Condo, residential tower (mixed-use, multi-family elevator) [derived]
Stanford
45 EAST 25TH STREET · BIN 1016750
💬 Discuss this project
1987Year Built
41Stories
RMBuilding Class
C5-3Zoning
116,577 sfGross Floor Area
127Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: The Stanford Condominium · 9,890 sf lot · 11.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPipe scaffold installation3p · 1 filing · 5 docs
PenthouseUnit PHB3p · 1 filing · 5 docs
Floor 41The Stanford CondominiumUnder Construction13p · 1 filing · 12 docs
Floor 40The Stanford, Unit 40AUnder Construction13p · 2 filings · 14 docs
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32Unit 32C1 filing · 2 docs
Floor 31
Floor 30
Floor 29
Floor 28Unit 28B11p · 2 filings · 18 docs
Floor 27
Floor 26Unit 26B9p · 1 filing · 7 docs
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Unit 11C3p · 2 filings · 6 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5LifeStance Health17p · 3 filings · 13 docs
Floor 4
Floor 3Under Construction5p · 1 filing · 12 docs
Floor 2
Floor 1
CellarDestinationpetUnder Construction13p · 1 filing · 18 docs
Basement1p · 1 filing · 7 docs
Site & exteriorHeavy Duty Sidewalk Shed Installation9p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stanford Condominium6010/09/2026
250 West 41st Street Realty1703/21/2026
250 W 41st St Realty Corp Suite 201207/08/2026
Murray Hill Animal Hospital504/09/2026
Penmark Realty303/21/2026
41 Madison303/21/2026
Offices103/21/2026
Paramount Health Partners103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eurocelt Expediting803/21/2026
NH Expediting and Consulting403/21/2026
Oams Architectural Design P403/21/2026
SKY Management Group403/21/2026
JM Zoning803/21/2026
Perotto Consulting Management603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brend RestorationScaffold1807/08/2026
4TL ConstructionGeneral Contractor403/21/2026
Mohammed S IslamGeneral Contractor303/21/2026
Paladin Construction ServicesGeneral Contractor307/02/2026
PMD DevelopmentGeneral Contractor303/21/2026
Banner ConstructionGeneral Contractor210/09/2026
Apollo Electric NYGElectrical103/21/2026
Y.S. ElectricElectrical103/21/2026
Cresco ElectricalElectrical103/21/2026
HLP ContractingGeneral Contractor107/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Forte Express P & HPlumbing107/08/2026
HI-Tech Plumbing & HeatingPlumbing107/08/2026
R.J.C. MechanicalPlumbing110/09/2026
Safepipe PlumbingPlumbing107/08/2026
A+ Electric of Greater NYElectrical103/22/2026
Zone Plumbing & HeatingPlumbing107/08/2026
All City ElectricalElectrical103/21/2026
Amko Electric Construction & Maintenance IElectrical103/21/2026
Inter Connection ElectricElectrical103/21/2026
Sciascia ElectricalElectrical103/21/2026
Skowronski JeffElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H. A. Bader Consultants2332308/05/2026
IP Concrete Testing and I6252405/14/2026
Ammor Architecture3054410/20/2022
AK Engineering678207/21/2021
Building Lifecycle
All (196)Filed (24)Permit Issued (23)Signed Off (9)Facade (FISP) (16)Violation (46)Inspection (14)Objection (34)Special Inspection (30)
10/09/2026
Filed — Alteration
Renovation of an existing duplex apartment 32C on the 32nd floor. work includes non-structural demolition and general construction as per plans filed herewith. no change to use, egress or occupancy.
M01470037-I1
10/07/2026
Permit issued — Plumbing
M01425773-S1-PL
10/07/2026
Permit issued — General Construction
M01425773-I1-GC
10/06/2026
Permit issued — Mechanical Systems
M01425773-S2-MS
10/05/2026
Special inspection requirement — Energy Code Compliance Inspections
10/05/2026
Special inspection requirement — Post-installed Anchors
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/05/2026
Special inspection requirement — Final
08/13/2026
Violation issued (ECB, open)
Zoning
08/05/2026
Filed — Alteration
Mechanical work file in conjunction with apartment #PHB renovation.
M01425773-S2
08/05/2026
Filed — Alteration
Mechanical work file in conjunction with apartment #PHB renovation.
