← Back
School or academy
4401 CAYUGA AVENUE
BRONX · BIN 2098730
💬 Discuss this project
1943Year Built
3Stories
W3Building Class
R1-2Zoning
10,720 sfGross Floor Area
1Units
16 Open Violations 14 unresolved · 2 paperwork only ▸
School or academy · Owner of record: HORACE MANN BERNARD SCHOOL · 113,500 sf lot · 0.09 FAR built · Flood zone X
Locations of Work
Mechanical
Roof4p · 3 filings · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HORACE MANN SCHOOL2307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP309/15/2025
BASIC GROUPS CORP109/06/2024
LONGTIN SOLUTIONS LLC405/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOOD-WILL MECHANICAL CORP.General Contractor607/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758309/15/2025
ANDREW GOODRICH, P.E., PL965109/06/2024
LONGTIN SOLUTIONS LLC8320405/07/2024
Building Lifecycle
All (69)Filed (8)Permit Issued (4)Signed Off (4)Violation (23)Special Inspection (30)
04/08/2026
Violation issued (ECB, open)
Construction
10/02/2025
Signed off — Alteration
PROPOSED INSTALLATION OF NEW HVAC EQUIPMENT ON EXISTING 3 STORY PUBLIC FACILITIES &INSTITUTIONS BUILDING (2ND, 3RD FLOOR AND ROOF). MECHANICAL WORK AS PER PLAN. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
X01268214-I1
09/15/2025
Filed — Alteration
PROPOSED INSTALLATION OF NEW HVAC EQUIPMENT ON EXISTING 3 STORY PUBLIC FACILITIES &INSTITUTIONS BUILDING (2ND, 3RD FLOOR AND ROOF). MECHANICAL WORK AS PER PLAN. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
X01268214-P2
09/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/15/2025
Special inspection requirement — Mechanical Systems
Eric Sun
09/15/2025
Special inspection requirement — Final
Eric Sun
09/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANDREW GOODRICH
09/15/2025
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
09/15/2025
Special inspection requirement — Duct leakage testing, insulation and design
ANDREW GOODRICH
09/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANDREW GOODRICH
09/15/2025
Special inspection requirement — Maintenance information
ANDREW GOODRICH
09/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
ANDREW GOODRICH
09/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
ANDREW GOODRICH
09/10/2025
Special inspection requirement — Mechanical Systems
Eric Sun
09/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/10/2025
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
09/10/2025
Special inspection requirement — Final
Eric Sun
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANDREW GOODRICH
09/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANDREW GOODRICH
09/10/2025
Special inspection requirement — Maintenance information
ANDREW GOODRICH
09/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
ANDREW GOODRICH
09/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
ANDREW GOODRICH
09/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
ANDREW GOODRICH
08/22/2025
Filed — Alteration
PROPOSED INSTALLATION OF NEW HVAC EQUIPMENT ON EXISTING 3 STORY PUBLIC FACILITIES &INSTITUTIONS BUILDING (2ND, 3RD FLOOR AND ROOF). MECHANICAL WORK AS PER PLAN. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
X01268214-P1
08/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
08/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANDREW GOODRICH
08/21/2025
Special inspection requirement — Duct leakage testing, insulation and design
ANDREW GOODRICH
08/21/2025
Special inspection requirement — Maintenance information
ANDREW GOODRICH
08/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
ANDREW GOODRICH
08/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
ANDREW GOODRICH
08/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANDREW GOODRICH
08/21/2025
Special inspection requirement — Mechanical Systems
Eric Sun
08/21/2025
Special inspection requirement — Final
Eric Sun
08/21/2025
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
08/11/2025
Permit issued — Mechanical Systems
X01268214-I1-MS
08/08/2025
Filed — Alteration
PROPOSED INSTALLATION OF NEW HVAC EQUIPMENT ON EXISTING 3 STORY PUBLIC FACILITIES &INSTITUTIONS BUILDING (2ND, 3RD FLOOR AND ROOF). MECHANICAL WORK AS PER PLAN. NOCHANGE IN USE, EGRESS OR OCCUPANCY.
X01268214-I1
10/23/2024
Signed off — Alteration
REPLACE 4 CONDENSING UNITS ON ROOF OF EXISTING SCHOOL. MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01106966-I1
10/17/2024
Permit issued — Mechanical Systems
X01106966-I1-MS
09/06/2024
Filed — Alteration
REPLACE 4 CONDENSING UNITS ON ROOF OF EXISTING SCHOOL. MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01106966-I1
05/13/2024
Signed off — Alteration
FILING TO ADD MECHANICAL SYSTEMS. ALL WORK COMPLETED UNDER JOB#X00792681-I1. NO WORK IS BEING DONE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01046477-I1
05/09/2024
Permit issued — Mechanical Systems
X01046477-I1-MS
05/07/2024
Filed — Alteration
FILING TO ADD MECHANICAL SYSTEMS. ALL WORK COMPLETED UNDER JOB#X00792681-I1. NO WORK IS BEING DONE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01046477-I1
06/14/2023
Signed off — Alteration
Replace air handling units on 1st and 2nd floor and 2 condensing units on roof of existing school. Mechanical work as per plan. No change in use, egress, or occupancy.
