← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Fifth Avenue Tower
445 5TH AVENUE · BIN 1017603
💬 Discuss this project
1986Year Built
33Stories
RMBuilding Class
C5-3Zoning
208,968 sfGross Floor Area
185Units
LL97 CoveredRent Stabilized8 Active Violations 7 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Fifth Ave Condo - B.H.S. Management (445) · 13,350 sf lot · 15.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFifth Avenue Tower Condominium4p · 1 filing · 4 docs
Floor 9Unit 9F2p · 1 filing · 6 docs
Floor 8Arcus FDN & Stream Line Circle58p · 6 filings · 20 docs
Floor 7Arcus FDN & Stream Line Circle53p · 6 filings · 20 docs
Floor 6HVAC system modification, cellar and 3rd-6th floors33p · 3 filings · 20 docs
Floor 5HVAC system modification, cellar and 3rd-6th floors33p · 3 filings · 20 docs
Floor 4HVAC system modification, cellar and 3rd-6th floors33p · 3 filings · 20 docs
Floor 3HVAC system modification, cellar and 3rd-6th floors33p · 3 filings · 20 docs
Floor 213p · 25 filings · 20 docs
Floor 1445 Fifth Office Holdings, Brickworks New York Design Studio13p · 15 filings · 20 docs
CellarBrickworks New York Design Studio77p · 7 filings · 20 docs
Site & exteriorBrickworks New York Design Studio22p · 13 filings · 20 docs
Filed — no permit issuedFacade repairs, spandrel cover replacement, gasket restorati4p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Church Pension Group SV5803/21/2026
Thor 445 Fifth Avenue5103/21/2026
Fifth Ave Tower Condo1603/21/2026
401 East 89th Street Owners807/08/2026
445 5th Ave Retail Partners603/21/2026
445 Fifth Ave Associates603/21/2026
Datedivco203/21/2026
Thor Equities203/21/2026
445 5th Ave203/21/2026
Transbeam103/21/2026
Blumberg & Freilich Equities103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Plant ConstructionGeneral Contractor2007/08/2026
Benchmark BuildersGeneral Contractor1307/08/2026
CS BridgeScaffold707/08/2026
Plant ConstructionScaffold507/08/2026
Skyline Restorationspecialty_contractor507/08/2026
Par Plumbing Co., Inc.oFire Protection403/21/2026
National MaintenanceSign hanger407/08/2026
Idl Contracting ServicesGeneral Contractor407/08/2026
Orbit SprinklerFire Protection407/08/2026
L&K PartnersGeneral Contractor403/21/2026
HK RemodelingGeneral Contractor307/08/2026
Pro Star Plumbing, Heating & MechanicalPlumbing307/08/2026
Clune Construction CoGeneral Contractor207/08/2026
Illuminous ElectricElectrical203/21/2026
A&A PlumbingPlumbing207/08/2026
RX ElectricElectrical203/22/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
Metro Fire ProtectionFire Protection107/08/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
R.J.C. MechanicalPlumbing107/08/2026
Bestco General Electric MaintenanceElectrical103/21/2026
William C. Gerakaris P&HPlumbing107/08/2026
Crocitto, Jr., WilliamElectrical103/21/2026
Campbell & Dawes Ltd ElectricElectrical103/21/2026
Applied ElectricElectrical103/21/2026
J.A. Lee Electric ServicesElectrical103/22/2026
L.E.A. ElectricElectrical103/22/2026
Paul's ElectricElectrical103/22/2026
RND ElectricElectrical103/22/2026
Foster Electrical ServiceElectrical103/21/2026
Asko Electric Construction & MaintenanceElectrical103/21/2026
?Suk Young KimElectrical103/21/2026
Omara OrganizationScaffold107/08/2026
Going Sign & Servicing CoSign hanger107/08/2026
Aggressive Fire ProtectionFire Protection107/08/2026
Anesis ServicesFire Protection107/08/2026
DPH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sag Engineering & Consulting608109/24/2026
Seth P Roye Architect8554109/24/2026
Eti Consultants76943012/15/2025
Demerara Engineering, PLL4248406/06/2025
Anthony Morali Architect4810202/17/2023
Michael Scaduto Architect4833203/22/2022
AK Engineering678310/06/2021
Building Lifecycle
All (300)Filed (80)Permit Issued (66)Signed Off (20)Facade (FISP) (3)Violation (18)Inspection (18)Objection (65)Special Inspection (30)
10/06/2026
Objection raised — Fire_Protection
10/06/2026
Objection raised — Other
10/02/2026
Filed — No Work
M01465484-I1
10/02/2026
Objection resolved — Addressed
10/02/2026
Objection resolved — Addressed
10/02/2026
Objection resolved — Addressed
10/02/2026
Objection resolved — Addressed
09/30/2026
Objection raised — Fire_Protection
09/30/2026
Objection raised — Fire_Protection
09/30/2026
Objection raised — Inspections
09/30/2026
Objection raised — Other
09/28/2026
Filed — No Work
M01465478-I1
09/24/2026
Filed — Alteration
Facade repairs as per plans including replacement of damaged decorative spandrel covers, and restoration of glazing gaskets and sealants. No change to use, egress, or occupancy.
