1951Year Built
20Stories
D4Building Class
R10AZoning
195,000 sfGross Floor Area
142Units
LL97 CoveredRent Stabilized0 Active Violations 3 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: East End Owners · 14,100 sf lot · 13.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSuspended scaffold for facade inspection6p · 3 filings · 20 docs
Floor 14Unit 14GH1p · 1 filing · 4 docs
Floor 132p · 1 filing · 4 docs
Floor 12Unit 12C5p · 1 filing · 4 docs
Floor 11
Floor 10Unit 10B, Unit 10BI11p · 2 filings · 20 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Unit 3B6p · 1 filing · 8 docs
Floor 2Unit 2AKJ6p · 2 filings · 10 docs
Floor 1Parking Garage Structure Repair Program1 filing · 3 docs
CellarReconnect low pressure gas line4p · 3 filings · 20 docs
Site & exteriorPipe scaffold installation55p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
East End Owners11903/22/2026
Condominium Owner203/21/2026
Kreisel Co203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rand Engineering & Architecture109/28/2026
KZ Engineering506/25/2025
Ashraf403/14/2025
Paul Perdek, Professional Engineering202/26/2025
Mohammad Ahead, PE307/12/2024
John P. Fox, Architect206/14/2024
Robert Germain Jr. PE504/29/2024
Lawless & Mangione204/03/2024
Pier Fine Associates109/27/2023
Misra & Associates304/12/2023
SSA+D104/11/2023
Niza Works of Architecture403/27/2023
Joshua Jones105/05/2022
Joel Phagoo P.E211/13/2019
Royal T&E109/12/2019
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic InstallationScaffold704/09/2026
Dynamix Scaffold GroupScaffold604/09/2026
AM&G Waterproofingspecialty_contractor307/08/2026
CC Controlled Plumbing CoPlumbing307/08/2026
WCK ElectricElectrical203/21/2026
Hod Piping & HeatingPlumbing207/08/2026
McManus Mechanical Maintaspecialty_contractor203/21/2026
AM&G WaterproofingScaffold207/08/2026
Everest ScaffoldingScaffold203/21/2026
Edmund S. JosephGeneral Contractor107/08/2026
SG RenovationGeneral Contractor107/08/2026
Division One ConstructionGeneral Contractor107/08/2026
Argon ElectricalElectrical103/22/2026
Atlas Electric ContractorsElectrical103/21/2026
PK ElectricElectrical103/22/2026
P & Z ElectricElectrical103/22/2026
Coachmen ElectricElectrical103/21/2026
Air Comfort ServiceGeneral Contractor107/08/2026
Asa Building MaintenanceGeneral Contractor107/08/2026
Alef Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665706/25/2025
Robert F. Germain Jr. PE5100504/29/2024
Metric Consulting and Ins1803104/03/2024
Misra & Associates3265304/12/2023
Niza Works of Architects6101403/27/2023
O'Rourke Engineering5873103/26/2020
Joel Phagoo, PE2416111/13/2019
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 03/05/2026, status Swarmp
10/23/2026
Elevator Category 1 inspection report filed
09/28/2026
Filed — Alteration
Parking Garage Structure Repair Program. No change to Use, Egress or Occupancy.
