Condo, commercial tower (mixed-use) [derived]
The High Line Hotel
180 10 AVENUE · BIN 1088996
💬 Discuss this project
1931Year Built
8Stories
RCBuilding Class
R7BZoning
106,206 sfGross Floor Area
3Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Condo, commercial tower (mixed-use) [derived] · 25,259 sf lot · 4.2 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction39p · 4 filings · 20 docs
Floor 4Under Construction10p · 1 filing · 15 docs
Floor 3Under Construction10p · 1 filing · 15 docs
Floor 2Under Construction22p · 2 filings · 20 docs
Floor 1Under Construction9p · 1 filing · 19 docs
CellarUnder Construction38p · 4 filings · 20 docs
Sub-BasementUnder Construction15p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VANDERBILT UNIVERSITY4209/13/2026
TOPLINE NYC CONTRACTING607/08/2026
HIGHLINE HOTEL LLC C O BRODSKY303/21/2026
180 TENTH AVENUE CONDOMINIUM ASS703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC405/21/2026
LORING CONSULTING ENGINEERS, INC.805/04/2026
SILMAN105/01/2026
BEYER BLINDER BELLE803/04/2026
ASHRAF CORP301/15/2026
MOHAMMAD AHEAD, PE105/30/2022
SYED ENGINEERING, P.C.109/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2803/21/2026
Rigid Structural Design, LLC803/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOVA CONSTRUCTION SERVICEGeneral Contractor908/27/2026
CONSIGLI CONSTRUCTION COGeneral Contractor704/09/2026
A & M WARSHAW PLBG & HTGPlumbing407/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor207/08/2026
MAGIC MECHANICAL INCFire Protection107/08/2026
RICHARD NEUElectrical103/22/2026
JOHN DELUCAElectrical103/21/2026
DELUCA JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6871205/04/2026
Building Lifecycle
All (143)Filed (26)Permit Issued (22)Signed Off (1)Violation (57)Inspection (5)Objection (4)Special Inspection (28)
08/26/2026
Permit issued — Sidewalk Shed
M01391285-I1-SH
08/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
RICHARD GREENWALD
05/29/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2026
Permit issued — Sidewalk Shed
M01391285-I1-SH
05/21/2026
Filed — Alteration
Installation of a temporary heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01391285-I1
05/14/2026
Permit issued — Plumbing
M01328134-S2-PL
05/13/2026
Permit issued — Plumbing
M01328133-S2-PL
05/04/2026
Filed — Alteration
WHITE HALL - REMOVAL AND INSTALLATION OF SPRINKLER HEADS.
M01328133-S2
05/04/2026
Filed — Alteration
LORILLARD HALL - MODIFICATION OF HVAC.
M01328134-S2
05/01/2026
Filed — Alteration
HOFFMAN HALL - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01328136-S3
04/24/2026
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01355027-P1
04/10/2026
Permit issued — General Construction
M01291894-I1-GC
04/10/2026
Permit issued — General Construction
M01291891-I1-GC
04/09/2026
Permit issued — General Construction
M01291897-I1-GC
03/25/2026
Filed — Alteration
Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01376271-I1
03/25/2026
Permit issued — Protection and Mechanical Methods
M01376271-I1-PMM
03/16/2026
Permit issued — Plumbing
M01328136-S2-PL
03/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
RICHARD GREENWALD
03/12/2026
Special inspection requirement — Preliminary
RICHARD GREENWALD
03/12/2026
Special inspection requirement — Final
RICHARD GREENWALD
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
03/11/2026
Special inspection requirement — Concrete - Cast-In-Place
RICHARD GREENWALD
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
RICHARD GREENWALD
03/04/2026
Filed — Alteration
HOFFMAN HALL - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01328136-P1
02/19/2026
Permit issued — Plumbing
M01331478-I1-PL
02/19/2026
Violation issued (FDNY_NOV, closed)
02/18/2026
Permit issued — Sprinklers
M01331478-S1-EW-SP
02/17/2026
Permit issued — General Construction
M01328134-I1-GC
02/10/2026
Permit issued — Mechanical Systems
M01328133-S1-MS
02/10/2026
Permit issued — Mechanical Systems
M01328136-S1-MS
02/10/2026
Permit issued — Mechanical Systems
M01328134-S1-MS
02/10/2026
Permit issued — General Construction
M01328133-I1-GC
02/10/2026
Permit issued — General Construction
M01328136-I1-GC
02/06/2026
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01355027-I1
02/06/2026
Permit issued — Protection and Mechanical Methods
M01355027-I1-PMM
01/29/2026
Special inspection requirement — Footing and Foundation
RICHARD GREENWALD
01/29/2026
Special inspection requirement — Final
RICHARD GREENWALD
01/24/2026
Filed — Alteration
EDSON HALL - MODIFICATION AND INSTALLATION OF SPRINKLER HEADS.
