| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01357331 ↗ | 38 EAST 10 STREET MANHATTAN | Alteration | Permit Issued | 03/13/2026 | 05/01/2026 | PL PLANS FILED HEREWITH TO SHOW INTERIOR RENOVATION & ABANDONMENT OF GAS SERVICE TO APT. 8E & REMOVAL OF GAS METER IN THE CELLAR . NO CHANGE… | |
| M01025227 ↗ | 775 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 05/07/2024 | 11/21/2025 | Move the existing main entrance door and entrance vestibule door into the lobby footprint and replace the doors with new ones. No change in … | |
| B01248853 ↗ | 411 GREENWOOD AVENUE BROOKLYN | Alteration | Permit Issued | 07/17/2025 | 07/24/2025 | Design AM ARCHITECT P.C. | GENERAL CONSTRUCTION FOR 2ND FLOOR RENOVATIONS CONSISTING OF REMOVAL & INSTALLATION OF PARTITIONS, WALL & FLOOR FINISHES, BALCONY SLIDING DO… |
| M01101035 ↗ | 771 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 09/13/2024 | 11/27/2024 | Owner THE LOVETT GROUP Filer THE LOVETT GROUP | Select interior renovation of apartment unit 11B. No Change in Use Egress or Occupancy |
| M00901057 ↗ | 220 EAST 65 STREET MANHATTAN | Alteration | Signed-off | 08/10/2023 | 10/01/2024 | Plumbing work as shown on plans for apt 4BC. | |
| M00914989 ↗ | 2 HORATIO STREET MANHATTAN | Alteration | Signed-off | 08/24/2023 | 02/01/2024 | Design SPAGNOLO GROUP ARCHITECTURE | FILING TO REMOVE NON-LOAD BEARING KITCHEN PARTITIONS, RECONSTRUCT CLOSETS IN THE ENTRY FOYER AND BEDROOM. REPLACE ENTRY DOOR, RENOVATE KITC… |
| Name | Projects together | Most recent |
|---|---|---|
| BOGUE TRONDOWSKI ARCHITECT PLLC | 2 | 02/23/2023 |
| A2 ARCHITECT, PC | 1 | 05/13/2021 |
| ADG ENGINEERING | 1 | 01/12/2022 |
| ALTAGRACIA ESTHER MARTINEZ, R.A. | 1 | 04/21/2026 |
| AM ARCHITECT P.C. | 1 | 04/21/2026 |
| ANZ CONSULTING ENGINEERING, PLLC | 1 | 03/13/2026 |
| BKS ARCHITECTS | 1 | 04/16/2024 |
| BLDG INC | 1 | 05/04/2021 |
| CO.DE CONSULTING AND DESIGN, INC. | 1 | 08/08/2022 |
| DESIGN + URBANISM ARCHITECTURAL, LL | 1 | 01/24/2022 |
| E4P CONSULTING ENGINEERING PLLC | 1 | 10/23/2024 |
| GATES MERKULOVA ARCHITECTS, LLP | 1 | 11/13/2024 |
| JIM BROWNING, AIA | 1 | 10/23/2024 |
| Jan Greben Architecture | 1 | 03/13/2026 |
| LEVIN ENGINEERING PLLC | 1 | 09/09/2021 |
| MKO ARCHITECTURE | 1 | 05/24/2023 |
| PATH ARCHITECTURE PC | 1 | 11/08/2020 |
| SPAGNOLO GROUP ARCHITECTURE | 1 | 04/16/2024 |
| STRUCTURAL ENGINEERING INTEGRATED | 1 | 09/02/2022 |
| STUDIOGREENER ARCHITECTURE PLLC | 1 | 05/07/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| SIMPLE CHOICE PLBG AND HT | 2 | 03/13/2026 |
| COOLQUEST MECHANICAL INC | 1 | 10/23/2024 |
| HARRY'S CONTRACTING INC | 1 | 02/23/2023 |
| KAIZEN NY CONTRACTING INC | 1 | 04/16/2024 |
| MB BORO CONSTRUCTION CORP | 1 | 11/08/2020 |
| MB BOROUGH CONSTRUCTION C | 1 | 11/08/2020 |
| WAWEL PLBG AND HTG CORP | 1 | 11/13/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| 53 ST MARKS TENANTS CORP | 1 | 09/09/2021 |
| SEWARD PARK HOUSING CORP. | 1 | 05/04/2021 |
| SWING STAGING LLC | 1 | 02/23/2023 |
| THE LOVETT GROUP | 1 | 10/23/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 2 | 04/21/2026 |
| 2020 GROUP SERVICE CORP | 1 | 09/02/2022 |
