| Owner | Filings | Most Recent |
|---|---|---|
| BROWN HARRIS STEVENS | 19 | 07/29/2026 |
| JSRE MANAGEMENT | 19 | 07/08/2026 |
| STITCHT | 6 | 07/08/2026 |
| ABECO CONSTRUCTION, LLC | 5 | 03/22/2026 |
| 80TH AT MADISON CONDOMINIMUM | 28 | 03/22/2026 |
| 80TH & MADISON CONDOR | 1 | 03/22/2026 |
| OWNER OF 1053 MADISON AVE | 1 | 03/22/2026 |
| STATUS CAPITAL | 15 | 03/22/2026 |
| AVC GENERAL CONTRACTING | 1 | 03/22/2026 |
| GUMLEY HAFT | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TOHFAZ UDDIN PE PC | 4 | 05/08/2026 |
| KZ ENGINEERING, P.C | 5 | 03/04/2026 |
| E4P CONSULTING ENGINEERING PLLC | 2 | 11/13/2025 |
| LETA ARCHITECTURE PLLC | 1 | 11/07/2025 |
| SALVATOR A. CARADONNA JR. | 1 | 07/11/2025 |
| LAWLESS AND MANGIONE ARCHITECTS AND | 1 | 05/28/2025 |
| GASBARRO STRUCTURAL ENGINEERING | 1 | 04/08/2025 |
| ROSINI ENGINEERING, PC | 2 | 03/06/2025 |
| SPACE 4 ARCHITECTURE | 1 | 03/05/2025 |
| STEVEN URAINE ARCHITECT | 2 | 07/02/2024 |
| WILLIAM F. RYAN, JR. P.E. PC | 1 | 07/01/2024 |
| JOSEPH PELL LOMBARDI, ARCHITECT | 2 | 06/30/2024 |
| MICHAEL SCHMITT ARCHITECT PC | 2 | 01/24/2024 |
| RMBA LLC | 4 | 10/04/2022 |
| ANZ CONSULTING ENGINEERING, PLLC | 2 | 09/27/2022 |
| SCALAR ARCHITECTURE PC | 1 | 09/21/2022 |
| MQ CONSULTING | 2 | 09/01/2022 |
| MCALPINE ASSOCIATES ARCHITECTS PC | 2 | 08/17/2022 |
| IP GROUP | 2 | 05/27/2021 |
| EP ENGINEERING LLC | 2 | 03/06/2020 |
| BERZAK ASSOCIATES ARCHITECTS PC | 1 | 11/12/2019 |
| STEPHEN DARGO ARCHITECT, DPC | 1 | 10/21/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 6 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 5 | 03/21/2026 |
| ANDRA CONSTANTIN EXPEDITER | 8 | 03/21/2026 |
| JENNY FLORES EXPEDITING | 3 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 1 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 4 | 03/21/2026 |
| I L CONSULTING | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| 3 AXIS CONSTRUCTION | 4 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| AVC GENERAL CONTRACTING L | General Contractor | 6 | 03/21/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 5 | 07/29/2026 |
| HUDSON PLMBING & MCH, LLC | Plumbing | 4 | 07/08/2026 |
| T.C. AIR CONDITIONING COR | General Contractor | 3 | 03/21/2026 |
| ATRIUM CONSTRUCTIONS LLC | General Contractor | 3 | 07/08/2026 |
| HLP CONTRACTING CORP | General Contractor | 3 | 03/21/2026 |
| TRIESTE CONSTRUCTION CORP | General Contractor | 3 | 04/08/2026 |
| FINE CRAFTSMAN GROUP LLC | General Contractor | 2 | 07/08/2026 |
| TOMASZ PUZA | Electrical | 2 | 03/21/2026 |
| FOLOR INC | General Contractor | 2 | 07/08/2026 |
| SALVATORE PALAZZOLO | General Contractor | 2 | 03/21/2026 |
| WEISENBERG, S | Electrical | 1 | 03/21/2026 |
| ARCO PLBG AND HTG INC | Fire Protection | 1 | 07/08/2026 |
| UNIVERSAL FIRE SPR LLC | Fire Protection | 1 | 07/08/2026 |
| DARBY CONSTRUCTION SVC LL | General Contractor | 1 | 07/08/2026 |
| DEMHA TILE INC | General Contractor | 1 | 04/09/2026 |
| G.BASSOLINO PLUMBING LTD | General Contractor | 1 | 07/08/2026 |
| MEG II DESIGN LLC | General Contractor | 1 | 07/08/2026 |
| RCD RESTORATIONS INC | General Contractor | 1 | 04/09/2026 |
| AMC PLBG, HTG & CLNG, INC | Plumbing | 1 | 07/08/2026 |
| ARCO PLBG HTG | Plumbing | 1 | 03/22/2026 |
| FLINT MECHANICAL CORP | Plumbing | 1 | 07/08/2026 |
| HERTLER NADILE P & H, INC | Plumbing | 1 | 07/08/2026 |
| IMPACT PLUMBING INC | Plumbing | 1 | 06/28/2026 |
| PLUMB-IT MECHANICAL INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TOHFAZ UDDIN P.E. | 2001 | 4 | 05/08/2026 |
| ECHO DESIGN + ARCHITECTUR | 9129 | 3 | 11/13/2025 |
| HT ENGINEERING, PLLC | 6274 | 1 | 11/13/2025 |
| GEORGE J. XERAKIAS, PE | 1658 | 1 | 06/25/2025 |
| METRIC CONSULTING AND INS | 1803 | 1 | 05/28/2025 |
| GASBARRO STRUCTURAL ENGIN | 5919 | 1 | 04/08/2025 |
| JACK GREEN ASSOCIATES | 422 | 4 | 04/08/2025 |
| ROSINI ENGINEERING, PC | 3282 | 2 | 03/06/2025 |
| SPACE4ARCHITECTURE DPC | 5306 | 1 | 03/05/2025 |