M01331478-S1
01/24/2026
Filed — Alteration
HOFFMAN HALL - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01328136-S1
01/24/2026
Filed — Alteration
WHITE HALL - REMOVAL AND INSTALLATION OF SPRINKLER HEADS.
M01328133-S1
01/24/2026
Filed — Alteration
LORILLARD HALL - MODIFICATION OF HVAC.
M01328134-S1
01/23/2026
Filed — Alteration
EDSON HALL - MODIFICATION AND INSTALLATION OF SPRINKLER HEADS.
M01331478-I1
01/23/2026
Filed — Alteration
HOFFMAN HALL - REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01328136-S2
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
01/21/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
01/15/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01333040-P1
01/13/2026
Objection resolved — Addressed
01/13/2026
Objection resolved — Addressed
01/09/2026
Permit issued — Supported Scaffold
M01338894-I1-SF
01/08/2026
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01338894-I1
01/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
RICHARD GREENWALD
01/02/2026
Objection raised — Admin
01/02/2026
Objection raised — Admin
12/17/2025
Permit issued — Sidewalk Shed
M01333040-I1-SH
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedNOVA CONSTRUCTION SERVICE08/26/2026
DOB NOWSidewalk ShedPermit IssuedNOVA CONSTRUCTION SERVICE05/27/2026
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG05/14/2026
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG05/13/2026
DOB NOWGeneral ConstructionPermit IssuedNOVA CONSTRUCTION SERVICE04/10/2026
DOB NOWGeneral ConstructionPermit IssuedNOVA CONSTRUCTION SERVICE04/10/2026
DOB NOWGeneral ConstructionPermit IssuedNOVA CONSTRUCTION SERVICE04/09/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedNOVA CONSTRUCTION SERVICE03/25/2026
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG03/16/2026
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG02/19/2026
DOB NOWSprinklersPermit IssuedMAGIC MECHANICAL INC02/18/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO02/17/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO02/10/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO02/10/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO02/10/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO02/10/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO02/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedNOVA CONSTRUCTION SERVICE02/06/2026
DOB NOWSupported ScaffoldPermit IssuedNOVA CONSTRUCTION SERVICE01/09/2026
DOB NOWSidewalk ShedPermit IssuedNOVA CONSTRUCTION SERVICE12/17/2025
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING06/13/2022
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC CONTRACTING10/01/2021
BISSPISSUEDRAEL AUTOMATIC SPR.CO INC09/12/2017
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/29/2017
BISPLISSUEDPLUMBING NYC INC09/30/2016
BISSPISSUEDRAEL AUTOMATIC SPR.CO INC09/19/2016
BISOTISSUEDALLIANCE MECHANICAL GROUP08/01/2016
BISOTISSUEDNY TENT, LLC06/17/2016
BISMHISSUEDALLIANCE MECHANICAL GROUP03/01/2016
BISOTISSUEDSTAMFORD TENT & EQUIP CO05/27/2015
BISSPISSUEDUNIVERSAL FIRE SPR LLC12/08/2014
BISOTISSUEDSTAMFORD TENT & EQUIP CO11/12/2014
BISSPISSUEDUNIVERSAL FIRE SPR LLC11/18/2013