M01452922-I1
09/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
Chester Kowalski
09/03/2026
Filed — Alteration
facade inspection
M01455302-I1
08/28/2026
Filed — No Work
M01447796-I1
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Seth Roye
08/28/2026
Special inspection requirement — Final
Seth Roye
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Seth Roye
08/07/2026
Signed off — Alteration
Installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application
M00514171-I1
07/09/2026
Filed — No Work
M01427314-I1
06/12/2026
Objection resolved — Addressed
06/12/2026
Objection resolved — Addressed
06/09/2026
Objection raised — Admin
06/09/2026
Objection raised — Other
06/04/2026
Filed — No Work
M01406594-I1
06/04/2026
Filed — No Work
M01411387-I1
05/15/2026
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
M00952758-I1
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
02/13/2026
Filed — No Work
M01351233-I1
02/04/2026
Signed off — Alteration
M00752787-I1
02/02/2026
Signed off — Alteration
Removal of interior non-load bearing partitions, ceilings, millwork, etc throughout space as per plans filed herewith. No change in use, occupancy or egress
M00952561-I1
01/30/2026
Signed off — Alteration
Modification to existing HVAC system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
M00752850-I1
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
ANTHONY MUSUMECI
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY MUSUMECI
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MUSUMECI
12/16/2025
Special inspection requirement — Final
ANTHONY MUSUMECI
12/15/2025
Filed — Alteration
Removal of interior non-load bearing partitions, ceilings, millwork, etc throughout space as per plans filed herewith. No change in use, occupancy or egress
M00952561-P2
12/10/2025
Filed — No Work
M01328080-I1
12/09/2025
Permit issued — Mechanical Systems
M00952758-I1-MS
12/04/2025
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
M00952758-P2
12/04/2025
Special inspection requirement — Maintenance information
ANTHONY MUSUMECI
12/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY MUSUMECI
12/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY MUSUMECI
12/04/2025
Special inspection requirement — Mechanical Systems
ANTHONY MUSUMECI
12/04/2025
Special inspection requirement — Shutoff dampers
ANTHONY MUSUMECI
12/04/2025
Special inspection requirement — Final
ANTHONY MUSUMECI
12/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY MUSUMECI
12/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
ANTHONY MUSUMECI
11/25/2025
Permit issued — General Construction
M00952561-I1-GC
11/13/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01150366-I1
11/13/2025
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01150370-I1
11/13/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01252391-I1
11/05/2025
Special inspection requirement — Final
ANTHONY MUSUMECI
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPlant Construction12/09/2025
DOB NOWGeneral ConstructionSigned-offPlant Construction11/25/2025
DOB NOWGeneral ConstructionSigned-offPlant Construction09/22/2025
DOB NOWSupported ScaffoldSigned-offCS Bridge07/10/2025
DOB NOWSidewalk ShedPermit IssuedPlant Construction06/17/2025
DOB NOWConstruction FencePermit IssuedPlant Construction06/17/2025
DOB NOWGeneral ConstructionSigned-offPlant Construction04/11/2025
DOB NOWSprinklersSigned-offOrbit Sprinkler04/02/2025
DOB NOWMechanical SystemsSigned-offPlant Construction03/27/2025
DOB NOWMechanical SystemsSigned-offL&K Partners02/05/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating01/09/2025
DOB NOWGeneral ConstructionSigned-offPlant Construction12/24/2024
DOB NOWMechanical SystemsSigned-offPlant Construction12/22/2024
DOB NOWSidewalk ShedSigned-offCS Bridge12/13/2024
DOB NOWConstruction FenceSigned-offCS Bridge12/13/2024
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H11/19/2024
DOB NOWSignPermit IssuedPolsinelli, Henry11/18/2024
DOB NOWGeneral ConstructionSigned-offL&K Partners11/15/2024