M01425773-I1
08/05/2026
Filed — Alteration
Mechanical work file in conjunction with apartment #PHB renovation.
M01425773-S1
07/08/2026
Special inspection requirement — Post-installed Anchors
Howard Bader
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Divilio
07/02/2026
Special inspection requirement — Final
Christian Ricci
07/02/2026
Special inspection requirement — Post-installed Anchors
Howard Bader
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
07/02/2026
Special inspection requirement — Lighting in dwelling units
Christian Ricci
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Christian Ricci
06/30/2026
Permit issued — General Construction
M01384954-I1-GC
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/04/2026
Objection raised — Admin
06/04/2026
Objection raised — Other
06/04/2026
Objection raised — Energy
06/04/2026
Objection raised — Energy
06/04/2026
Objection raised — Other
06/04/2026
Objection raised — Accessibility
05/14/2026
Filed — Alteration
Alteration herewith filed for renovation of at existing apartment 37A on the third floor of an existing 119 families, mixed use building. Work includes renovation of existing kitchen, existing bathrooms. No change in occupancy, use, egress, and bulk.
M01384954-I1
05/14/2026
Filed — Alteration
Alteration herewith filed for renovation of at existing apartment 37A on the third floor of an existing 119 families, mixed use building. Work includes renovation of existing kitchen, existing bathrooms. No change in occupancy, use, egress, and bulk.
M01384954-S1
04/30/2026
Signed off — Alteration
HEREBY FILING THIS APPLICATION TO PROPOSE PLUMBING WORK INCONJUNCTION TO INTERIOR RENOVATION OF APARTMENT # 26B. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01290111-I1
04/30/2026
Signed off — Alteration
HEREBY FILING THIS APPLICATION TO PROPOSE PLUMBING WORK INCONJUNCTION TO INTERIOR RENOVATION OF APARTMENT # 26B. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01290111-S1
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
04/09/2026
Special inspection requirement — Final
NAVEEN KUMAR
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/30/2026
Permit issued — Plumbing
M01311321-S1-PL
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2026
Objection resolved — Addressed
02/09/2026
Permit issued — General Construction
M01311321-I1-GC-CX
01/12/2026
Objection resolved — Addressed
01/06/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/02/2026
Objection raised — Admin
01/02/2026
Objection raised — Cost
01/02/2026
Objection raised — Admin
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/29/2025
Objection raised — Structural
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedR.J.C. Mechanical10/07/2026
DOB NOWGeneral ConstructionPermit IssuedBanner Construction10/07/2026
DOB NOWMechanical SystemsPermit IssuedBanner Construction10/06/2026
DOB NOWGeneral ConstructionPermit IssuedPaladin Construction Services06/30/2026
DOB NOWPlumbingPermit IssuedBellerose Plumbing & Heating03/30/2026
DOB NOWGeneral ConstructionPermit IssuedPaladin Construction Services02/09/2026
DOB NOWGeneral ConstructionSigned-offPMD Development12/01/2025
DOB NOWPlumbingSigned-offForte Express P & H11/28/2025
DOB NOWPlumbingPermit IssuedZone Plumbing & Heating07/25/2022
DOB NOWGeneral ConstructionPermit IssuedMohammed S Islam07/20/2022
DOB NOWPlumbingSigned-offHI-Tech Plumbing & Heating04/21/2022
DOB NOWGeneral ConstructionSigned-offHLP Contracting04/20/2022
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating08/12/2021
DOB NOWGeneral ConstructionSigned-off4TL Construction08/12/2021
DOB NOWMechanical SystemsSigned-off4TL Construction08/11/2021
DOB NOWSupported ScaffoldSigned-offBrend Restoration03/27/2020
DOB NOWSidewalk ShedSigned-offBrend Restoration03/27/2020
DOB NOWSupported ScaffoldSigned-offBrend Restoration04/19/2019
DOB NOWSidewalk ShedSigned-offBrend Restoration04/19/2019
DOB NOWSupported ScaffoldSigned-offBrend Restoration04/05/2019
DOB NOWSidewalk ShedSigned-offBrend Restoration04/05/2019
DOB NOWSupported ScaffoldSigned-offBrend Restoration02/19/2019
DOB NOWSidewalk ShedSigned-offBrend Restoration02/11/2019
BISOTISSUEDBrend Restoration04/06/2020
BISOTISSUEDBrend Restoration04/23/2019
BISPLISSUEDSo Plumbing & Heating03/28/2018
BISOTISSUEDNorman Project Management11/08/2017
BISMHISSUEDDean and Silva06/21/2017
BISOTISSUEDDean and Silva05/02/2017
BISPLISSUEDDonato Plumbing Group04/04/2017
BISOTISSUEDDean and Silva03/30/2017
BISMHISSUEDSun Sun Contracting01/11/2017
BISPLISSUEDBest Plumbing & HVAC12/07/2016
BISOTISSUEDSun Sun Contracting12/07/2016
BISPLISSUEDOrbit Plumbing & Heating05/10/2016
BISOTISSUEDCapezzano Construction11/10/2015
BISPLISSUEDSafety Plumbing & Heating05/19/2014
BISOTISSUEDSawera Interiors05/13/2014
BISOTISSUEDJap Restoration01/28/2014
BISPLISSUEDF1 Mechanical05/28/2013
+ 33 more permits on file
2 projects · most recent 08/05/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Permit IssuedBanner ConstructionHeating and Air Conditioning Systems
Heat / Cool
Lg ZRUM060GSS0 60,000 BTU · Vrf Outdoor ×1
12/11/2025Permit IssuedPaladin Construction ServicesHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Liebert MMC12A 13 BTU · Split System ×1
Ventilation
Titus 50 F 400 CFM ×12
TMSA-AA 400 CFM ×2
FFDER 400 CFM · Exhaust Fan ×1
3 projects · most recent 08/05/2026
Water/Sanitary Gas Medical Gas
FiledStatusContractorScope
08/05/2026Permit IssuedR.J.C. MechanicalGas, Water/Sanitary
05/14/2026——Water/Sanitary
12/11/2025Permit IssuedSafepipe PlumbingMedical Gas, Water/Sanitary
17 projects · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026Permit IssuedGlendale Electl ContngGeneral Wiring
09/03/2026Permit IssuedInternational Empire ElectricGeneral Wiring
07/29/2026Permit IssuedGM-Power ElectricGeneral Wiring
02/03/2026Permit IssuedInternational Empire ElectricGeneral Wiring
12/04/2025CompleteCresco ElectricalGeneral Wiring
11/02/2025Permit IssuedA.C. Morgan ElectricGeneral Wiring
05/26/2025CompleteArma Electric—
02/05/2024Permit IssuedA+ Electric of Greater NYGeneral Wiring
09/12/2022CompleteA+ Electric of Greater NYGeneral Wiring
07/25/2022CompleteAdam Electrical Contrng—
04/11/2022CompleteA2K ElectricGeneral Wiring
04/02/2022CompleteCity Grid Electric—
08/19/2021Permit IssuedRobert Chimenti6 meters, 1 new_meters
08/12/2021CompleteLippolis ElectricGeneral Wiring
07/29/2021Permit IssuedCentennial Elevator IndustriesGeneral Wiring
1 project · most recent 12/11/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/11/2025Permit IssuedSafepipe PlumbingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/05/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
10/05/2026Energy Code Compliance Inspections—progress
10/05/2026Post-installed Anchors—special
10/05/2026Fire-Resistant Penetrations and Joints—special
10/05/2026Final—progress
07/08/2026Post-installed AnchorsHoward Baderspecial
07/08/2026Fire-Resistant Penetrations and JointsHoward Baderspecial
07/08/2026HVAC-R and service water piping design and insulationRobert Divilioenergy_progress
07/02/2026FinalChristian Ricciprogress
07/02/2026Post-installed AnchorsHoward Baderspecial
07/02/2026Fire-Resistant Penetrations and JointsHoward Baderspecial
07/02/2026Lighting in dwelling unitsChristian Riccienergy_progress
07/02/2026Energy Code Compliance InspectionsChristian Ricciprogress
04/09/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
04/09/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
04/09/2026FinalNAVEEN KUMARprogress
04/09/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
04/09/2026Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
04/09/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
11/03/2025HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
11/03/2025Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
11/03/2025Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
11/03/2025Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
11/03/2025Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
11/03/2025HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
11/03/2025Interior lighting powerINDARDEO PARBHUNATHenergy_progress
Latest 25 of 45.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
DestinationpetRetailCellar
Project M01311321 Alteration · Permit Entire · 11/11/2025
The StanfordResidentialFloor 40
Project M01273903 Alteration · Approved · 09/24/2025
LifeStance HealthMedical / HealthcareFloor 5
Project M00528481 Alteration · LOC Issued · 07/21/2021
Project M00528626 Alteration · LOC Issued · 07/21/2021
Project M00528646 Alteration · LOC Issued · 07/21/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 454 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch19
09/03/2026M00528626-I1Request digital key ↗