| BOYD CONSULTING, INC | 1 | 02/23/2023 |
| COMMERCIAL CAPITAL USA INC | 1 | 04/16/2024 |
| FAVIO & MARIA BARRIONUEVO LLC | 1 | 05/04/2021 |
| JM ZONING, LLC. | 1 | 01/24/2022 |
| THE LOVETT GROUP | 1 | 10/23/2024 |
| WILLIAM VITACCO ASSOCIATES | 1 | 11/13/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01357331 ↗ | 38 EAST 10 STREET MANHATTAN | Alteration | Permit Issued | 03/13/2026 | 05/01/2026 | PL PLANS FILED HEREWITH TO SHOW INTERIOR RENOVATION & ABANDONMENT OF GAS SERVICE TO APT. 8E & REMOVAL OF GAS METER IN THE CELLAR . NO CHANGE… | |
| M01025227 ↗ | 775 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 05/07/2024 | 11/21/2025 | Move the existing main entrance door and entrance vestibule door into the lobby footprint and replace the doors with new ones. No change in … | |
| B01248853 ↗ | 411 GREENWOOD AVENUE BROOKLYN | Alteration | Permit Issued | 07/17/2025 | 07/24/2025 | Design AM ARCHITECT P.C. | GENERAL CONSTRUCTION FOR 2ND FLOOR RENOVATIONS CONSISTING OF REMOVAL & INSTALLATION OF PARTITIONS, WALL & FLOOR FINISHES, BALCONY SLIDING DO… |
| M01101035 ↗ | 771 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 09/13/2024 | 11/27/2024 | Owner THE LOVETT GROUP Filer THE LOVETT GROUP | Select interior renovation of apartment unit 11B. No Change in Use Egress or Occupancy |
| M00901057 ↗ | 220 EAST 65 STREET MANHATTAN | Alteration | Signed-off | 08/10/2023 | 10/01/2024 | Plumbing work as shown on plans for apt 4BC. | |
| M00914989 ↗ | 2 HORATIO STREET MANHATTAN | Alteration | Signed-off | 08/24/2023 | 02/01/2024 | Design SPAGNOLO GROUP ARCHITECTURE | FILING TO REMOVE NON-LOAD BEARING KITCHEN PARTITIONS, RECONSTRUCT CLOSETS IN THE ENTRY FOYER AND BEDROOM. REPLACE ENTRY DOOR, RENOVATE KITC… |
| Q00648881 ↗ | 49-47 31 STREET QUEENS | Alteration | Permit Issued | 01/12/2022 | 12/12/2023 | Owner SWING STAGING LLC Filer BOYD CONSULTING, INC | Interior renovation of existing warehouse on 1st floor of a 2 story group 6 and 16 building. No Change to use, egress or occupancy. |
| 421765646BIS | 71-38 71 STREET QUEENS | — | ISSUED | 10/05/2020 | 11/29/2022 | — | — |
| B00717512 ↗ | 39 BREVOORT PLACE BROOKLYN | Alteration CO | Permit Issued | 06/01/2022 | 11/28/2022 | Design MKO ARCHITECTURE | CONSTRUCT NEW PARTITIONS WITH NEW FIXTURES AT NEW AND EXISTING LOCATIONS AND NEW FINISHES, AS PER PLANS FILED HEREWITH. CHANGE OF OCCUPANCY … |
| M00663785 ↗ | 260 BOWERY MANHATTAN | Alteration | Signed-off | 01/24/2022 | 11/18/2022 | Filer JM ZONING, LLC. | Application filed for installation of trellis, planters, and seating in existing rear yard. No change in use, occupancy, or egress. |
| 321514250BIS | 250 NORTH HENRY STREET BROOKLYN | — | ISSUED | 12/11/2018 | 09/22/2022 | — | EQ, PL |
| B00798436 ↗ | 117 CALYER STREET BROOKLYN | Alteration | Signed-off | 09/02/2022 | 09/13/2022 | Filer 2020 GROUP SERVICE CORP | proposed structural plans for the enlargement of the existing opening on a load bearing wall |
| Q00425251 ↗ | 71-38 71 STREET QUEENS | Alteration | Signed-off | 11/08/2020 | 08/15/2022 | Design PATH ARCHITECTURE PC | INSTALL TEMPORARY CONSTRUCTION FENCE. ALL AS PER PLANS. |