M01447354-I1
09/02/2026
Co-op apartment 16E sold for $635,000
08/18/2026
Special inspection requirement — Final
272 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offAM&G Waterproofing09/18/2025
DOB NOWSuspended ScaffoldSigned-offAM&G Waterproofing06/20/2025
DOB NOWProtection and Mechanical MethodsSigned-offAM&G Waterproofing05/08/2025
DOB NOWSupported ScaffoldSigned-offDynamix Scaffold Group03/11/2025
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing03/05/2025
DOB NOWConstruction FenceSigned-offDynamix Scaffold Group02/06/2025
DOB NOWConstruction FenceSigned-offDynamix Scaffold Group02/06/2025
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing11/13/2024
DOB NOWSuspended ScaffoldSigned-offAM&G Waterproofing09/18/2024
DOB NOWGeneral ConstructionSigned-offAsa Building Maintenance06/25/2024
DOB NOWSuspended ScaffoldSigned-offAM&G Waterproofing06/24/2024
DOB NOWProtection and Mechanical MethodsSigned-offAM&G Waterproofing05/10/2024
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing05/02/2024
DOB NOWSupported ScaffoldSigned-offDynamix Scaffold Group03/14/2024
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group02/09/2024
DOB NOWConstruction FenceSigned-offDynamix Scaffold Group02/08/2024
DOB NOWGeneral ConstructionSigned-offMcManus Mechanical Mainta01/11/2024
DOB NOWGeneral ConstructionPermit IssuedSG Renovation09/15/2023
DOB NOWBoiler EquipmentSigned-offC C Controlled Combustion07/26/2023
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co07/26/2023
DOB NOWPlumbingSigned-offHod Piping & Heating03/24/2023
DOB NOWGeneral ConstructionSigned-offEdmund S. Joseph03/20/2023
DOB NOWPlumbingSigned-offHod Piping & Heating01/17/2023
DOB NOWGeneral ConstructionSigned-offDivision One Construction08/31/2022
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co07/25/2022
DOB NOWPlumbingSigned-offCC Controlled Plumbing Co07/18/2022
DOB NOWBoiler EquipmentSigned-offC C Controlled Combustion07/18/2022
DOB NOWMechanical SystemsSigned-offAir Comfort Service08/10/2021
DOB NOWSidewalk ShedSigned-offDynamic Installation06/12/2020
DOB NOWSidewalk ShedSigned-offDynamic Installation11/13/2019
DOB NOWSupported ScaffoldSigned-offDynamic Installation11/13/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding09/12/2019
BISOTISSUEDAM&G Waterproofing04/13/2020
BISOTISSUEDAM&G Waterproofing04/09/2020
BISOTISSUEDAM&G Waterproofing02/13/2020
BISEQISSUEDAM&G Waterproofing11/13/2019
BISOTISSUEDKTC Design Group09/23/2019
BISOTISSUEDDCH Construction09/12/2019
BISOTISSUEDAsa Building Maintenance11/07/2018
BISPLISSUEDFlint Mechanical09/12/2018
+ 42 more permits on file
14 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026CompleteE & M Electrical NYGeneral Wiring
11/13/2024CompleteAscuatech Electrical—
06/05/2024CompleteArgon Electrical—
02/15/2024CompleteHigh Quality Electric of—
01/22/2024CompleteArgon Electrical—
12/18/2023CompleteArgon Electrical—
11/29/2023CompletePK ElectricGeneral Wiring
10/10/2023CompleteArgon ElectricalGeneral Wiring
03/31/2023CompletePhilip A. RobinsonGeneral Wiring
08/23/2021CompleteL&B Electrical InternationalGeneral Wiring
03/12/2020CompleteAmer. Elevator & Mach. CoGeneral Wiring
02/17/2020CompleteAxcel Electric CoGeneral Wiring
09/10/2019CancelledBorowide Elect'l Contractors—
05/15/2018CompleteP & Z ElectricGeneral Wiring
1 project · most recent 09/28/2026
Steel Concrete
FiledStatusContractorScope
09/28/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
08/18/2026Final—progress
08/18/2026Tenant Protection Plan Compliance—special
08/18/2026Structural Steel - Welding—special
08/18/2026Sprayed fire-resistant materials—special
08/18/2026Post-installed Anchors—special
08/18/2026Concrete - Cast-In-Place—special
08/18/2026Structural Steel - Details—special
07/11/2025Post-installed AnchorsKarol Zdancewiczspecial
07/11/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
06/23/2025Post-installed AnchorsKarol Zdancewiczspecial
06/23/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
03/25/2025Post-installed AnchorsKarol Zdancewiczspecial
03/25/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
07/29/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
07/29/2024Post-installed AnchorsKarol Zdancewiczspecial
06/24/2024Lighting in dwelling unitsBRIAN O'ROURKEenergy_progress
06/24/2024FinalBRIAN O'ROURKEprogress
06/12/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
06/12/2024Post-installed AnchorsKarol Zdancewiczspecial
06/11/2024Lighting in dwelling units—energy_progress
06/11/2024Final—progress
04/29/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
04/29/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
02/20/2024HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
02/20/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
Latest 25 of 52.
849 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account