Condo, residential unit in elevator building
Madison Square Park Tower
45 EAST 22ND STREET · BIN 1089831
💬 Discuss this project
2014Year Built
65Stories
R4Building Class
C6-4MZoning
184,797 sfGross Floor Area
82Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: No Report Filed
Condo, residential unit in elevator building · 7,406 sf lot · 24.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsHalstead Management1 filing
PenthouseUnit PHA12p · 3 filings · 19 docs
Floor 651p · 1 filing · 7 docs
Floor 642p · 2 filings · 14 docs
Floor 63
Floor 62
Floor 61
Floor 60
Floor 594p · 2 filings · 20 docs
Floor 584p · 1 filing · 8 docs
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53Interior renovation 53rd floor apartment12p · 4 filings · 20 docs
Floor 52
Floor 51
Floor 50Apartment 56 Demolition and Construction1 filing · 3 docs
Floor 49
Floor 48
Floor 474p · 5 filings · 20 docs
Floor 464p · 5 filings · 20 docs
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Sub-Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
East 22nd St Acquisition Holding6803/21/2026
45 East 22nd Street Property3307/08/2026
304 Park Avenue South1103/21/2026
45 E 22 LLC C/O Walters & Samuel703/21/2026
304 Park A503/21/2026
41-43 Realty303/21/2026
Beppe203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group1603/21/2026
J.A.M. Associates803/21/2026
Mbe Code Zoning1803/21/2026
Milrose Consultants603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Riverside BuildersGeneral Contractor1007/08/2026
B.A.C.C. BuildersGeneral Contractor807/08/2026
S. DonadicGeneral Contractor507/08/2026
Master 2 Plumbing & HeatingPlumbing307/08/2026
Master Plumbing and HeatingFire Protection307/08/2026
Target New York ConstructionGeneral Contractor304/09/2026
A & I General ContractorsGeneral Contractor303/21/2026
Bypass MechanicalPlumbing207/08/2026
Hudson Plumbing & MCHPlumbing207/08/2026
Plumbing WorksFire Protection207/08/2026
Vertex P & HPlumbing207/08/2026
Arcon Plumbing SolutionsPlumbing107/08/2026
P & Z ElectricElectrical103/22/2026
American Standard PlumbingFire Protection107/08/2026
A.M.NPlumbing107/08/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
Donato PlumbingPlumbing107/08/2026
KG SprinklerFire Protection107/08/2026
Universal Fire SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843807/14/2026
Integrity Consulting Service666412/03/2025
Metric Consulting and Ins1803106/14/2024
CES Engineering1277411/01/2023
20/20 Inspections1471605/22/2023
Milrose Consultants2003110/05/2022
Building Lifecycle
All (215)Filed (28)Permit Issued (40)Signed Off (17)Facade (FISP) (3)Violation (53)Inspection (28)Objection (16)Special Inspection (30)
09/03/2026
Signed off — Alteration
M00940923-I1
09/03/2026
Signed off — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00940920-I1
08/24/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/04/2026
Objection resolved — Addressed
07/15/2026
Objection raised — Scope
07/14/2026
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00940920-P2
06/15/2026
Signed off — Alteration
INSTALLATION OF LOCAL FANCOIL UNITS, DUCT DISTRIBUTION AND CONNECTION TO EXISTING BASE BUILDING SYSTEM. NO NEW HEATING/COOLING EQUIPMENT INSTALLED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00940917-I1
05/27/2026
Signed off — Alteration
WORK ON PHA 58TH FLOOR (64TH FL MARKETING) & 59TH FLOOR (65TH FLOORMARKETING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES,CONVENIENCE STAIR & CEILINGS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00940916-I1
05/04/2026
Permit issued — Sprinklers
M00940923-I1-EW-SP
05/04/2026
Permit issued — Plumbing
M00940920-I1-PL
04/28/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
04/28/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/06/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/06/2026
Special inspection requirement — Final
JOHN MCMONAGLE
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
04/01/2026
Signed off — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01090373-S2
03/26/2026
Objection resolved — Addressed
03/18/2026
Signed off — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01090373-S1
03/17/2026
Signed off — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01090373-I1
03/11/2026
Objection raised — Scope
03/02/2026
Filed — Alteration
WORK ON PHA 58TH FLOOR (64TH FL MARKETING) & 59TH FLOOR (65TH FLOORMARKETING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES,CONVENIENCE STAIR & CEILINGS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00940916-P1
02/27/2026
Filed — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00940920-P1
02/13/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/11/2026
Filed — Alteration
M00940923-P1
02/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/03/2026
Permit issued — Mechanical Systems
M01090373-S1-MS
02/03/2026
Permit issued — Plumbing
M01090373-S2-PL
01/26/2026
Cycle 10 facade report submitted
01/26/2026
Cycle 10 facade inspection completed
01/23/2026
Cycle 10 facade report signed — SAFE
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
12/09/2025
Special inspection requirement — Sprinkler Systems
ALEKSANDR LEVIN
12/03/2025
Filed — Alteration
MODIFICATION TO EXISTING PLUMBING FIXTURES AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01090373-P1
11/18/2025
Special inspection requirement — Sprinkler Systems
ALEKSANDR LEVIN
11/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
09/09/2025
Permit issued — Mechanical Systems
M00940917-I1-MS
09/09/2025
Permit issued — General Construction
M00940916-I1-GC
08/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2025
Permit issued — Sprinklers
M01090373-S2-EW-SP
04/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/09/2025
Permit issued — Plumbing
M00940920-I1-PL
04/08/2025
Permit issued — Sprinklers
M00940923-I1-EW-SP
04/08/2025
Violation issued (ECB, closed)
Local Law
04/07/2025
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
04/07/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
04/07/2025
Special inspection requirement — Final
JOHN MCMONAGLE
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/07/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
03/28/2025
Permit issued — Mechanical Systems
M00940917-I1-MS
03/28/2025
Permit issued — General Construction
M00940916-I1-GC
Latest 60 of 215 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offMaster Plumbing and Heating05/04/2026
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating05/04/2026
DOB NOWMechanical SystemsSigned-offTarget New York Construction02/03/2026
DOB NOWPlumbingSigned-offVertex P & H02/03/2026
DOB NOWMechanical SystemsSigned-offRiverside Builders09/09/2025
DOB NOWGeneral ConstructionSigned-offRiverside Builders09/09/2025
DOB NOWSprinklersSigned-offAmerican Standard Plumbing05/15/2025
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating04/09/2025
DOB NOWSprinklersSigned-offMaster Plumbing and Heating04/08/2025
DOB NOWMechanical SystemsSigned-offRiverside Builders03/28/2025
DOB NOWGeneral ConstructionSigned-offRiverside Builders03/28/2025
DOB NOWPlumbingSigned-offVertex P & H01/30/2025
DOB NOWGeneral ConstructionSigned-offTarget New York Construction01/29/2025
DOB NOWMechanical SystemsSigned-offTarget New York Construction01/29/2025
DOB NOWGeneral ConstructionSigned-offRiverside Builders01/16/2025
DOB NOWMechanical SystemsSigned-offRiverside Builders01/15/2025
DOB NOWGeneral ConstructionSigned-offA & I General Contractors06/21/2024
DOB NOWSprinklersSigned-offMaster Plumbing and Heating04/23/2024
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating04/11/2024
DOB NOWPlumbingSigned-offDonato Plumbing03/27/2024
DOB NOWMechanical SystemsSigned-offRiverside Builders01/03/2024
DOB NOWGeneral ConstructionSigned-offRiverside Builders01/03/2024
DOB NOWSprinklersSigned-offH M Sprinkler11/30/2023
DOB NOWPlumbingSigned-offArcon Plumbing Solutions11/22/2023
DOB NOWPlumbingSigned-offHudson Plumbing & MCH11/15/2023
DOB NOWGeneral ConstructionSigned-offSapol Construction08/01/2023
DOB NOWSprinklersSigned-offUniversal Fire Sprinkler04/21/2023
DOB NOWGeneral ConstructionSigned-offSapol Construction12/30/2022
DOB NOWGeneral ConstructionSigned-offSapol Construction12/16/2022
DOB NOWSprinklersSigned-offBluewater P&H11/21/2022
DOB NOWPlumbingSigned-offBypass Mechanical11/21/2022
DOB NOWPlumbingSigned-offHudson Plumbing & MCH11/09/2022
DOB NOWMechanical SystemsSigned-offB.A.C.C. Builders05/24/2022
DOB NOWGeneral ConstructionSigned-offB.A.C.C. Builders03/27/2022
DOB NOWGeneral ConstructionSigned-offB.A.C.C. Builders02/04/2022
DOB NOWPlumbingSigned-offBypass Mechanical09/29/2021
DOB NOWSprinklersSigned-offBluewater P&H09/29/2021
DOB NOWStructuralSigned-offB.A.C.C. Builders09/24/2021
DOB NOWGeneral ConstructionSigned-offB.A.C.C. Builders09/23/2021
DOB NOWPlumbingSigned-offA.M.N09/17/2019
+ 50 more permits on file
1 project · most recent 07/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/14/2026Signed-offMaster Plumbing and HeatingGas, Storm, Water/Sanitary
21 projects · most recent 01/30/2025
General Wiring Lighting
FiledStatusContractorScope
01/30/2025CompleteJumper ElectricGeneral Wiring
05/15/2024CompleteP & Z ElectricGeneral Wiring
03/28/2023CompleteWarren Ostroff ElectricGeneral Wiring
11/18/2022CompleteWarren Ostroff Electric—
07/07/2022CompleteSafetech Electrical ContngGeneral Wiring
10/04/2021CompleteKobryn Electrical ServicesGeneral Wiring
04/30/2021CompleteAgir Electrical Ltd D/B/AGeneral Wiring
01/08/2021CompleteAgir Electrical Ltd D/B/AGeneral Wiring
12/06/2020CompleteRobert Chimenti—
01/27/2020CompleteSolas Electrical ContractingGeneral Wiring
12/05/2019CompleteDenmar ElectricGeneral Wiring
11/19/2019CompleteAgir Electrical Ltd D/B/AGeneral Wiring
10/16/2019CompleteGlendale Electl ContngLighting
06/11/2019CompleteAgir Electrical Ltd D/B/AGeneral Wiring
11/27/2018CompleteAgir Electrical Ltd D/B/AGeneral Wiring
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
08/24/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/25/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/04/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/28/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/23/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/19/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
08/11/2026Post-installed AnchorsJOHN MCMONAGLEspecial
08/11/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/28/2026Post-installed AnchorsJOHN MCMONAGLEspecial
04/28/2026Sprinkler SystemsJOHN MCMONAGLEspecial
04/28/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/06/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/06/2026FinalJOHN MCMONAGLEprogress
04/06/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
04/06/2026Post-installed AnchorsJOHN MCMONAGLEspecial
12/09/2025Sprinkler SystemsALEKSANDR LEVINspecial
12/09/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
11/18/2025Sprinkler SystemsALEKSANDR LEVINspecial
11/18/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
04/07/2025Post-installed AnchorsJOHN MCMONAGLEspecial
04/07/2025Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
04/07/2025FinalJOHN MCMONAGLEprogress
04/07/2025Post-installed AnchorsJOHN MCMONAGLEspecial
04/07/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/07/2025Sprinkler SystemsJOHN MCMONAGLEspecial
04/07/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/23/2024Post-installed AnchorsALEKSANDR LEVINspecial
08/23/2024Lighting controlsWest Chinenergy_progress
08/23/2024Interior lighting powerWest Chinenergy_progress
08/23/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
08/14/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
Latest 25 of 86.
▾Documents — 1,211 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch27
09/03/2026M00489469-I1Request digital key ↗
09/03/2026M00535829-I1Request digital key ↗
09/03/2026M00535827-P1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00226810-I1Request digital key ↗
▸Applications & Permits277
▸BISPLAN / WORK APPROVAL APPLICATION178
10/17/2023121332986Open ↗
10/12/2023121332986Open ↗
12/27/2022121332986Open ↗
Showing 3 of 178 on file for this type
▸BISWORK PERMIT APPLICATION99
01/10/2020140182193Open ↗
12/11/2019123801644Open ↗
12/06/2019123530312Open ↗
Showing 3 of 99 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZRD1-Zoning Resolution Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M00489469-I1Open ↗
▸Seals & Professional Certifications279
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION110
02/21/2020123530312Open ↗
12/11/2019123801644Open ↗
Showing 2 of 110 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/20/2026M01058280-I1Open ↗
09/02/2026M00940916-P1Open ↗
08/30/2026M01090373-I1Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT30
12/11/2019123801644Open ↗
Showing 1 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/05/2026M00226810-I1Open ↗
09/03/2026M00535827-P1Open ↗
09/03/2026M00535827-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/23/2026M01090373-S2Open ↗
09/20/2026M01058280-I1Open ↗
09/02/2026M00940916-P1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
03/11/2022121965775Open ↗
11/16/2021121937501Open ↗
12/11/2019123801644Open ↗
Showing 3 of 21 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
12/24/2020140995056Open ↗
Showing 1 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE7
12/24/2020140995056Open ↗
Showing 1 of 7 on file for this type
▸Trade Schedules & Equipment57
▸BISSCHEDULE B - PLUMBING31
01/09/2020140182193Open ↗
Showing 1 of 31 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
12/20/2019123583755Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/09/2023121332986Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026M00489469-I1Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes5
12/11/2019123801644Open ↗
Showing 1 of 5 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00226810-I1Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance43
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
12/11/2019123801644Open ↗
Showing 1 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
01/21/2021123530312Open ↗
01/21/2021123530312Open ↗
07/18/2020123801644Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/26/2021140995056Open ↗
01/21/2021123530312Open ↗
01/21/2021123530312Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
12/01/2022121332986Open ↗
05/16/2022123887302Open ↗
05/05/2022123738651Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
03/09/2023121332986Open ↗
05/16/2022123887302Open ↗
▸BISFENESTRATION AIR LEAKAGE1
03/09/2023121332986Open ↗
▸BISINTERIOR LIGHTING POWER1
03/09/2023121332986Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/24/2020140995056Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00535820-I1Open ↗
▸Inspections & Test Reports75
▸BISTECHNICAL REPORT: RESPONSIBILITY50
05/24/2022123738651Open ↗
05/05/2022123738651Open ↗
03/10/2022121965775Open ↗
Showing 3 of 50 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/16/2023121332986Open ↗
▸Approvals, Objections & Sign-offs127
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST66
06/02/2022123738651Open ↗
05/20/2022123887302Open ↗
03/11/2022121965775Open ↗
Showing 3 of 66 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE18
12/27/2022121332986Open ↗
12/23/2022121332986Open ↗
12/20/2022121332986Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSUPERSEDING LETTER12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISCCD1-Construction Code Determination9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISFINAL4
05/16/2022123887302Open ↗
05/05/2022123738651Open ↗
02/23/2022121965775Open ↗
Showing 3 of 4 on file for this type
▸BISCURB CUT (CC) SIGNOFF1
12/01/2022121332986Open ↗
▸BISTRANSIT AUTHORITY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership39
▸BISCOST AFFIDAVIT27
01/21/2021123530312Open ↗
12/24/2020140995056Open ↗
12/09/2020123530312Open ↗
Showing 3 of 27 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
05/20/2022123887302Open ↗
05/05/2022123738651Open ↗
11/19/2021121965775Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
12/24/2020140995056Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026M00489469-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026M00489469-I1Open ↗
▸Filing & Intake Forms179
▸BISADDITIONAL INFORMATION96
03/10/2022121965775Open ↗
03/10/2022121965775Open ↗
02/24/2021121333020Open ↗
Showing 3 of 96 on file for this type
▸BISBOROUGH INTAKE FORM39
03/17/2020121332986Open ↗
12/26/2019121332986Open ↗
12/20/2019121332986Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING COVER SHEET27
12/11/2019123801644Open ↗
Showing 1 of 27 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET17
12/24/2020140995056Open ↗
Showing 1 of 17 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSupporting Document: Fee Exempt4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSHUTOFF DAMPERS1
03/09/2023121332986Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M00489469-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026M00489469-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M00489469-I1Open ↗