Elevator apt, semi-fireproof without stores
Plaza West L.L.C
444 WEST 35 STREET · Chelsea-Hudson Yards · BIN 1077350
💬 Discuss this project
1989Year Built
17Stories
D1Building Class
R8AZoning
64,449 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMP
Elevator apt, semi-fireproof without stores · Owner of record: 434 WEST 35 ST CO · 9,812 sf lot · 6.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentCivilGeneral
Roof1p · 1 filing · 20 docs
Site & exterior16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLAZA WEST703/21/2026
309 EAST 45TH ST603/21/2026
ROCKROSE DEVELOPMENT403/21/2026
PLAZA WEST LLC C O ROCKROSE203/21/2026
434 WEST 35 ST CO103/22/2026
EMPIRE SCAFFOLDING SYSTEM103/21/2026
340 EAST 34TH STREET103/21/2026
440 W 34TH STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HS DESIGN STUDIO203/21/2026
RIGHT WAY SERVICES NYC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor1503/21/2026
DJM NYC, LLCGeneral Contractor504/09/2026
GREGORY PAPANTONIOUElectrical203/21/2026
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor207/08/2026
CESAR QUERYElectrical103/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841209/11/2024
JOSE M. LANDAURO3500309/11/2024
Building Lifecycle
All (87)Filed (9)Permit Issued (13)Signed Off (4)Facade (FISP) (12)Violation (33)Objection (10)Special Inspection (6)
01/13/2026
Signed off — Alteration
Facade restoration work, including replacement of weep holes, cutting and pointing of brick masonry joints, brick masonry repairs, etc. as shown on plans s filed herewith. No change in use, egress or occupancy
M00490200-I1
01/08/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01085271-I1
11/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01077716-I1
08/15/2025
Permit issued — General Construction
M00490200-I1-GC
08/04/2025
Permit issued — Suspended Scaffold
M01085271-I1-SC
06/27/2025
Permit issued — Sidewalk Shed
M01077716-I1-SH
01/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01077716-P2
10/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00547083-I1
10/04/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01077716-P1
10/03/2024
Objection resolved — Addressed
09/26/2024
Violation issued (ECB, closed)
Construction
09/23/2024
Objection raised — Scope
09/11/2024
Filed — Alteration
Facade restoration work, including replacement of weep holes, cutting and pointing of brick masonry joints, brick masonry repairs, etc. as shown on plans s filed herewith. No change in use, egress or occupancy
M00490200-P2
09/06/2024
Special inspection requirement — Masonry
JOSE LANDAURO
09/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
ROBERT MASONE
09/06/2024
Special inspection requirement — Final
JOSE LANDAURO
08/29/2024
Filed — Alteration
Facade restoration work, including replacement of weep holes, cutting and pointing of brick masonry joints, brick masonry repairs, etc. as shown on plans s filed herewith. No change in use, egress or occupancy
M00490200-P1
08/21/2024
Permit issued — General Construction
M00490200-I1-GC
08/07/2024
Permit issued — Suspended Scaffold
M01085271-I1-SC
08/02/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01085271-I1
08/02/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
JONATHAN CRUICKSHANKS
07/31/2024
Special inspection requirement — Masonry
JOSE LANDAURO
07/31/2024
Special inspection requirement — Final
JOSE LANDAURO
07/12/2024
Permit issued — Sidewalk Shed
M01077716-I1-SH
07/11/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01077716-I1
06/07/2024
Cycle 9 facade report signed — SWARMP
03/04/2024
Violation issued (HPD, closed)
C
02/20/2024
Cycle 9 facade report submitted
01/22/2024
Cycle 9 facade inspection completed
10/19/2023
Permit issued — Sidewalk Shed
M00547083-I1-SH
09/20/2022
Permit issued — Sidewalk Shed
M00547083-I1-SH
08/13/2022
Permit issued — General Construction
M00490200-I1-GC
09/20/2021
Permit issued — Sidewalk Shed
M00547083-I1-SH
09/01/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00547083-P1
08/20/2021
Permit issued — General Construction
M00490200-I1-GC
07/13/2021
Permit issued — General Construction
M00490200-I1-GC
06/29/2021
Permit issued — Sidewalk Shed
M00547083-I1-SH
06/28/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00547083-I1
05/18/2021
Objection resolved — Addressed
05/18/2021
Objection resolved — Addressed
04/23/2021
Objection resolved — Addressed
04/23/2021
Objection resolved — Addressed
04/19/2021
Objection raised — Other
04/19/2021
Objection raised — Other
04/19/2021
Objection raised — Other
04/19/2021
Objection raised — Other
04/12/2021
Filed — Alteration
Facade restoration work, including replacement of weep holes, cutting and pointing of brick masonry joints, brick masonry repairs, etc. as shown on plans s filed herewith. No change in use, egress or occupancy
M00490200-I1
10/25/2019
Violation issued (HPD, closed)
I
02/14/2019
Cycle 8 facade report submitted
02/11/2019
Cycle 8 facade report signed — SAFE
01/24/2019
Cycle 8 facade inspection completed
10/10/2018
Violation issued (HPD, closed)
I
08/08/2014
Violation issued (ECB, closed)
Construction
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/04/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/04/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/05/2013
Violation issued (ECB, closed)
Construction
02/21/2013
Cycle 7 facade report submitted
02/12/2013
Cycle 7 facade report signed — SWARMP
02/07/2013
Cycle 7 facade inspection completed
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/15/2025
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT08/04/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/27/2025