| MJ ENGINEERING & DESIGN | 5546 | 2 | 07/02/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 07/28/2026 |
| DOB NOW | Plumbing | Signed-off | PLUMB-IT MECHANICAL INC | 04/22/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 03/31/2026 |
| DOB NOW | Plumbing | Permit Issued | IMPACT PLUMBING INC | 03/02/2026 |
| DOB NOW | General Construction | Permit Issued | HLP CONTRACTING CORP | 02/17/2026 |
| DOB NOW | Plumbing | Signed-off | HUDSON PLMBING & MCH, LLC | 02/10/2026 |
| DOB NOW | General Construction | Signed-off | TRIESTE CONSTRUCTION CORP | 01/15/2026 |
| DOB NOW | General Construction | Signed-off | DEMHA TILE INC | 11/06/2025 |
| DOB NOW | General Construction | Permit Issued | RCD RESTORATIONS INC | 11/03/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | ARSENAL SCAFFOLD INC | 07/17/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | ARSENAL SCAFFOLD INC | 07/15/2025 |
| DOB NOW | Sign | Permit Issued | NATIONAL MAINTENANCE, INC | 07/14/2025 |
| DOB NOW | Structural | Signed-off | ATRIUM CONSTRUCTIONS LLC | 07/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ATRIUM CONSTRUCTIONS LLC | 07/02/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | RCD RESTORATIONS INC | 07/01/2025 |
| DOB NOW | Plumbing | Permit Issued | P.S.I. MECHANICAL | 06/17/2025 |
| DOB NOW | Sprinklers | Signed-off | ARCO PLBG AND HTG INC | 04/23/2025 |
| DOB NOW | General Construction | Signed-off | ATRIUM CONSTRUCTIONS LLC | 04/01/2025 |
| DOB NOW | Plumbing | Signed-off | HUDSON PLMBING & MCH, LLC | 02/18/2025 |
| DOB NOW | General Construction | Signed-off | TRIESTE CONSTRUCTION CORP | 01/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | FOLOR INC | 08/09/2024 |
| DOB NOW | General Construction | Signed-off | FOLOR INC | 08/08/2024 |
| DOB NOW | Plumbing | Signed-off | AMC PLBG, HTG & CLNG, INC | 07/10/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | JEPOL CONSTRUCTION INC | 03/29/2024 |
| DOB NOW | General Construction | Permit Issued | MEG II DESIGN LLC | 12/09/2022 |
| DOB NOW | General Construction | Signed-off | FINE CRAFTSMAN GROUP LLC | 07/18/2022 |
| DOB NOW | Mechanical Systems | Signed-off | G.BASSOLINO PLUMBING LTD | 05/03/2022 |
| DOB NOW | General Construction | Signed-off | AVC GENERAL CONTRACTING L | 02/23/2022 |
| DOB NOW | Plumbing | Signed-off | WNW & SONS PLBG & HTG INC | 10/27/2021 |
| DOB NOW | Plumbing | Signed-off | FLINT MECHANICAL CORP | 10/26/2021 |
| DOB NOW | General Construction | Signed-off | SALVATORE PALAZZOLO | 10/21/2021 |
| DOB NOW | General Construction | Signed-off | FINE CRAFTSMAN GROUP LLC | 08/17/2021 |
| DOB NOW | Mechanical Systems | Signed-off | T.C. AIR CONDITIONING COR | 06/09/2020 |
| DOB NOW | Mechanical Systems | Signed-off | DARBY CONSTRUCTION SVC LL | 03/26/2020 |
| DOB NOW | Sprinklers | Signed-off | UNIVERSAL FIRE SPR LLC | 03/20/2020 |
| DOB NOW | Plumbing | Signed-off | HERTLER NADILE P & H, INC | 11/13/2019 |
| BIS | PL | ISSUED | COCHRANE PLBG & HTG | 03/26/2021 |
| BIS | MH | ISSUED | FINE CRAFTSMAN GROUP LLC | 12/23/2020 |
| BIS | OT | ISSUED | DARBY CONSTRUCTION SVC LL | 02/28/2020 |
| BIS | OT | ISSUED | ABECO CONSTRUCTION LLC | 02/27/2020 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 11/13/2025 | Permit Issued | HLP CONTRACTING CORP | Heating and Air Conditioning Systems | — |
| 07/01/2024 | — | — | Air Conditioning Systems | Cooling Climatemaster TCV-060 60,000 BTU · Fan Coil Indoor ×1 |
| 09/27/2022 | — | — | Heating and Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/13/2025 | Permit Issued | IMPACT PLUMBING INC | Gas, Water/Sanitary |
| 01/24/2024 | Signed-off | GOLDS PLUMBING CORP | Water/Sanitary |
| 09/21/2022 | Permit Issued | P.S.I. MECHANICAL | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/13/2026 | Complete | BIG CITY ELECL SOLUTIONS | General Wiring |
| 05/12/2026 | Complete | TACTICAL ELECTRIC INC | — |
| 03/16/2026 | Complete | TACTICAL ELECTRIC INC | — |
| 07/23/2025 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 07/23/2025 | Permit Issued | PROFF ELECTRICAL LLC | — |
