RoofUnder Construction4p · 4 filings · 18 docs
GeneralMechanicalPlumbingStructuralOther
FACADE REPAIR
On file for this project
5 documents · 1 drawing sheet
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
General construction modifications taking place on the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
BulkheadUnder Construction1p · 2 filings · 8 docs
ArchitectureGeneralStructural
FACADE REPAIR
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Floor 426p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Sprinkler modifications taking place on 42nd floor per tenant fit out, including 33 new sp heads and 1 gravity tank, and removal of 7 existing sp heads. no change to use egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
PLUMBING MODIFICATIONS FOR TENANT FIT OUT TAKING PLACE ON 42ND FLOOR, INCLUDNIG OFFICE ADDITIONS AND ALTERATIONS, PROVIDE NEW HOT WATER HEATER, CONNECT NEW FIXTURES TO CW, HW, SAN, AND VENT.
On file for this project
3 documents · 1 drawing sheet
Tenant Interior fit out as per plans filed herewith, including duct work and installation of two AC units. No change to use egress or occupancy.,
On file for this project
11 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 411p · 1 filing · 3 docs
Plumbing
PLUMBING MODIFICATIONS FOR TENANT FIT OUT TAKING PLACE ON 42ND FLOOR, INCLUDNIG OFFICE ADDITIONS AND ALTERATIONS, PROVIDE NEW HOT WATER HEATER, CONNECT NEW FIXTURES TO CW, HW, SAN, AND VENT.
On file for this project
3 documents · 1 drawing sheet
Floor 40
Floor 39
Floor 387p · 5 filings · 19 docs
Fire ProtectionMechanicalPlumbing
Sprinkler changes on 38th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical changes on 38th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Plumbing Modifications taking on 38th floor as plans filed herewith.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 37
Floor 3610p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Sprinkler modifications on the 36th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 3 drawing sheets
Plumbing modifications on the 36th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
General construction taking place on the 36th floor as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 2721p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Sprinklers
Plumbing modifications taking place on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Sprinkler modifications taking place on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Mechanical modifications taking place on the 27th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 265p · 3 filings · 15 docs
ArchitectureFire ProtectionMechanical
Minor general construction including partition removal and relocation for tenant layout as per plans filed herewith. No change to use egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
modifications of existing sprinkler system including relocation of existing connections to meet coverage requirements of new office layout. No change to use egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Minor mechanical modifications for new tenant layout as per plans filed here with. No change to use egress or occupancy
On file for this project
9 documents · 2 drawing sheets
Floor 25
Floor 24Under Construction2p · 2 filings · 15 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Plumbing and Sprinkler work for office rebuild
On file for this project
14 documents
Full floor demolition of all interior non load bearing partitions and floor finishes on floors 15 16, 20 & 24.
On file for this project
1 document
Floor 234p · 4 filings · 20 docs
Fire ProtectionMechanical
Sprinkler modifications as per plans filed herewith. no change to use egress
On file for this project
7 documents · 1 drawing sheet
Modifications to mechanical ductwork and piping on 23rd floor, as per plans filed herewith. PAA to include replacing of outdoor rooftop heat pump outdoor air condensing unit. No change to use egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 22
Floor 2116p · 4 filings · 19 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
General construction modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 7 drawing sheets
Mechanical modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Plumbing modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 20Under Construction2p · 2 filings · 18 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing and Sprinkler work for office renovation.
On file for this project
17 documents
Full floor demolition of all interior non load bearing partitions and floor finishes on floors 15 16, 20 & 24.
On file for this project
1 document
Floor 19
Floor 18
Floor 171p · 1 filing · 6 docs
Fire Protection
Sprinkler modifications to the 17th floor as per plans filed herewith. No change in use, egress or occupancy.(Post-Approval Amendment to show the updated sprinkler layout. No change in use, egress or occupancy.)
On file for this project
6 documents · 1 drawing sheet
Floor 16Under Construction2p · 1 filing · 1 doc
Architecture
Issued Permit Scope
General Construction
Full floor demolition of all interior non load bearing partitions and floor finishes on floors 15 16, 20 & 24.
On file for this project
1 document
Floor 15Under Construction5p · 3 filings · 14 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction
Full floor demolition of all interior non load bearing partitions and floor finishes on floors 15 16, 20 & 24.
On file for this project
1 document
Structural modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
10 documents · 1 drawing sheet
Floor 1415p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Structural modifications taking place on the 13th and 14th floors as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Plumbing modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Sprinkler modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 134p · 1 filing · 5 docs
Fire Protection
Issued Permit Scope
Sprinklers
Installation of sprinkler temp loop for the 13th floor. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 12
Floor 11
Floor 1013p · 7 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Sprinkler modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Mechanical modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 5 drawing sheets
Plumbing modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 94p · 2 filings · 10 docs
Fire ProtectionMechanical
General sprinkler modifications on the 9th floor as per plans filed herewith. No change is use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Mechanical modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Floor 8Under Construction1p · 1 filing · 5 docs
ArchitectureGeneral
FACADE REPAIR
On file for this project
5 documents · 1 drawing sheet
Floor 79p · 5 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
Sprinkler modifications taking place on the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Sprinkler modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Structural modifications taking place in the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 62p · 2 filings · 18 docs
Fire ProtectionStructural
Sprinkler modifications taking place on the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Structural modifications taking place in the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 5
Floor 4
Floor 3
Floor 22p · 1 filing · 20 docs
DMMechanicalStructural
Structural modifications taking place on GRD and CEL as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
22 documents · 2 drawing sheets
Floor 17p · 5 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Sprinkler modifications taking place on the 6th and 7th floors as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Plumbing modifications taking place on the 1st, MEZ and CEL as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Structural modifications taking place on GRD and CEL as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Mezzanine6p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Plumbing modifications taking place on the 1st, MEZ and CEL as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
General construction taking place on the 1st floor and MEZ as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Mechanical modifications taking place on 1st floor and MEZ as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Cellar4p · 3 filings · 10 docs
ArchitectureMechanicalPlumbing
Plumbing modifications at cellar level as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Mechanical modifications taking place for ventilation system as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
General construction taking place on the 1st floor and MEZ as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets