Condo, commercial tower (mixed-use) [derived]
The 50 West 47th Street Condominium
44 WEST 47 STREET · BIN 1034346
💬 Discuss this project
2009Year Built
36Stories
RCBuilding Class
C6-4.5Zoning
487,299 sfGross Floor Area
105Units
LL97 Covered2 Open Violations ▸FISP: SAFE
Condo, commercial tower (mixed-use) [derived] · 24,000 sf lot · 20.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 5 docs
Floor 345p · 2 filings · 13 docs
Floor 33
Floor 32
Floor 31
Floor 30
Floor 292p · 1 filing · 3 docs
Floor 28
Floor 279p · 1 filing · 4 docs
Floor 26
Floor 25
Floor 24
Floor 23
Floor 227p · 1 filing · 3 docs
Floor 21
Floor 20
Floor 191p · 1 filing · 5 docs
Floor 18Under Construction51p · 4 filings · 20 docs
Floor 172p · 2 filings · 5 docs
Floor 166p · 4 filings · 17 docs
Floor 1529p · 2 filings · 20 docs
Floor 142p · 2 filings · 20 docs
Floor 1338p · 9 filings · 20 docs
Floor 125p · 4 filings · 20 docs
Floor 114p · 3 filings · 20 docs
Floor 1014p · 12 filings · 20 docs
Floor 9Under Construction35p · 10 filings · 20 docs
Floor 8Under Construction20p · 1 filing · 10 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 319p · 5 filings · 14 docs
Floor 2
Floor 1
CellarUnder Construction8p · 2 filings · 20 docs
Sub-Cellar2p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
50 WEST 47TH STREET CONDOMINIUM509/24/2026
300 MADISON AVENUE707/08/2026
EFFECTV - A COMCAST COMPANY707/08/2026
BROOKFIELD PROPERTIES303/22/2026
GIA903/22/2026
EXTELL DEVELOPMENT COMPANY3003/22/2026
TISHMAN CONSTRUCTION5503/22/2026
TISHMAN CONTRATION CORP103/22/2026
TISHMAN CONSTRUCTION GRP103/22/2026
57 WEST 46303/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MGI DESIGNED INTERIORSGeneral Contractor7107/08/2026
G&B PLUMBING&HEATING CORPPlumbing1907/08/2026
AQUEDUCT MECHANICAL CORPFire Protection1307/08/2026
I & G GROUP, INCGeneral Contractor707/08/2026
VERUS INCGeneral Contractor603/21/2026
L&K PARTNERS, INCGeneral Contractor507/08/2026
JT MAGEN & COMPANY INCGeneral Contractor507/08/2026
LINTECH ELECTRIC, INC.Electrical403/22/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor407/08/2026
BEAMAN, MARCElectrical303/21/2026
WAGER CONTRACTING CO, INCGeneral Contractor307/08/2026
PAR PLUMBING CO., INCPlumbing207/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection207/08/2026
MARTINEZ, JOSEElectrical203/21/2026
AQUEDUCT MECHANICAL CORPPlumbing207/08/2026
BOARDWALK PLBNG & HTG INCFire Protection207/08/2026
MCKENNA, KERWINElectrical203/21/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
EBM PLUMBING CORPPlumbing107/08/2026
GEOFFREY A. LAGAS & ASSOCPlumbing107/08/2026
LAB PLBG & HTG CO INCPlumbing107/08/2026
BLUE CITY CONSTRUCTIONGeneral Contractor107/08/2026
CHRISTOPHER PALLARINOElectrical103/21/2026
ECO ELECTRICAL SERVCS LLCElectrical103/22/2026
GERBERT BONHOMMEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524405/06/2026
JACK GREEN ASSOCIATES4223311/22/2025
HAMANN ENGINEERING, PLLC4949111/19/2025
NEW YORK ENGINEERS, P.C.3868104/09/2025
BLUE LIGHT CONSULTING &AM9394104/09/2025
WB ENGINEERING533103/25/2025
CODEGREEN510201/29/2025
VINCENT J. LIOTTA P. E.1974111/20/2024
AK ENGINEERING PC678207/18/2024
MILROSE CONSULTANTS LLC2003201/10/2024
Building Lifecycle
All (300)Filed (72)Permit Issued (80)Signed Off (57)Facade (FISP) (3)Violation (2)Inspection (48)Objection (8)Special Inspection (30)
09/23/2026
Permit issued — Plumbing
M01318490-I1-PL
05/12/2026
Permit issued — Sprinklers
M01369132-S3-EW-SP
05/11/2026
Permit issued — Plumbing
M01369132-S2-PL
05/08/2026
Permit issued — Mechanical Systems
M01369132-S1-MS
05/08/2026
Permit issued — General Construction
M01369132-I1-GC
05/06/2026
Filed — Alteration
PROVIDE HAND SINKS, COMPRESSED AIR, OXYGEN, AND GAS PIPINGS ON PART 8TH CONSTRUCTION (9TH MARKETING) FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPAMCY, OR EGRESS.