| 05/22/2025 | Permit Issued | NASH ELECTRIC SERVICES IN | — |
| 04/14/2025 | Complete | PRUDENT ELECTRIC INC | General Wiring |
| 01/02/2025 | Permit Issued | R.C.M. ELECTRIC CORP. | General Wiring |
| 09/11/2024 | Complete | RIVERDALE ELECTRIC CORP | General Wiring |
| 01/31/2024 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | General Wiring |
| 07/26/2023 | Complete | FSM ELECTRICAL CORPORATIO | General Wiring |
| 07/27/2020 | Complete | CONDUCTOR ELECL SVCS INC | General Wiring |
| 06/17/2020 | Complete | UPDATE SYSTEMS ELECTRICAL | General Wiring |
| 01/10/2020 | Permit Issued | J & F ELECL CONTNG INC | 3 meters, 3 new_meters |
| 02/15/2019 | Complete | GILSTON BROTHERS ELECT'L | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/04/2026 | Permit Issued | ARSENAL SCAFFOLD INC | Scaffold |
| 01/07/2026 | Permit Issued | ARSENAL SCAFFOLD INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2025 | Permit Issued | RCD RESTORATIONS INC | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/17/2025 | — | — | — |
| 06/25/2025 | Permit Issued | RCD RESTORATIONS INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/29/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/20/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 03/12/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/05/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 11/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/21/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/26/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/25/2025 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 05/21/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/19/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/27/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/01/2021 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/01/2021 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/01/2021 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/29/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/14/2026 | Fire-Resistant Penetrations and Joints | MD TOHFAZ UDDIN | special |
| 05/08/2026 | Fire-Resistant Penetrations and Joints | MD TOHFAZ UDDIN | special |
| 01/14/2026 | Fire-Resistant Penetrations and Joints | MD TOHFAZ UDDIN | special |
| 10/31/2025 | Final | HENRY TORRES | progress |
| 10/31/2025 | HVAC-R and service water piping design and insulation | Ajay Chopra | energy_progress |
| 10/31/2025 | Fire-Resistant Penetrations and Joints | Ajay Chopra | special |
| 10/31/2025 | Fire-Resistant Penetrations and Joints | Ajay Chopra | special |
| 10/31/2025 | Final | Ajay Chopra | progress |
| 10/31/2025 | HVAC-R and service water piping design and insulation | HENRY TORRES | energy_progress |
| 10/31/2025 | HVAC-R and service water heating system controls | HENRY TORRES | energy_progress |
| 10/31/2025 | HVAC-R and service water heating equipment | HENRY TORRES | energy_progress |
| 10/31/2025 | Fire-Resistant Penetrations and Joints | Ajay Chopra | special |
| 10/31/2025 | Mechanical Systems | HENRY TORRES | special |
| 10/31/2025 | Energy Code Compliance Inspections | HENRY TORRES | progress |
| 07/16/2025 | Interior lighting power | MD TOHFAZ UDDIN | energy_progress |
| 07/16/2025 | Lighting in dwelling units | MD TOHFAZ UDDIN | energy_progress |
| 06/11/2025 | Final | SALVATOR CARADONNA | progress |
| 05/16/2025 | Fire-Resistance Rated Construction | MD TOHFAZ UDDIN | progress |
| 05/16/2025 | Energy Code Compliance Inspections | MD TOHFAZ UDDIN | progress |
| 05/16/2025 | Fire-Resistant Penetrations and Joints | MD TOHFAZ UDDIN | special |
| 05/16/2025 | Final | MD TOHFAZ UDDIN | progress |
| 05/05/2025 | Tenant Protection Plan Compliance | SAMI HAJJAR P.E | special |
| 05/05/2025 | Energy Code Compliance Inspections | William Struth | progress |
| 05/05/2025 | Air barrier - visual inspection | William Struth | energy_progress |
| 05/05/2025 | Masonry | SAMI HAJJAR P.E | special |