← Back
Three families
45-47 PARSONS BOULEVARD
QUEENS · East Flushing · BIN 4122843
💬 Discuss this project
1920Year Built
2.75Stories
C0Building Class
R3XZoning
4,463 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Three families · 7,150 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
Architecture
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2022$1.7M—— → —$381/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LONGTIN SOLUTIONS LLC603/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VIBEN BUILDING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAYS SERVICE GROUP LLCGeneral Contractor303/21/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LONGTIN SOLUTIONS LLC8320212/29/2022
Building Lifecycle
All (46)Filed (6)Permit Issued (2)Violation (15)Inspection (5)Special Inspection (18)
05/07/2026
Violation issued (HPD, open)
A
11/21/2025
Violation issued (HPD, open)
I
06/12/2025
Violation issued (HPD, closed)
A
12/02/2024
Violation issued (HPD, closed)
I
04/16/2024
Violation issued (HPD, closed)
A
11/24/2023
Violation issued (HPD, closed)
I
05/18/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/29/2023
Violation issued (HPD, closed)
A
03/02/2023
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 1ST, 2ND. 3RD FLOOR. INSTALL NEW PLUMBING FIXTURES. INSTALL NEW BOILERS AND HOT WATER HEATERS.
Q00715827-P3
02/06/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
12/30/2022
Special inspection requirement — Fire-Resistance Rated Construction
TIM TSAI
12/30/2022
Special inspection requirement — Energy Code Compliance Inspections
TIM TSAI
12/30/2022
Special inspection requirement — Fenestration air leakage
TIM TSAI
12/30/2022
Special inspection requirement — Fenestration areas
TIM TSAI
12/30/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
TIM TSAI
12/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
TIM TSAI
12/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
TIM TSAI
12/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
TIM TSAI
12/29/2022
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 1ST, 2ND. 3RD FLOOR. INSTALL NEW PLUMBING FIXTURES. INSTALL NEW BOILERS AND HOT WATER HEATERS.
Q00715827-P2
12/29/2022
Filed — Alteration
INTERIOR RENOVATION WITH OF EXISTING 3 FAMILY HOUSE AT CELLAR, 1ST, 2ND, 3RD FLOOR. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
Q00715824-P1
12/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
TIM TSAI
12/26/2022
Special inspection requirement — Energy Code Compliance Inspections
TIM TSAI
12/26/2022
Special inspection requirement — Fire-Resistance Rated Construction
TIM TSAI
12/26/2022
Special inspection requirement — Fenestration areas
TIM TSAI
12/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
TIM TSAI
12/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
TIM TSAI
12/26/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
TIM TSAI
12/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
TIM TSAI
12/26/2022
Special inspection requirement — Fenestration air leakage
TIM TSAI
11/15/2022
Violation issued (HPD, closed)
I
08/12/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/01/2022
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 1ST, 2ND. 3RD FLOOR. INSTALL NEW PLUMBING FIXTURES. INSTALL NEW BOILERS AND HOT WATER HEATERS.
Q00715827-P1
05/05/2022
Permit issued — General Construction
Q00715824-I1-GC
04/27/2022
Permit issued — Plumbing
Q00715827-I1-PL
04/17/2022
Filed — Alteration
REMOVE AND CAP EXISTING PLUMBING FIXTURES AT 1ST, 2ND. 3RD FLOOR. INSTALL NEW PLUMBING FIXTURES. INSTALL NEW BOILERS AND HOT WATER HEATERS.
Q00715827-I1
04/14/2022
Filed — Alteration
INTERIOR RENOVATION WITH OF EXISTING 3 FAMILY HOUSE AT CELLAR, 1ST, 2ND, 3RD FLOOR. PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
Q00715824-I1
03/04/2022
Violation issued (HPD, closed)
I
03/04/2022
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
11/01/2019
Violation issued (HPD, closed)
I
11/22/2016
Violation issued (HPD, closed)
I
07/21/2010
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDAYS SERVICE GROUP LLC05/05/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG04/27/2022
1 project · most recent 03/02/2023
Gas Water/Sanitary
FiledStatusContractorScope
03/02/2023Signed-offCROSSFIELD P & H CORPGas, Water/Sanitary
1 project · most recent 06/20/2022
General Wiring
FiledStatusContractorScope
06/20/2022Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/06/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/12/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
12/30/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
12/30/2022Fire-Resistance Rated ConstructionTIM TSAIprogress
12/30/2022Energy Code Compliance InspectionsTIM TSAIprogress
12/30/2022Fenestration air leakageTIM TSAIenergy_progress
12/30/2022Fenestration areasTIM TSAIenergy_progress
12/30/2022Fenestration and door U-factor and product ratingsTIM TSAIenergy_progress
12/30/2022HVAC-R and service water heating equipmentTIM TSAIenergy_progress
12/30/2022HVAC-R and service water piping design and insulationTIM TSAIenergy_progress
12/30/2022HVAC-R and service water heating system controlsTIM TSAIenergy_progress
12/26/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
12/26/2022Energy Code Compliance InspectionsTIM TSAIprogress
12/26/2022Fire-Resistance Rated ConstructionTIM TSAIprogress
12/26/2022Fenestration areasTIM TSAIenergy_progress
12/26/2022HVAC-R and service water heating system controlsTIM TSAIenergy_progress
12/26/2022HVAC-R and service water piping design and insulationTIM TSAIenergy_progress
12/26/2022Fenestration and door U-factor and product ratingsTIM TSAIenergy_progress
12/26/2022HVAC-R and service water heating equipmentTIM TSAIenergy_progress
12/26/2022Fenestration air leakageTIM TSAIenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00715827-P1Request digital key ↗
08/26/2026Q00715827-I1Request digital key ↗
08/26/2026Q00715827-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00715824-P1Open ↗
09/01/2026Q00715824-P1Open ↗
09/01/2026Q00715824-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00715824-I1Open ↗
08/13/2026Q00715827-P1Open ↗
08/13/2026Q00715827-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00715824-P1Open ↗
08/27/2026Q00715824-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026Q00715824-I1Open ↗
08/13/2026Q00715827-P3Open ↗
08/13/2026Q00715827-I1Open ↗
Showing 3 of 6 on file for this type