M01369132-S3
05/06/2026
Filed — Alteration
PROVIDE HAND SINKS, COMPRESSED AIR, OXYGEN, AND GAS PIPINGS ON PART 8TH CONSTRUCTION (9TH MARKETING) FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPAMCY, OR EGRESS.
M01369132-I1
05/06/2026
Filed — Alteration
PROVIDE HAND SINKS, COMPRESSED AIR, OXYGEN, AND GAS PIPINGS ON PART 8TH CONSTRUCTION (9TH MARKETING) FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPAMCY, OR EGRESS.
M01369132-S2
05/06/2026
Filed — Alteration
PROVIDE HAND SINKS, COMPRESSED AIR, OXYGEN, AND GAS PIPINGS ON PART 8TH CONSTRUCTION (9TH MARKETING) FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPAMCY, OR EGRESS.
M01369132-S1
04/24/2026
Permit issued — Plumbing
M01318490-I1-PL
03/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/09/2026
Special inspection requirement — Final
Shahrish Shuvo
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
03/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
02/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/04/2026
Objection resolved — Addressed
01/30/2026
Signed off — Alteration
Modifications to the existing HVAC system: Remove existing branch ductwork, grilles, wires. Install new ductwork, diffusers, and controls and registers on the 34th floor, as per plans. No change to use, egress, or occupancy.
M01157746-I1
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2025
Objection resolved — Addressed
12/10/2025
Objection raised — Scope
12/10/2025
Objection raised — Cost
12/08/2025
Permit issued — Sprinklers
M01260600-S1-PL
12/08/2025
Permit issued — Plumbing
M01260600-S1-EW-SP
12/03/2025
Signed off — Alteration
Modifications to the existing HVAC system: Remove existing branch ductwork, grilles, wires. Install new ductwork, diffusers, and controls and registers on the 34th floor, as per plans. No change to use, egress, or occupancy.
M01157746-S1
11/22/2025
Filed — Alteration
RENOVATE UNIT 20LM ON THE 18TH CONSTRUCTION FLOOR INCLUDING INTERIOR PARTITIONS AND MODIFY HVAC SYSTEM AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01260600-P2
11/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
11/20/2025
Special inspection requirement — Mechanical Systems
JACK GREEN
11/20/2025
Special inspection requirement — Lighting controls
JACK GREEN
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
11/20/2025
Special inspection requirement — Interior lighting power
JACK GREEN
11/20/2025
Special inspection requirement — Final
JACK GREEN
11/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
11/19/2025
Filed — Alteration
PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01318490-I1
11/13/2025
Signed off — Alteration
Modifications to the existing HVAC system: Remove existing branch ductwork, grilles, wires. Install new ductwork, diffusers, and controls and registers on the 34th floor, as per plans. No change to use, egress, or occupancy.