X00792681-I1
06/12/2023
Filed — Alteration
Replace air handling units on 1st and 2nd floor and 2 condensing units on roof of existing school. Mechanical work as per plan. No change in use, egress, or occupancy.
X00792681-P3
06/07/2023
Filed — Alteration
Replace air handling units on 1st and 2nd floor and 2 condensing units on roof of existing school. Mechanical work as per plan. No change in use, egress, or occupancy.
X00792681-P1
09/06/2022
Permit issued — Mechanical Systems
X00792681-I1-MS
09/01/2022
Filed — Alteration
Replace air handling units on 1st and 2nd floor and 2 condensing units on roof of existing school. Mechanical work as per plan. No change in use, egress, or occupancy.
X00792681-I1
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2012
Violation issued (ECB, closed)
Construction
11/29/2012
Violation issued (ECB, open)
Plumbing
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL08/11/2025
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL10/17/2024
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL05/09/2024
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL09/06/2022
BISMHISSUEDGOOD-WILL MECHANICAL CORP.09/19/2016
BISMHISSUEDGOOD-WILL MECHANICAL CORP.07/30/2013
BISBLISSUEDATOMIC FUEL OIL TRANSPORT02/22/2006
BISPLISSUEDJ.H. LOEWY INC05/20/2002
BISOTISSUEDTHE STEGLA GROUP INC04/22/2002
BISMHISSUEDTHE STEGLA GROUP INC04/22/2002
BISOTISSUEDTHE STEGLA GROUP INC04/22/2002
BISOTISSUEDANDRON CONSTRUCTION CORP07/11/2001
BISOTISSUEDANDRON CONSTRUCTION CORP07/11/2001
BIS—ISSUEDHORACE MANN BARNARD SCHOOL09/30/1991
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
09/15/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/15/2025Mechanical SystemsEric Sunspecial
09/15/2025FinalEric Sunprogress
09/15/2025Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
09/15/2025Energy Code Compliance InspectionsANDREW GOODRICHprogress
09/15/2025Duct leakage testing, insulation and designANDREW GOODRICHenergy_progress
09/15/2025HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
09/15/2025Maintenance informationANDREW GOODRICHenergy_progress
09/15/2025HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
09/15/2025HVAC-R and service water heating equipmentANDREW GOODRICHenergy_progress
09/10/2025Mechanical SystemsEric Sunspecial
09/10/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/10/2025Energy Code Compliance InspectionsANDREW GOODRICHprogress
09/10/2025FinalEric Sunprogress
09/10/2025Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
09/10/2025HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
09/10/2025Maintenance informationANDREW GOODRICHenergy_progress
09/10/2025HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
09/10/2025HVAC-R and service water heating equipmentANDREW GOODRICHenergy_progress
09/10/2025Duct leakage testing, insulation and designANDREW GOODRICHenergy_progress
08/21/2025Fire-Resistant Penetrations and JointsEric Sunspecial
08/21/2025HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
08/21/2025Duct leakage testing, insulation and designANDREW GOODRICHenergy_progress
08/21/2025Maintenance informationANDREW GOODRICHenergy_progress
08/21/2025HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
Latest 25 of 54.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026X00792681-I1Request digital key ↗
08/24/2026X00792681-P3Request digital key ↗
08/24/2026X00792681-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
09/16/2016240156843Open ↗
08/08/2013220327634Open ↗
▸BISWORK PERMIT APPLICATION2
09/16/2016240156843Open ↗
08/08/2013220327634Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026X01268214-I1Open ↗
09/23/2026X01268214-I1Open ↗
09/23/2026X01268214-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026X00792681-I1Open ↗
08/24/2026X00792681-P1Open ↗
08/24/2026X00792681-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026X01268214-I1Open ↗
09/01/2026X00792681-P1Open ↗
09/01/2026X01268214-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/05/2016240156843Open ↗
10/03/2013220327634Open ↗
08/08/2013220327634Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/16/2016240156843Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/08/2013220327634Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/16/2016240156843Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/08/2013220327634Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/16/2016240156843Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE PERMITS5
12/05/2016240156843Open ↗
12/05/2016240156843Open ↗
10/03/2013220327634Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/05/2016240156843Open ↗
10/03/2013220327634Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00792681-P1Open ↗
08/24/2026X00792681-P3Open ↗
08/24/2026X00792681-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/16/2016240156843Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/05/2016240156843Open ↗
10/03/2013220327634Open ↗
08/08/2013220327634Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/05/2016240156843Open ↗
10/03/2013220327634Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/16/2016240156843Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/16/2016240156843Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00792681-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/16/2016240156843Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/13/2026X00792681-P1Open ↗
08/13/2026X00792681-I1Open ↗
08/13/2026X00792681-P3Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/05/2016240156843Open ↗
10/03/2013220327634Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/03/2013220327634Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/05/2016240156843Open ↗
09/16/2016240156843Open ↗
10/03/2013220327634Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/16/2016240156843Open ↗
▸BISEFILING COVER SHEET1
08/08/2013220327634Open ↗