BISPLISSUEDMETROTECH MECHANICAL CORP07/26/2013
BISPLISSUEDMETROTECH MECHANICAL CORP01/31/2013
BISPLISSUEDMETROTECH MECHANICAL CORP01/14/2013
BISMHISSUEDMCCORMACK CONTRACTING INC.12/18/2012
BISOTISSUEDMCCORMACK CONTRACTING INC.12/18/2012
BISOTISSUEDMCCORMACK CONTRACTING INC.12/18/2012
BISOTISSUEDMCCORMACK CONTRACTING INC.12/06/2012
+ 11 more permits on file
1 project · most recent 01/24/2026
FiledStatusContractorScope
01/24/2026Permit IssuedMAGIC MECHANICAL INC34 heads
3 projects · most recent 05/04/2026
Water/Sanitary
FiledStatusContractorScope
05/04/2026Permit IssuedA & M WARSHAW PLBG & HTGWater/Sanitary
05/01/2026Permit IssuedA & M WARSHAW PLBG & HTGWater/Sanitary
01/24/2026Permit IssuedA & M WARSHAW PLBG & HTGWater/Sanitary
6 projects · most recent 02/27/2026
General Wiring
FiledStatusContractorScope
02/27/2026Permit IssuedTOP SHELF ELECTRIC CORP—
02/23/2026Permit IssuedNOVA ELECTRIC LLCGeneral Wiring
02/20/2026Permit IssuedNOVA ELECTRIC LLCGeneral Wiring
02/20/2026Permit IssuedNOVA ELECTRIC LLCGeneral Wiring
02/20/2026Permit IssuedNOVA ELECTRIC LLCGeneral Wiring
06/02/2022Permit IssuedRICHARD NEU—
1 project · most recent 05/01/2026
FiledStatusContractorScope
05/01/2026Permit IssuedA & M WARSHAW PLBG & HTG1 scope_items
3 projects · most recent 05/21/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
05/21/2026Permit IssuedNOVA CONSTRUCTION SERVICESidewalk Shed
01/15/2026Permit IssuedNOVA CONSTRUCTION SERVICESidewalk Shed
01/08/2026Permit IssuedNOVA CONSTRUCTION SERVICEScaffold
1 project · most recent 05/01/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
05/01/2026Permit IssuedA & M WARSHAW PLBG & HTGTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/29/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
06/03/2026Subsurface Investigations (Borings/Test Pits)RICHARD GREENWALDspecial
03/12/2026Tenant Protection Plan ComplianceRICHARD GREENWALDspecial
03/12/2026PreliminaryRICHARD GREENWALDprogress
03/12/2026FinalRICHARD GREENWALDprogress
03/11/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
03/11/2026Concrete - Cast-In-PlaceRICHARD GREENWALDspecial
03/11/2026Tenant Protection Plan ComplianceRICHARD GREENWALDspecial
01/29/2026Footing and FoundationRICHARD GREENWALDprogress
01/29/2026FinalRICHARD GREENWALDprogress
01/21/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
01/21/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
01/21/2026Post-installed AnchorsRICHARD GREENWALDspecial
01/21/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
01/08/2026Tenant Protection Plan ComplianceRICHARD GREENWALDspecial
12/16/2025Mechanical SystemsRICHARD GREENWALDspecial
12/16/2025FinalRICHARD GREENWALDprogress
12/16/2025Tenant Protection Plan ComplianceRICHARD GREENWALDspecial
12/16/2025Mechanical SystemsRICHARD GREENWALDspecial
12/16/2025FinalRICHARD GREENWALDprogress
12/16/2025FinalRICHARD GREENWALDprogress
12/16/2025Mechanical SystemsRICHARD GREENWALDspecial
12/09/2025Sprinkler SystemsRICHARD GREENWALDspecial
12/03/2025PreliminaryRICHARD GREENWALDprogress
12/03/2025FinalRICHARD GREENWALDprogress
09/23/2025PreliminaryRICHARD GREENWALDprogress
Latest 25 of 28.