DOB NOWMechanical SystemsSigned-offPlant Construction10/16/2024
DOB NOWGeneral ConstructionSigned-offPlant Construction10/16/2024
DOB NOWSprinklersSigned-offOrbit Sprinkler10/10/2024
DOB NOWPlumbingSigned-offA&A Plumbing09/10/2024
DOB NOWConstruction FencePermit IssuedPlant Construction07/17/2024
DOB NOWSidewalk ShedPermit IssuedPlant Construction07/17/2024
DOB NOWGeneral ConstructionSigned-offPlant Construction05/07/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating01/16/2024
DOB NOWSprinklersSigned-offOrbit Sprinkler01/16/2024
DOB NOWMechanical SystemsSigned-offPlant Construction01/09/2024
DOB NOWGeneral ConstructionSigned-offPlant Construction01/09/2024
DOB NOWGeneral ConstructionSigned-offPlant Construction11/14/2023
DOB NOWMechanical SystemsSigned-offPlant Construction11/14/2023
DOB NOWPlumbingPermit IssuedR.J.C. Mechanical09/06/2023
DOB NOWMechanical SystemsSigned-offPlant Construction06/06/2023
DOB NOWGeneral ConstructionSigned-offPlant Construction06/02/2023
DOB NOWSprinklersSigned-offOrbit Sprinkler05/31/2023
DOB NOWPlumbingPermit IssuedDPH Plumbing & Heating04/19/2023
DOB NOWGeneral ConstructionPermit IssuedIdl Contracting Services03/28/2023
DOB NOWGeneral ConstructionPermit IssuedIdl Contracting Services03/15/2023
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/16/2023
DOB NOWGeneral ConstructionSigned-offSkyline Restoration12/16/2022
+ 60 more permits on file
2 projects · most recent 02/17/2023
Water/Sanitary Storm
FiledStatusContractorScope
02/17/2023Permit IssuedGreat Oaks MechanicalWater/Sanitary
10/29/2021Signed-offPro Star Plumbing & Heating & MechanicalStorm, Water/Sanitary
22 projects · most recent 07/23/2025
General Wiring
FiledStatusContractorScope
07/23/2025CompleteRX ElectricGeneral Wiring
08/23/2024CompleteRX Electric—
08/13/2024CompleteL.E.A. ElectricGeneral Wiring
01/18/2024CompleteApollo Electric USA—
08/04/2023Permit IssuedCentennial Elevator IndustriesGeneral Wiring
06/06/2023CompleteApollo Electric USAGeneral Wiring
06/06/2023CompleteApollo Electric USA—
04/27/2023Permit IssuedThe Metro Group ElectricGeneral Wiring
04/18/2023Permit IssuedPaul's ElectricGeneral Wiring
03/16/2023CompleteThe Metro Group ElectricGeneral Wiring
10/27/2022Permit IssuedRobert Chimenti11 meters, 1 new_meters
06/03/2022CompleteDennison ElectricGeneral Wiring
10/20/2021CompleteAllstate Electrical ContGeneral Wiring
09/09/2021CompleteL.E.A. ElectricGeneral Wiring
03/15/2021CompleteInnovative Electric of NYGeneral Wiring
2 projects · most recent 07/17/2024
Fence Sidewalk Shed
FiledStatusContractorScope
07/17/2024Permit IssuedPlant ConstructionFence
07/17/2024Permit IssuedPlant ConstructionSidewalk Shed
1 project · most recent 09/03/2026
FiledStatusContractorScope
09/03/2026———
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
10/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/22/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/17/2026Tenant Protection Plan ComplianceChester Kowalskispecial
08/28/2026Energy Code Compliance InspectionsSeth Royeprogress
08/28/2026FinalSeth Royeprogress
08/28/2026Fire-Resistant Penetrations and JointsSeth Royespecial
12/16/2025Tenant Protection Plan ComplianceANTHONY MUSUMECIspecial
12/16/2025Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
12/16/2025Fire-Resistance Rated ConstructionANTHONY MUSUMECIprogress
12/16/2025FinalANTHONY MUSUMECIprogress
12/04/2025HVAC-R and service water heating system controlsANTHONY MUSUMECIenergy_progress
12/04/2025Shutoff dampersANTHONY MUSUMECIenergy_progress
12/04/2025HVAC-R and service water piping design and insulationANTHONY MUSUMECIenergy_progress
12/04/2025Maintenance informationANTHONY MUSUMECIenergy_progress
12/04/2025FinalANTHONY MUSUMECIprogress
12/04/2025Mechanical SystemsANTHONY MUSUMECIspecial
12/04/2025Tenant Protection Plan ComplianceANTHONY MUSUMECIspecial
12/04/2025HVAC-R and service water heating equipmentANTHONY MUSUMECIenergy_progress
11/05/2025HVAC-R and service water heating system controlsANTHONY MUSUMECIenergy_progress