DOB NOWGeneral ConstructionSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/21/2024
DOB NOWSuspended ScaffoldPermit IssuedCENTRAL CONSTRUCTION MGMT08/07/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC07/12/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/19/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/20/2022
DOB NOWGeneral ConstructionSigned-offDJM NYC, LLC08/13/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/20/2021
DOB NOWGeneral ConstructionSigned-offDJM NYC, LLC08/20/2021
DOB NOWGeneral ConstructionSigned-offDJM NYC, LLC07/13/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC06/29/2021
BISOTISSUEDKING ROSE OF NY, INC11/16/2017
BISOTISSUEDKING ROSE OF NY, INC11/16/2017
BISOTISSUEDKING ROSE OF NY, INC12/13/2016
BISOTISSUEDKING ROSE OF NY, INC12/12/2016
BISEQISSUEDARSENAL SCAFFOLD INC06/04/2014
BISOTISSUEDRCD RESTORATIONS INC05/21/2014
BISOTISSUEDRCD RESTORATIONS INC09/11/2013
BISEQISSUEDARSENAL SCAFFOLD INC06/21/2013
BISOTISSUEDRCD RESTORATIONS INC06/18/2013
BISOTISSUEDRCD RESTORATIONS INC05/15/2013
BISEQISSUEDARSENAL SCAFFOLD INC05/01/2013
BISOTISSUEDRCD RESTORATIONS INC08/10/2007
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM08/01/2007
BISMHISSUEDCIPRIETTI-TOLISANO BUILDERS12/22/2003
BISEQISSUEDSPRING SCAFFOLDING04/07/2003
BISEQISSUEDSPRING SCAFFOLDING04/03/2003
BISOTISSUEDYORK RESTORATION CORP12/17/2002
BISEQISSUEDSPRING SCAFFOLDING10/08/2002
BISEQISSUEDSPRING SCAFFOLDING10/08/2002
BISOTISSUEDYORK RESTORATION CORP10/03/2002
BISOTISSUEDDJM CONTRACITNG CORP05/29/2001
BISEQISSUEDWEST NEW YORK RESTORATION07/19/2000
BISEQISSUEDWEST NEW YORK RESTORATION, INC.07/12/2000
BISOTRE-ISSUEDRCD RESTORATIONS INC06/29/2000
BISOTISSUEDBASONAS CONSTRUCTION CORP06/20/2000
2 projects · most recent 01/03/2025
FiledStatusContractorScope
01/03/2025CompleteBOROWIDE ELECT'L CONTR'S—
05/21/2021CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/06/2024MasonryJOSE LANDAUROspecial
09/06/2024Tenant Protection Plan ComplianceROBERT MASONEspecial
09/06/2024FinalJOSE LANDAUROprogress
08/02/2024Alternative Materials - OTCR Buildings Bulletin NumberJONATHAN CRUICKSHANKSspecial
07/31/2024MasonryJOSE LANDAUROspecial
07/31/2024FinalJOSE LANDAUROprogress
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026M00490200-P1Request digital key ↗
09/03/2026M00547083-I1Request digital key ↗
09/03/2026M00547083-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION11
11/20/2017122826503Open ↗
11/20/2017122826503Open ↗
12/19/2016122826503Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
10/11/2016122826503Open ↗
10/11/2016122826503Open ↗
06/19/2013121525590Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit3
08/13/2026M00490200-P2Open ↗
08/13/2026M00490200-P1Open ↗
08/13/2026M00490200-I1Open ↗
▸Seals & Professional Certifications26
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
02/23/2018122826503Open ↗
02/23/2018122826503Open ↗
12/22/2016122826503Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00547083-P1Open ↗
09/03/2026M00547083-I1Open ↗
08/26/2026M01085271-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M01085271-I1Open ↗
08/27/2026M00490200-P1Open ↗
08/24/2026M00490200-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026M00490200-P1Open ↗
08/24/2026M00490200-P2Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/22/2013121525590Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/22/2013121525590Open ↗
▸Safety & Tenant Protection14
▸DOB NOWHPD-1: Anti-Harassment Area Checklist8
09/03/2026M00547083-I1Open ↗
09/03/2026M00547083-P1Open ↗
08/13/2026M00490200-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWCertificate of No Harassment3
08/13/2026M00490200-P1Open ↗
08/13/2026M00490200-I1Open ↗
08/13/2026M00490200-P2Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
11/01/2016122826503Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
04/16/2013121575054Open ↗
▸BISTenant Protection Plan and Notes1
10/11/2016122826503Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M00490200-P2Open ↗
08/13/2026M00490200-I1Open ↗
08/13/2026M00490200-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/22/2013121525590Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/28/2013121575054Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/23/2018122826503Open ↗
12/22/2016122826503Open ↗
10/11/2016122826503Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/23/2018122826503Open ↗
09/18/2014121575054Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/18/2014121575054Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/01/2016122826503Open ↗
10/09/2014121525590Open ↗
06/18/2014121525590Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTransit Authority Approval3
08/13/2026M00490200-I1Open ↗
08/13/2026M00490200-P1Open ↗
08/13/2026M00490200-P2Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/23/2018122826503Open ↗
10/09/2014121525590Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/22/2013121525590Open ↗
03/28/2013121575054Open ↗
▸BISSUPERSEDING LETTER1
06/06/2014121575054Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
05/06/2013121525590Open ↗
▸BISSHED LETTER1
07/24/2013121525590Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
02/23/2018122826503Open ↗
10/11/2016122826503Open ↗
10/11/2016122826503Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
10/11/2016122826503Open ↗
10/11/2016122826503Open ↗
04/22/2013121525590Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
12/22/2016122826503Open ↗
06/19/2013121525590Open ↗
▸BISBOROUGH INTAKE FORM1
02/23/2018122826503Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01085271-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01085271-I1Open ↗