09/03/2026M00528481-I1Request digital key ↗
09/03/2026M00528646-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00128614-P1Request digital key ↗
09/05/2026M00128614-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00131390-I1Request digital key ↗
08/15/2026M00131390-P1Request digital key ↗
▸Applications & Permits67
▸BISWORK PERMIT APPLICATION38
04/23/2019123674363Open ↗
03/28/2018123188969Open ↗
11/09/2017123188969Open ↗
Showing 3 of 38 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION28
06/26/2019123752858Open ↗
03/05/2019140834809Open ↗
02/06/2019123674363Open ↗
Showing 3 of 28 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
06/20/2014120989350Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications126
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION48
06/26/2019123752858Open ↗
05/03/2019123028552Open ↗
04/04/2019123188969Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
10/14/2026M01470037-I1Open ↗
09/05/2026M00128614-P1Open ↗
09/05/2026M00128614-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
10/03/2026M00131390-I1Open ↗
09/02/2026M01425773-S1Open ↗
09/01/2026M01290111-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M01425773-S1Open ↗
09/01/2026M01384954-I1Open ↗
08/27/2026M01311321-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
06/26/2019123752858Open ↗
11/27/2015122576925Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/26/2019123752858Open ↗
03/05/2019140834809Open ↗
11/27/2015122576925Open ↗
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/27/2016140588629Open ↗
11/16/2016140574144Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/05/2019140834809Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/05/2019140834809Open ↗
▸Trade Schedules & Equipment29
▸BISSELF-CERT PLUMBING NOTICE11
10/17/2014121959979Open ↗
08/11/2014121959979Open ↗
04/15/2014121538041Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING10
02/07/2017140574144Open ↗
11/16/2016140574144Open ↗
08/13/2013121538041Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/06/2017123188969Open ↗
08/08/2017123028552Open ↗
03/07/2017123028552Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes6
06/26/2019123752858Open ↗
02/06/2019123674363Open ↗
10/06/2017123188969Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
10/14/2026M01470037-I1Open ↗
09/03/2026M00528626-I1Open ↗
09/03/2026M00528481-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
02/06/2019123674363Open ↗
10/27/2017123188969Open ↗
03/07/2017123028552Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/02/2026M00698093-I1Open ↗
08/13/2026M00698037-I1Open ↗
▸Energy Compliance39
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
06/26/2019123752858Open ↗
04/04/2019123188969Open ↗
02/06/2019123674363Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
12/17/2020123674363Open ↗
05/03/2019123028552Open ↗
04/04/2019123188969Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/17/2020123674363Open ↗
01/04/2017140588629Open ↗
11/16/2016140574144Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00528626-I1Open ↗
08/13/2026M00528646-I1Open ↗
08/13/2026M00698037-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
12/17/2020123674363Open ↗
03/05/2019140834809Open ↗
01/04/2017140588629Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/04/2019123188969Open ↗
▸Approvals, Objections & Sign-offs35
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
12/17/2020123674363Open ↗
05/03/2019123028552Open ↗
04/04/2019123188969Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/06/2019123674363Open ↗
11/20/2014121165363Open ↗
Showing 2 of 4 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership39
▸BISCOST AFFIDAVIT38
12/17/2020123674363Open ↗
06/26/2019123752858Open ↗
05/03/2019123028552Open ↗
Showing 3 of 38 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
04/12/2017123028552Open ↗
▸Filing & Intake Forms41
▸BISADDITIONAL INFORMATION19
12/03/2019140834809Open ↗
11/29/2019140834809Open ↗
06/05/2019140834809Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET16
06/26/2019123752858Open ↗
02/06/2019123674363Open ↗
10/06/2017123188969Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
03/05/2019140834809Open ↗
12/27/2016140588629Open ↗
11/16/2016140574144Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
05/03/2019123028552Open ↗
04/04/2019123188969Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type