11/05/2025Shutoff dampersANTHONY MUSUMECIenergy_progress
11/05/2025HVAC-R and service water heating equipmentANTHONY MUSUMECIenergy_progress
11/05/2025Maintenance informationANTHONY MUSUMECIenergy_progress
11/05/2025FinalANTHONY MUSUMECIprogress
11/05/2025Fire-Resistance Rated ConstructionANTHONY MUSUMECIprogress
11/05/2025Mechanical SystemsANTHONY MUSUMECIspecial
11/05/2025Tenant Protection Plan Compliance—special
11/05/2025FinalANTHONY MUSUMECIprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
445 Fifth Office HoldingsBase Building / Common AreasFloor 1
Project M00752787 Alteration · LOC Issued · 07/05/2022
Arcus FDN & Stream Line CircleOfficeFloors 7, 8
Project M00514207 Alteration · LOC Issued · 06/30/2021
Project M00514202 Alteration · LOC Issued · 06/29/2021
Project M00514171 Alteration · LOC Issued · 06/28/2021
Project M00459780 Alteration · LOC Issued · 02/03/2021
Project M00459802 Alteration · LOC Issued · 02/02/2021
Project M00459854 Alteration · LOC Issued · 02/02/2021
Brickworks New York Design StudioRetailCellar, Floors 1, 2
Project M00476432 Alteration · LOC Issued · 04/21/2021
Project M00476464 Alteration · LOC Issued · 04/21/2021
Project M00476480 Alteration · LOC Issued · 04/21/2021
Project M00476496 Alteration · LOC Issued · 04/21/2021
Project M00380210 Alteration · LOC Issued · 08/10/2020
Project M00380249 Alteration · Permit Entire · 08/10/2020
Project M00380279 Alteration · LOC Issued · 08/10/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,159 on file (BIS + DOB NOW)
▸Plans & Drawings103
▸DOB NOWPlans/Sketch43
10/04/2026M01452922-I1Request digital key ↗
10/04/2026M01455302-I1Request digital key ↗
09/03/2026M00514202-I1Request digital key ↗
Showing 3 of 43 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly41
10/13/2026M01447796-I1Request digital key ↗
10/04/2026M01465484-I1Request digital key ↗
09/03/2026M00634603-I1Request digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00380249-I1Request digital key ↗
09/04/2026M00459854-I1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/03/2026M00476480-I1Request digital key ↗
09/03/2026M00476432-I1Request digital key ↗
09/03/2026M00476464-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/04/2026M00380279-P1Request digital key ↗
09/04/2026M00380279-I1Request digital key ↗
09/04/2026M00459854-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00380210-I1Request digital key ↗
09/04/2026M00459802-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00426909-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00426903-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00459780-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00449997-I1Request digital key ↗
▸Applications & Permits160
▸BISPLAN / WORK APPROVAL APPLICATION100
06/14/2022140894361Open ↗
09/28/2021140934096Open ↗
01/11/2021140996830Open ↗
Showing 3 of 100 on file for this type
▸BISWORK PERMIT APPLICATION60
02/02/2021140996830Open ↗
12/18/2020140941319Open ↗
12/02/2020140970297Open ↗
Showing 3 of 60 on file for this type
▸Seals & Professional Certifications394
▸DOB NOWDPL-1: Design Professional Seal & Signature102
10/13/2026M01447796-I1Open ↗
10/04/2026M01465478-I1Open ↗
10/04/2026M01452922-I1Open ↗
Showing 3 of 102 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION96
05/18/2020140893996Open ↗
09/09/2019122963230Open ↗
09/09/2019122963230Open ↗
Showing 3 of 96 on file for this type
▸DOB NOWProgress Inspector Seal & Signature86
10/05/2026M01452922-I1Open ↗
10/05/2026M01452922-I1Open ↗
10/02/2026M00476480-I1Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature52
10/05/2026M01452922-I1Open ↗
10/05/2026M01452922-I1Open ↗
09/23/2026M00514207-I1Open ↗
Showing 3 of 52 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
01/11/2021140996830Open ↗
03/30/2020140893996Open ↗
Showing 2 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
01/11/2021140996830Open ↗
10/29/2020140970297Open ↗
03/30/2020140893996Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
