General11/14/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating09/19/2024
DOB NOWGeneral ConstructionSigned-offSouth Pacific General09/06/2024
DOB NOWGeneral ConstructionSigned-offUnited Elite Group08/29/2024
DOB NOWMechanical SystemsSigned-offSouth Pacific General07/15/2024
DOB NOWGeneral ConstructionSigned-offSouth Pacific General07/15/2024
DOB NOWGeneral ConstructionSigned-offKanaris Contracting05/15/2024
DOB NOWGeneral ConstructionSigned-offKanaris Contracting05/15/2024
DOB NOWGeneral ConstructionSigned-offSouth Pacific General03/28/2024
DOB NOWSuspended ScaffoldPermit IssuedPna Contracting01/26/2024
DOB NOWPlumbingSigned-offM&M Plumbing & Heating10/05/2023
DOB NOWGeneral ConstructionSigned-offKanaris Contracting08/29/2023
DOB NOWGeneral ConstructionPermit IssuedPna Contracting08/09/2023
DOB NOWSidewalk ShedSigned-offSteel Systems06/28/2023
DOB NOWPlumbingSigned-offWynne Plumbing & Heating03/21/2023
DOB NOWPlumbingSigned-offM&M Plumbing & Heating03/17/2023
DOB NOWGeneral ConstructionSigned-offSouth Pacific General03/06/2023
DOB NOWGeneral ConstructionSigned-offLRL Construction03/18/2022
DOB NOWMechanical SystemsSigned-offNU-Way Heating & Cooling03/11/2022
DOB NOWGeneral ConstructionSigned-offSouth Pacific General02/24/2022
DOB NOWPlumbingSigned-offAlan E. Rosenberg08/25/2020
DOB NOWStructuralSigned-offReyes Enterprise12/17/2019
DOB NOWMechanical SystemsSigned-offReyes Enterprise12/17/2019
BISPLISSUEDFive Star P and H Co05/10/2022
+ 49 more permits on file
2 projects · most recent 09/08/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2026Permit IssuedSouth Pacific GeneralAir Conditioning Systems
Cooling
Mitsubishi Electric PEFY-P08NMAU-E4 512 CFM · Vrf Indoor ×2
MXZ-SM48NAM-U1 102,000 BTU · Condensing Unit ×1
PEFY-P08NMSU-ER2 511 CFM · Vrf Indoor ×1
PEFY-P12NMAU-E4 636 CFM · Vrf Indoor ×1
PFFY-P12NRMU-E 564 CFM · Vrf Indoor ×1
Daikin FXSQ09TAVJU 511 CFM · Vrf Indoor ×2
FXDQ18MVJU 790 CFM · Vrf Indoor ×1
FXSQ07TAVJU 511 CFM · Vrf Indoor ×1
PXYMQ36PVJU 76,000 BTU · Vrf Outdoor ×1
11/03/2023Signed-offSouth Pacific GeneralHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZSM48 1 BTU · Heat Pump Outdoor ×1
4 projects · most recent 09/23/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/23/2026Permit IssuedShaw MechanicalWater/Sanitary
09/08/2026Permit IssuedWynne Plumbing & HeatingGas, Water/Sanitary
06/02/2026Permit IssuedCity Gas Heating Service CoWater/Sanitary
03/13/2025——Gas, Water/Sanitary
17 projects · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026Permit IssuedAkay ElectricGeneral Wiring
01/30/2026CompleteBNH Electrical—
01/27/2026Permit IssuedAccurate ElectricalGeneral Wiring
10/30/2025CompleteEmpire Lic Electrical Contractors51 meters, 50 new_meters
08/11/2025CompleteAccurate ElectricalGeneral Wiring
05/28/2025Permit IssuedAccurate Electrical46 meters, 1 new_meters
01/05/2025Permit IssuedAccurate ElectricalGeneral Wiring
07/24/2024Permit IssuedFalco Electrical ServicesGeneral Wiring
12/11/2023CompleteIkaros Electrical EnterprisesGeneral Wiring
06/20/2023CompleteTop Shelf Electric—
02/23/2023CompleteAccurate ElectricalGeneral Wiring
10/07/2022CompleteCentennial Elevator IndustriesGeneral Wiring
03/02/2022CompleteAccurate ElectricalGeneral Wiring
03/10/2021CompletePrincipal Electrical1 meters
11/10/2020CompleteCentennial Elevator IndustriesGeneral Wiring
3 projects · most recent 06/02/2026
Steel Masonry Concrete
FiledStatusContractorScope
06/02/2026Permit IssuedCity Gas Heating Service CoSteel
08/09/2024Permit IssuedSouth Pacific GeneralSteel, Concrete, Masonry
11/03/2023Signed-offSouth Pacific GeneralSteel, Masonry
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
09/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
06/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
09/15/2026Energy Code Compliance InspectionsMICHAEL RODRIGUEZprogress
09/01/2026Fire-Resistant Penetrations and JointsNicolas Crosettospecial
09/01/2026Mechanical SystemsNicolas Crosettospecial
09/01/2026FinalRobert Divilioprogress
09/01/2026FinalNicolas Crosettoprogress
09/01/2026Tenant Protection Plan Compliance—special
07/28/2026FinalMICHAEL RODRIGUEZprogress
07/28/2026Fire-Resistance Rated ConstructionMICHAEL RODRIGUEZprogress
05/22/2026Fire-Resistant Penetrations and JointsDAVID HOFMANNspecial
05/22/2026Post-installed AnchorsDAVID HOFMANNspecial
05/22/2026FinalRyan Churchwardprogress
03/19/2026Post-installed AnchorsDAVID HOFMANNspecial
03/19/2026FinalRyan Churchwardprogress
03/19/2026Fire-Resistant Penetrations and JointsDAVID HOFMANNspecial
10/24/2025FinalNikola Martinovicprogress
10/24/2025Fire-Resistant Penetrations and JointsNikola Martinovicspecial
10/24/2025Insulation placement and R valuesNikola Martinovicenergy_progress
10/24/2025Energy Code Compliance InspectionsNikola Martinovicprogress
10/24/2025Tenant Protection Plan ComplianceNikola Martinovicspecial
09/11/2025Tenant Protection Plan ComplianceNicolas Crosettospecial
09/11/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
09/11/2025FinalNicolas Crosettoprogress
08/14/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
08/14/2025Tenant Protection Plan Compliance—special
08/14/2025FinalNicolas Crosettoprogress
Latest 25 of 102.