M01157746-S2
11/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
11/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
11/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
11/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
11/13/2025
Special inspection requirement — Maintenance information
CARL HAMANN
11/11/2025
Filed — Alteration
RENOVATE UNIT 20LM ON THE 18TH CONSTRUCTION FLOOR INCLUDING INTERIOR PARTITIONS AND MODIFY HVAC SYSTEM AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01260600-P1
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
11/07/2025
Special inspection requirement — Final
JACK GREEN
11/07/2025
Special inspection requirement — Interior lighting power
JACK GREEN
11/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
11/07/2025
Special inspection requirement — Mechanical Systems
JACK GREEN
11/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
11/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
11/07/2025
Special inspection requirement — Lighting controls
JACK GREEN
11/05/2025
Permit issued — Plumbing
M01260600-S1-PL
11/05/2025
Permit issued — Plumbing
M01260600-S1-EW-SP
10/30/2025
Permit issued — Mechanical Systems
M01260600-I1-GC
10/30/2025
Permit issued — General Construction
M01260600-I1-MS
10/22/2025
Filed — Alteration
RENOVATE UNIT 20LM ON THE 18TH CONSTRUCTION FLOOR INCLUDING INTERIOR PARTITIONS AND MODIFY HVAC SYSTEM AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01260600-S1
10/22/2025
Filed — Alteration
RENOVATE UNIT 20LM ON THE 18TH CONSTRUCTION FLOOR INCLUDING INTERIOR PARTITIONS AND MODIFY HVAC SYSTEM AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01260600-I1
05/09/2025
Signed off — Alteration
MODIFY SPRINKLER LAYOUT IN UNIT 15C ON THE 13TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00910626-S2
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA.M.N. CORPORATION09/23/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP05/12/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC05/11/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC05/08/2026
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC05/08/2026
DOB NOWPlumbingPermit IssuedAMN PLUMBING CORP04/24/2026
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC12/08/2025
DOB NOWSprinklersPermit IssuedARCO PLBG AND HTG INC12/08/2025
DOB NOWPlumbingPermit IssuedAQUEDUCT MECHANICAL CORP11/05/2025
DOB NOWPlumbingPermit IssuedAQUEDUCT MECHANICAL CORP11/05/2025
DOB NOWGeneral ConstructionPermit IssuedMGI DESIGNED INTERIORS10/30/2025
DOB NOWMechanical SystemsPermit IssuedMGI DESIGNED INTERIORS10/30/2025
DOB NOWGeneral ConstructionSigned-offJT MAGEN & COMPANY INC02/06/2025
DOB NOWMechanical SystemsSigned-offJT MAGEN & COMPANY INC02/03/2025
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP02/03/2025
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN11/26/2024
DOB NOWGeneral ConstructionSigned-offMGI DESIGNED INTERIORS11/13/2024
DOB NOWGeneral ConstructionSigned-offWAGER CONTRACTING CO, INC09/17/2024
DOB NOWMechanical SystemsSigned-offMGI DESIGNED INTERIORS08/16/2024
DOB NOWGeneral ConstructionSigned-offMGI DESIGNED INTERIORS08/13/2024
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP08/13/2024
DOB NOWPlumbingSigned-offGEOFFREY A. LAGAS & ASSOC08/12/2024
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP07/30/2024
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP07/23/2024
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO05/10/2024
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO05/07/2024
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO05/07/2024
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO05/07/2024
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO02/26/2024
DOB NOWPlumbingSigned-offLAB PLBG & HTG CO INC01/26/2024
DOB NOWMechanical SystemsSigned-offVERUS INC01/11/2024
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP12/15/2023
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO12/15/2023
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP12/15/2023
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO12/15/2023
DOB NOWGeneral ConstructionSigned-offMGI DESIGNED INTERIORS12/14/2023
DOB NOWMechanical SystemsSigned-offMGI DESIGNED INTERIORS12/14/2023
DOB NOWGeneral ConstructionSigned-offMGI DESIGNED INTERIORS12/14/2023
DOB NOWMechanical SystemsSigned-offMGI DESIGNED INTERIORS12/12/2023
DOB NOWSprinklersSigned-offAQUEDUCT MECHANICAL CORP11/27/2023
+ 60 more permits on file
4 projects · most recent 05/06/2026
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/06/2026Permit IssuedJT MAGEN & COMPANY INCAir Conditioning Systems, Heating Systems
Cooling
Lg ARWM072DAS5 72,000 BTU · Vrf Outdoor ×1
Heating
Lg ARWM072DAS5 81,000 BTU · Vrf Outdoor ×1
11/22/2025Permit IssuedMGI DESIGNED INTERIORSHeating and Air Conditioning Systems
Heat / Cool
Climatemaster TCH-024 29,000 BTU · Wshp ×6
TCH-048 57,000 BTU · Wshp ×3
04/09/2025——Heating and Air Conditioning Systems
Heat / Cool
Daikin GCH-030 1,000 CFM · Wshp ×1
10/27/2023——Heating and Air Conditioning Systems
Heat / Cool
Climatemaster TC-030 28,300 BTU · Wshp ×1
3 projects · most recent 05/06/2026
Sprinkler System
FiledStatusContractorScope
05/06/2026Permit IssuedABCO-PEERLESS SPRKLR CORPSprinkler System
11/22/2025Permit IssuedARCO PLBG AND HTG INCSprinkler System
10/27/2023——Sprinkler System
5 projects · most recent 05/06/2026
Water/Sanitary Gas Medical Gas
FiledStatusContractorScope
05/06/2026Permit IssuedPAR PLUMBING CO., INCGas, Medical Gas, Water/Sanitary
11/22/2025Permit IssuedARCO PLBG AND HTG INCWater/Sanitary
11/19/2025Permit IssuedA.M.N. CORPORATIONWater/Sanitary
10/27/2023——Water/Sanitary
03/07/2023——Water/Sanitary
25 projects · most recent 06/01/2026
General Wiring Lighting
FiledStatusContractorScope
06/01/2026Permit IssuedRONAN ELECTRICAL LLCGeneral Wiring
05/14/2026CompleteMAXIMUM ELECTRIC CORP.—
01/20/2026CompleteKLEINKNECHT ELEC. CO.,INCGeneral Wiring
01/11/2026Permit IssuedSUPREME ELECTRIC CORPGeneral Wiring
11/21/2024Permit IssuedPOWER-TECH INSTALL. ELEC'General Wiring
08/22/2024CompleteLINTECH ELECTRIC, INCGeneral Wiring
08/20/2024CompleteKONSKER ELECTRIC CORP.General Wiring
02/07/2024Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
01/26/2024CompleteLINTECH ELECTRIC, INCGeneral Wiring
01/26/2024CompleteLINTECH ELECTRIC, INCGeneral Wiring
11/28/2023Permit IssuedSTANCO SYSTEM ELEC'L CONTGeneral Wiring
10/13/2023Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
09/19/2023Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
07/25/2023CompleteLINTECH ELECTRIC, INCGeneral Wiring
03/26/2023CompleteLINTECH ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 48
DateTypeResultReport
03/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/25/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 48.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
03/09/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/09/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
03/09/2026FinalShahrish Shuvoprogress
11/20/2025HVAC-R and service water heating system controlsJACK GREENenergy_progress
11/20/2025HVAC-R and service water piping design and insulationJACK GREENenergy_progress
11/20/2025Lighting controlsJACK GREENenergy_progress
11/20/2025FinalJACK GREENprogress
11/20/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
11/20/2025Mechanical SystemsJACK GREENspecial
11/20/2025HVAC-R and service water heating equipmentJACK GREENenergy_progress
11/20/2025Interior lighting powerJACK GREENenergy_progress
11/13/2025Maintenance informationCARL HAMANNenergy_progress
11/13/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
11/13/2025HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
11/13/2025HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
11/13/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
11/07/2025Mechanical SystemsJACK GREENspecial
11/07/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
11/07/2025Lighting controlsJACK GREENenergy_progress
11/07/2025HVAC-R and service water heating system controlsJACK GREENenergy_progress
11/07/2025HVAC-R and service water heating equipmentJACK GREENenergy_progress
11/07/2025HVAC-R and service water piping design and insulationJACK GREENenergy_progress