▾Documents — 441 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
09/03/2026M00594866-I1Request digital key ↗
09/02/2026M00745097-I1Request digital key ↗
08/21/2026M01291891-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION25
09/24/2025121449708Open ↗
08/24/2021122695413Open ↗
08/18/2020140940588Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION25
09/13/2017122695413Open ↗
04/06/2017123036348Open ↗
10/11/2016122695413Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWLPC Approval/Permit16
08/19/2026M01328136-S3Open ↗
08/17/2026M01328134-S2Open ↗
08/17/2026M01328133-S2Open ↗
Showing 3 of 16 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
04/20/2015110342512Open ↗
04/15/2015110419921Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE DESIGN CERTIFICATION2
08/18/2020140940588Open ↗
05/26/2015140351125Open ↗
▸Seals & Professional Certifications118
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
03/21/2018123036348Open ↗
05/15/2017122695413Open ↗
01/12/2017122695413Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/03/2026M00594866-I1Open ↗
09/02/2026M00745097-I1Open ↗
08/21/2026M01291891-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026M01331478-S1Open ↗
09/23/2026M01331478-S1Open ↗
09/23/2026M01331478-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/27/2026M01328133-I1Open ↗
09/27/2026M01328133-I1Open ↗
09/05/2026M01328134-S1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
06/22/2016122794413Open ↗
06/21/2016122794413Open ↗
06/03/2016122760002Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
08/18/2020140940588Open ↗
06/22/2016122794413Open ↗
06/21/2016122794413Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
07/24/2013121716651Open ↗
Showing 1 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/18/2020140940588Open ↗
05/26/2015140351125Open ↗
11/10/2014140277616Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/18/2020140940588Open ↗
05/26/2015140351125Open ↗
11/10/2014140277616Open ↗
▸Trade Schedules & Equipment18
▸BISSELF-CERT PLUMBING NOTICE7
04/15/2015121453943Open ↗
01/30/2015121453943Open ↗
02/05/2014121716651Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING6
12/05/2013121716651Open ↗
12/05/2013121716651Open ↗
07/24/2013121716651Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
04/15/2015121453943Open ↗
▸BISEQUIPMENT USE PERMITS1
06/17/2025122695413Open ↗
▸BISHEATING SYSTEMS1
06/17/2025122695413Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/17/2025122695413Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/08/2016122695413Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/17/2026M01328134-I1Open ↗
08/17/2026M01328134-S1Open ↗
08/17/2026M01328134-S3Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
06/03/2016122760002Open ↗
03/08/2016122695413Open ↗
07/26/2013121716651Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/21/2026M01291891-I1Open ↗
08/21/2026M01291897-I1Open ↗
08/21/2026M01291894-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/22/2016122794413Open ↗
03/24/2015121453499Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
03/24/2015121453499Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY9
10/01/2025121449708Open ↗
06/18/2025121449708Open ↗
06/18/2025121449708Open ↗
Showing 3 of 9 on file for this type
▸BISMECHANICAL SYSTEMS2
10/01/2025121449708Open ↗
06/17/2025122695413Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
06/18/2025121449708Open ↗
06/18/2025121449708Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/17/2025122695413Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/17/2025122695413Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/19/2026M01328136-S3Open ↗
▸DOB NOWSOIL REPORT1
08/19/2026M01328136-S3Open ↗
▸Approvals, Objections & Sign-offs81
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
10/02/2025121449708Open ↗
02/25/2021104043483Open ↗
12/15/2020104043483Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
08/21/2026M01291897-I1Open ↗
08/21/2026M01291907-I1Open ↗
08/19/2026M01328136-S3Open ↗
Showing 3 of 26 on file for this type
▸BISLANDMARKS APPROVAL8
08/18/2020140940588Open ↗
06/03/2016122760002Open ↗
03/09/2016122695413Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
07/18/2013121708713Open ↗
Showing 1 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/18/2013121708713Open ↗
07/18/2013121708713Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL3
06/18/2025121449708Open ↗
06/17/2025122695413Open ↗
06/17/2025122760002Open ↗
▸DOB NOWLandmark Approval2
08/13/2026M01328133-S2Open ↗
08/13/2026M01328134-S2Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
01/10/2018104043483Open ↗
▸BISLANDMARKS SIGNOFF1
06/07/2021140940588Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT21
08/18/2020140940588Open ↗
03/21/2018123036348Open ↗
10/06/2016122794413Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
06/20/2025122760002Open ↗
06/18/2025121449708Open ↗
11/23/2021122695413Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms39
▸BISBOROUGH INTAKE FORM16
04/10/2020104043483Open ↗
01/09/2020104043483Open ↗
10/16/2019104043483Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET13
06/22/2016122794413Open ↗
06/03/2016122760002Open ↗
03/08/2016122695413Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION5
12/29/2016122695413Open ↗
07/17/2015140351125Open ↗
11/06/2013121716651Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
08/18/2020140940588Open ↗
05/26/2015140351125Open ↗
11/10/2014140277616Open ↗
Showing 3 of 5 on file for this type
▸Other Documents14
▸DOB NOWProof of Historic Building9
08/13/2026M01331478-I1Open ↗
08/13/2026M01291891-I1Open ↗
08/13/2026M01328136-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026M01328134-S2Open ↗
08/13/2026M01328133-S2Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
03/21/2018123036348Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type