01/11/2021140996830Open ↗
03/30/2020140893996Open ↗
Showing 2 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
10/29/2020140970297Open ↗
09/03/2020140941319Open ↗
08/12/2020140934096Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment62
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
07/27/2018122963230Open ↗
Showing 1 of 18 on file for this type
▸BISEQUIPMENT USE PERMITS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection20
▸BISTENANT PROTECTION PLAN AND NOTES8
10/29/2020140970297Open ↗
09/03/2020140941319Open ↗
08/12/2020140934096Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan6
09/04/2026M00380279-P1Open ↗
Showing 1 of 6 on file for this type
▸BISDS1-Demolition Submittal Certification Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
05/04/2021140996830Open ↗
▸Environmental & Asbestos81
▸DOB NOWDEP ACP-5: Asbestos Assessment Report44
10/04/2026M01452922-I1Open ↗
09/04/2026M00380279-I1Open ↗
09/04/2026M00380279-P1Open ↗
Showing 3 of 44 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
10/29/2020140970297Open ↗
09/03/2020140941319Open ↗
08/12/2020140934096Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance61
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
08/27/2019122963230Open ↗
08/27/2019122963230Open ↗
08/19/2019122963230Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
12/01/2021140934096Open ↗
12/01/2021140970297Open ↗
11/30/2021140934096Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
12/02/2021140934096Open ↗
12/02/2021140934096Open ↗
12/01/2021140934096Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/29/2020140970297Open ↗
03/30/2020140893996Open ↗
Showing 2 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00514202-I1Open ↗
Showing 1 of 3 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
09/03/2020140941319Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/15/2022123866619Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY33
12/01/2021140934096Open ↗
12/01/2021140934096Open ↗
12/01/2021140970297Open ↗
Showing 3 of 33 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/15/2022123866619Open ↗
▸BISMECHANICAL SYSTEMS1
04/15/2022123866619Open ↗
▸Approvals, Objections & Sign-offs81
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter30
09/04/2026M00459854-I1Open ↗
09/03/2026M00514202-I1Open ↗
09/03/2026M00514202-P1Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
04/18/2022123866619Open ↗
12/02/2021140970297Open ↗
12/02/2021140934096Open ↗
Showing 3 of 28 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
04/18/2022123866619Open ↗
07/24/2020140894361Open ↗
05/04/2020123866619Open ↗
Showing 3 of 8 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
07/12/2018122963230Open ↗
▸BISFINAL1
04/15/2022123866619Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
03/29/2019123861348Open ↗
▸Cost, Insurance & Ownership70
▸BISCOST AFFIDAVIT66
11/30/2021140934096Open ↗
10/14/2021140941319Open ↗
12/15/2020140893996Open ↗
Showing 3 of 66 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
04/15/2022123866619Open ↗
12/01/2021140934096Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
04/06/2020123866619Open ↗
▸Filing & Intake Forms84
▸BISEFILING COVER SHEET33
05/04/2020123866619Open ↗
04/24/2020123866619Open ↗
04/20/2020123866619Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION28
10/12/2021140934096Open ↗
12/04/2020140941319Open ↗
11/30/2020140970297Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
01/11/2021140996830Open ↗
10/29/2020140970297Open ↗
09/03/2020140941319Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM11
05/18/2020140893996Open ↗
09/09/2019122963230Open ↗
09/09/2019122963230Open ↗
Showing 3 of 11 on file for this type
▸Other Documents6
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
12/04/2020140941319Open ↗
10/09/2020140941319Open ↗
03/30/2020140893996Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
03/29/2019123861348Open ↗
▸DOB NOWIRA Certification1
10/04/2026M01455302-I1Open ↗