11/07/2025Interior lighting powerJACK GREENenergy_progress
11/07/2025FinalJACK GREENprogress
04/07/2025Post-installed AnchorsFeng Lispecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
D.e.shOfficeFloors 20, 22
Project M00896215 Alteration · LOC Issued · 07/10/2023
STG OfficeOfficeFloor 3
Project M08019658 Alteration · Permit Entire · 03/07/2023
Project M08020362 Alteration · Approved · 03/07/2023
Project M08017081 Alteration · Permit Entire · 03/02/2023
TopdealOfficeFloor 13
Project M00809541 Alteration · LOC Issued · 01/12/2023
Star AsiaOfficeFloor 16
Project M00475589 Alteration · LOC Issued · 03/01/2021
JQ OfficesOfficeFloor 15
Project M00444548 Alteration · LOC Issued · 01/28/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 5,281 on file (BIS + DOB NOW)
▸Plans & Drawings110
▸DOB NOWPlans/Sketch72
09/02/2026M00687269-I1Request digital key ↗
09/02/2026M00687313-I1Request digital key ↗
09/02/2026M00687242-I1Request digital key ↗
Showing 3 of 72 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler10
09/04/2026M00407232-I1Request digital key ↗
09/04/2026M00449512-P1Request digital key ↗
09/04/2026M00449512-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems10
09/04/2026M00421225-I1Request digital key ↗
09/04/2026M00447318-P1Request digital key ↗
09/04/2026M00447318-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/04/2026M00407193-I1Request digital key ↗
09/04/2026M00448523-I1Request digital key ↗
09/04/2026M00444514-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/04/2026M00475589-I1Request digital key ↗
09/03/2026M00445545-I1Request digital key ↗
09/03/2026M00445545-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/04/2026M00449875-I1Request digital key ↗
09/04/2026M00423118-P1Request digital key ↗
09/04/2026M00423118-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
09/04/2026M00422415-I1Request digital key ↗
09/04/2026M00422415-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/05/2026M00160315-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits1,099
▸BISPLAN / WORK APPROVAL APPLICATION603
11/17/2025123772738Open ↗
07/10/2024124040769Open ↗
09/08/2023123339789Open ↗
Showing 3 of 603 on file for this type
▸BISWORK PERMIT APPLICATION482
07/25/2023122015416Open ↗
07/28/2022123365456Open ↗
07/28/2022123365456Open ↗
Showing 3 of 482 on file for this type
▸BISPLACE OF ASSEMBLY12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED3
03/22/2023123917770Open ↗
12/01/2022123916744Open ↗
10/24/2022123916496Open ↗
▸Seals & Professional Certifications1,441
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION719
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 719 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST179
08/16/2021140978324Open ↗
Showing 1 of 179 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT157
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 157 on file for this type
▸DOB NOWProgress Inspector Seal & Signature116
09/29/2026M00420745-P1Open ↗
09/29/2026M00420745-P1Open ↗
09/29/2026M00420745-P1Open ↗
Showing 3 of 116 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature108
09/04/2026M00447318-P2Open ↗
09/04/2026M00447318-I1Open ↗
09/04/2026M00447318-P1Open ↗
Showing 3 of 108 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM77
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 77 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature69
09/29/2026M00933671-S3Open ↗
09/29/2026M00420745-P1Open ↗
09/27/2026M01157746-S2Open ↗
Showing 3 of 69 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment610
▸BISSELF-CERT PLUMBING NOTICE159
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 159 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE127
10/03/2022123412609Open ↗
Showing 1 of 127 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA114
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 114 on file for this type
▸BISSCHEDULE B - PLUMBING85
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 85 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT60
09/15/2023121783034Open ↗
Showing 1 of 60 on file for this type
▸BISEQUIPMENT USE PERMITS40