▾Documents — 743 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch39
09/01/2026M00729079-I1Request digital key ↗
08/30/2026M00884861-I1Request digital key ↗
08/30/2026M00894167-P1Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00451872-I1Request digital key ↗
09/03/2026M00451872-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00309616-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00272887-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00272849-I1Request digital key ↗
▸Applications & Permits161
▸BISPLAN / WORK APPROVAL APPLICATION64
12/11/2024103745707Open ↗
05/26/2022104714560Open ↗
04/06/2022104714560Open ↗
Showing 3 of 64 on file for this type
▸BISWORK PERMIT APPLICATION52
05/11/2022104714560Open ↗
10/27/2020140914492Open ↗
08/03/2020140925694Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWLPC Approval/Permit41
10/14/2026M00956641-P1Open ↗
09/27/2026M00956626-P2Open ↗
09/05/2026M00272849-I1Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
07/30/2020140925694Open ↗
07/30/2020140925694Open ↗
07/30/2020140925694Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications209
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION56
03/20/2020122549144Open ↗
03/20/2020122549144Open ↗
03/20/2020122549144Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
10/14/2026M00956641-P1Open ↗
10/14/2026M00956651-P1Open ↗
09/27/2026M00956626-P2Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWProgress Inspector Seal & Signature47
10/14/2026M00956641-P1Open ↗
10/04/2026M01437590-S1Open ↗
09/29/2026M00898671-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
10/14/2026M00956641-P1Open ↗
09/29/2026M00898671-I1Open ↗
09/27/2026M00956626-P2Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/21/2016122747698Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/01/2016140520407Open ↗
04/21/2016122747698Open ↗
04/21/2016122747698Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/31/2020140914492Open ↗
07/20/2020140925694Open ↗
08/01/2016140520407Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/31/2020140914492Open ↗
07/20/2020140925694Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/01/2016140520407Open ↗
▸Trade Schedules & Equipment39
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING12
05/26/2022104714560Open ↗
Showing 1 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/18/2017122549144Open ↗
04/21/2016122747698Open ↗
Showing 2 of 8 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
07/30/2020140925694Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸BISTENANT PROTECTION PLAN AND NOTES7
04/27/2022104714560Open ↗
07/30/2020140925694Open ↗
07/30/2020140925694Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00272849-I1Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos67
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
10/14/2026M00956641-P1Open ↗
09/27/2026M00956626-P2Open ↗
09/05/2026M00272849-I1Open ↗
Showing 3 of 43 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
08/31/2020140914492Open ↗
07/30/2020140925694Open ↗
07/20/2020140925694Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
08/08/2016122816621Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
03/20/2020122549144Open ↗
03/20/2020122549144Open ↗
05/17/2017122816621Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/23/2022121932800Open ↗
04/22/2021140925694Open ↗
03/20/2020122549144Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/23/2022121932800Open ↗
04/27/2021140925694Open ↗
04/27/2021140925694Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/01/2016140520407Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
04/05/2022104714560Open ↗
04/05/2022104714560Open ↗
03/23/2022121932800Open ↗
Showing 3 of 10 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/05/2022104714560Open ↗
▸Approvals, Objections & Sign-offs55
▸BISLANDMARKS APPROVAL24
08/31/2020140914492Open ↗
07/20/2020140925694Open ↗
02/27/2019123250891Open ↗
Showing 3 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
06/02/2022104714560Open ↗
04/27/2021140925694Open ↗
03/20/2020122549144Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/11/2022104714560Open ↗
05/11/2022104714560Open ↗
03/31/2022121932800Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS SIGNOFF2
04/06/2022104714560Open ↗
04/22/2021140925694Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
03/23/2022121932800Open ↗
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT36
03/23/2022121932800Open ↗
04/22/2021140925694Open ↗
08/31/2020140914492Open ↗
Showing 3 of 36 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/03/2022104714560Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
07/30/2020140925694Open ↗
▸Filing & Intake Forms55
▸BISEFILING COVER SHEET18
01/04/2019123250891Open ↗
01/04/2019123250891Open ↗
07/07/2016122816621Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION17
05/27/2022104714560Open ↗
04/09/2021140925694Open ↗
03/31/2021140925694Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM16
05/11/2022104714560Open ↗
04/29/2022104714560Open ↗
03/20/2020122549144Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/31/2020140914492Open ↗
07/20/2020140925694Open ↗
08/01/2016140520407Open ↗
Showing 3 of 4 on file for this type
▸Other Documents20
▸DOB NOWProof of Historic Building11
10/14/2026M00956641-P1Open ↗
09/27/2026M00956626-P2Open ↗
08/27/2026M00956651-P1Open ↗
Showing 3 of 11 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/04/2022140914492Open ↗
03/31/2022121932800Open ↗
08/31/2020140914492Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
04/06/2022104714560Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type