| Q00789091 ↗ | 18-69 STANHOPE STREET QUEENS | Alteration | Signed-off | 08/08/2022 | 08/12/2022 | MINOR RENOVATION - BEAUTIFICATION OF THE ONE APARTMENT #2L ON THE SECOND FLOOR | |
| Q00648888 ↗ | 49-47 31 STREET QUEENS | Alteration | Signed-off | 01/12/2022 | 04/13/2022 | Design ADG ENGINEERING | New concrete raised deck/wall, with 1 floor light gage show room above. No change to use, egress or occupancy. |
| M00347952 ↗ | 53 ST MARKS PLACE MANHATTAN | Alteration | Signed-off | 05/11/2020 | 03/08/2022 | Design LEVIN ENGINEERING PLLC Owner 53 ST MARKS TENANTS CORP Filer LEVIN ENGINEERING PLLC | INSTALLATION OF VENTILATION SYSTEM FROM 001 THRU 004TH FLOOR . NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00483173 ↗ | 935 3 AVENUE MANHATTAN | Alteration | Signed-off | 05/06/2021 | 12/09/2021 | FILING FOR INTERIOR RENOVATION WORK IN APT. 15F ON 14TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| M00498951 ↗ | 230 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 05/13/2021 | 11/26/2021 | Design A2 ARCHITECT, PC | Interior renovation of apartment 16K on the 14th and 15th floor. |
| 123909930BIS | 53 ST MARKS PLACE MANHATTAN | — | ISSUED | 11/23/2020 | 11/24/2021 | — | OT |
| M00507020 ↗ | 357 GRAND STREET MANHATTAN | Alteration | Signed-off | 05/04/2021 | 07/06/2021 | Design BLDG INC | BATHROOM RENOVATION AT 18TH FLOOR APARTMENT NO. 1803. WORK INCLUDES REMOVAL OF NON-LOAD-BEARING PARTITION, TILE WORK, AND LIGHTING. |
| 321396903BIS | 162 NEWEL STREET BROOKLYN | — | ISSUED | 03/22/2018 | 10/09/2020 | — | OT, PL |
| 123545226BIS | 1609 2 AVENUE MANHATTAN | — | ISSUED | 12/12/2018 | 03/06/2020 | — | OT |
| 123779358BIS | 144 COLUMBUS AVENUE MANHATTAN | — | ISSUED | 06/20/2019 | 01/07/2020 | — | OT, PL |
| 123679590BIS | 15 WEST 81 STREET MANHATTAN | — | ISSUED | 10/04/2019 | 12/06/2019 | — | MH, OT, PL |
| 321687867BIS | 162 NEWEL STREET BROOKLYN | — | ISSUED | 11/13/2019 | 11/13/2019 | — | OT |
| 123772088BIS | 422 EAST 72 STREET MANHATTAN | — | ISSUED | 09/23/2019 | 09/23/2019 | — | OT |
| 123680070BIS | 357 GRAND STREET MANHATTAN | — | ISSUED | 05/13/2019 | 05/13/2019 | — | OT |
| 123355911BIS | 900 5 AVENUE MANHATTAN | — | ISSUED | 04/05/2018 | 09/21/2018 | — | MH, OT, PL |
| 123188969BIS | 43 EAST 25 STREET MANHATTAN | — | ISSUED | 11/08/2017 | 03/28/2018 | — | OT, PL |
| 421019551BIS | 111-15 75 AVENUE QUEENS | — | ISSUED | 03/09/2018 | 03/16/2018 | — | OT, PL |
| Building | Filings | Most Recent |
|---|---|---|
| 38 EAST 10 STREET ↗ | 1 | 07/08/2026 |
| 49-47 31 STREET ↗ | 2 | 07/08/2026 |
| 71-38 71 STREET ↗ | 1 | 07/08/2026 |
| 18-69 STANHOPE STREET ↗ | 1 | 07/08/2026 |
| 39 BREVOORT PLACE ↗ | 4 | 07/08/2026 |
| 260 BOWERY ↗ | 1 | 07/08/2026 |
| 2 HORATIO STREET ↗ | 4 | 07/08/2026 |
| 117 CALYER STREET ↗ | 1 | 07/08/2026 |
| 220 EAST 65 STREET ↗ | 4 | 07/08/2026 |
| 775 AVENUE OF THE AMER ↗ | 1 | 07/08/2026 |
| 230 CENTRAL PARK WEST ↗ | 9 | 03/21/2026 |
| 935 3 AVENUE ↗ | 9 | 03/21/2026 |
| 771 WEST END AVENUE ↗ | 3 | 03/21/2026 |
| 357 GRAND STREET ↗ | 3 | 03/21/2026 |
| 411 GREENWOOD AVENUE ↗ | 3 | 03/21/2026 |
| 53 ST MARKS PLACE ↗ | 3 | 03/21/2026 |