09/05/2023121783034Open ↗
Showing 1 of 40 on file for this type
▸BISSPRINKLER INSP REPORT : FP-858
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS5
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
11/09/2022123148520Open ↗
Showing 3 of 5 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT5
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
11/09/2022123148520Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER SYSTEMS3
02/06/2023123365456Open ↗
11/01/2022123148511Open ↗
02/08/2022123582097Open ↗
▸Environmental & Asbestos24
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance500
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS305
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 305 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS127
11/01/2021140969584Open ↗
Showing 1 of 127 on file for this type
▸BISTR8: Energy Code Progress Inspections13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
02/07/2023123365456Open ↗
08/21/2022121783034Open ↗
07/13/2022123365456Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)9
09/12/2025123772738Open ↗
12/19/2023122015416Open ↗
02/06/2023123365456Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.8
09/04/2026M00447318-I1Open ↗
09/04/2026M00420745-I1Open ↗
09/04/2026M00475589-I1Open ↗
Showing 3 of 8 on file for this type
▸BISINTERIOR LIGHTING POWER6
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
11/09/2022123148520Open ↗
Showing 3 of 6 on file for this type
▸BIS* HVAC INSULATION AND SEALING6
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
11/09/2022123148520Open ↗
Showing 3 of 6 on file for this type
▸BISLIGHTING CONTROLS6
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
11/09/2022123148520Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS5
09/12/2025123772738Open ↗
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports50
▸BISTECHNICAL REPORT: RESPONSIBILITY33
03/09/2023123148511Open ↗
03/09/2023123148520Open ↗
02/07/2023123365456Open ↗
Showing 3 of 33 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)6
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
11/09/2022123148520Open ↗
Showing 3 of 6 on file for this type
▸BISMECHANICAL SYSTEMS6
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
11/09/2022123148520Open ↗
Showing 3 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Approvals, Objections & Sign-offs356
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST254
11/18/2025123772738Open ↗
11/26/2024121783034Open ↗
12/20/2023122015416Open ↗
Showing 3 of 254 on file for this type
▸BISADMINISTRATIVE OBJECTIONS59
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 59 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSUPERSEDING LETTER13
07/25/2023122015416Open ↗
Showing 1 of 13 on file for this type
▸BISFINAL8
09/12/2025123772738Open ↗
04/21/2023122015416Open ↗
03/09/2023123148511Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
09/04/2026M00420745-P1Open ↗
09/04/2026M00420745-I1Open ↗
09/04/2026M00422415-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership456
▸BISCOST AFFIDAVIT440
11/01/2021140978324Open ↗
11/01/2021123475685Open ↗
11/01/2021140969584Open ↗
Showing 3 of 440 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW312
09/12/2025123772738Open ↗
10/20/2023122843753Open ↗
07/25/2023121783016Open ↗
Showing 3 of 12 on file for this type
▸BISDEPT OF FINANCE VERIFICATION4
07/10/2024124040769Open ↗
11/16/2022123916744Open ↗
09/28/2022123916496Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms583
▸BISEFILING COVER SHEET353
07/10/2024124040769Open ↗
02/23/2023123917770Open ↗
11/16/2022123916744Open ↗
Showing 3 of 353 on file for this type
▸BISADDITIONAL INFORMATION127
09/07/2024124040769Open ↗
06/20/2023122015416Open ↗
03/22/2023123917770Open ↗
Showing 3 of 127 on file for this type
▸BISBOROUGH INTAKE FORM92
07/25/2023122015416Open ↗
Showing 1 of 92 on file for this type
▸BISeFiling Job Application Cover Sheet11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISMAINTENANCE INFORMATION5
04/21/2023122015416Open ↗
02/06/2023123365456Open ↗
11/09/2022123148520Open ↗
Showing 3 of 5 on file for this type