← Back
BuildNYC
Elevator cooperative
45 WEST 10TH STREET
MANHATTAN · Greenwich Village · BIN 1009558
💬 Discuss this project
1959Year Built
11Stories
D4Building Class
R6Zoning
77,829 sfGross Floor Area
90Units
LL97 CoveredRent Stabilized76 Active Violations 2 likely answered 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 45 W 10 Tenants · 11,315 sf lot · 6.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTemporary pipe scaffold installation2 filings
RoofWelded frame scaffolding installation1 filing · 4 docs
Floor 11Unit PH, Unit PHC1 filing · 10 docs
Floor 104p · 1 filing · 8 docs
Floor 9
Floor 8Unit 8A, Unit 8B, Unit 8EFUnder Construction1p · 4 filings · 8 docs
Floor 7Unit 7CD2 filings · 1 doc
Floor 6Unit 6B, Unit 6D, Unit 6E3 filings · 3 docs
Floor 5
Floor 4Unit 4J, Unit 4CD1 filing · 1 doc
Floor 3Unit 3C
Floor 2Unit 2EF2 filings · 1 doc
Floor 1Unit 1G1 filing · 1 doc
CellarGarage crack repair1 filing · 3 docs
Site & exteriorInstallation of sidewalk shed2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
45 WEST10TENANTS'7403/22/2026
45 West 10303/21/2026
45 W Ten Tenants Coporation203/21/2026
Lawrence Properties103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sol Building Consulting Services1003/21/2026
Jared Development1403/21/2026
Epac Building Consulting803/21/2026
Howard L Zimmerman Architects403/21/2026
J Callahan Consulting1003/21/2026
J.A.M. Associates603/21/2026
Theresa Voltaggio203/21/2026
AE Design Solution203/21/2026
Stonecore403/21/2026
Aca Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sawera InteriorsGeneral Contractor603/21/2026
Creo ProjectsGeneral Contractor507/08/2026
Kings Group NYScaffold407/08/2026
Empire Rest & ManagementGeneral Contractor403/21/2026
Systems 2000 Plumbing ServicesPlumbing307/08/2026
Empire NY InstallationsScaffold303/21/2026
MBQ ContractingGeneral Contractor303/21/2026
Dola ContractingGeneral Contractor303/21/2026
Ark Design & BuildGeneral Contractor207/08/2026
L&J PLG & Heating Co of NYPlumbing207/08/2026
Innovative Heating SolutiPlumbing207/08/2026
AP Plumbing & HVACPlumbing107/08/2026
CBB PlumbingPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Procore MechanicalPlumbing107/08/2026
Village P & H NYPlumbing107/08/2026
JLC Electrical ContractingElectrical103/21/2026
Vrisi Plumbing & HeatingPlumbing106/27/2026
Clairmont Electrical ContractingElectrical103/22/2026
T. McCaffrey-T. McGovernElectrical103/21/2026
Timothy Coleman LicensedElectrical103/21/2026
Demari ServicesGeneral Contractor107/08/2026
Hope Home ImprovementGeneral Contractor107/08/2026
Kaieteur ConstructionGeneral Contractor104/09/2026
Lewis Construction NYCGeneral Contractor107/08/2026
Vivid Home FinishesGeneral Contractor106/28/2026
L & Z RestorationScaffold107/08/2026
AAA Total PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803208/13/2026
Howard L Zimmerman Architects1712306/11/2026
Winton Group Architecture4343106/04/2026
S&S Concrete & Soil Testi1008409/10/2025
Cowley Engineering186207/08/2024
Richmond Testing Lab263301/02/2024
Michael Tower Architectur8029511/30/2023
ARCHITECTURE+CONSTRUCTION1326308/08/2023
Jaj Engineering930108/07/2023
AA Building & Inspection1519107/25/2023
ADG Achitecture and Desig3044304/17/2023
Katz Engineering238312/01/2021
Special Inspection Services1200307/15/2021
Navi Structural Engineering4624103/01/2021
Building Lifecycle
All (283)Filed (45)Permit Issued (34)Signed Off (18)Facade (FISP) (15)Violation (60)Inspection (25)Objection (56)Special Inspection (30)
09/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2026
Filed — Alteration
REPLACE AND INSTALL FIXTURES FOR APT PHC AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01444224-I1
08/13/2026
Filed — Alteration
REPLACE AND INSTALL FIXTURES FOR APT PHC AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01444224-S1
07/14/2026
Special inspection requirement — Post-installed Anchors
Jon Colatrella
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
07/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/24/2026
Permit issued — Plumbing
M01399337-S1-PL
06/22/2026
Permit issued — General Construction
M01399337-I1-GC
06/17/2026
Objection resolved — Addressed
06/17/2026
Objection resolved — Addressed
06/11/2026
Filed — Alteration
Replacement of existing building gas risers and new connections to existing apartment stoves per plans. No change in use, egress or occupancy.
M01058096-P2
06/10/2026
Objection raised — Scope
06/10/2026
Objection raised — Other
06/04/2026
Filed — Alteration
COMBINATION OF APTS FILED IN CONJUNCTION WITH DDB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01399337-I1
06/04/2026
Filed — Alteration
COMBINATION OF APTS FILED IN CONJUNCTION WITH DDB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01399337-S1
05/04/2026
Permit issued — Plumbing
M01058096-I1-PL
01/20/2026
Signed off — Alteration
Replaced plumbing fixtures of the existing 3-pc bathroom in APT#6D as per submitted drawings.
M01211831-I1
01/06/2026
Permit issued — General Construction
M01211831-I1-GC
12/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01254220-I1
11/25/2025
Permit issued — Plumbing
M01058096-I1-PL
10/06/2025
Objection resolved — Addressed
10/06/2025
Objection resolved — Addressed
09/24/2025
Objection raised — Scope
09/24/2025
Objection raised — Scope
09/10/2025
Filed — Alteration
Replaced plumbing fixtures of the existing 3-pc bathroom in APT#6D as per submitted drawings.
M01211831-I1
09/10/2025
Filed — Alteration
Replaced plumbing fixtures of the existing 3-pc bathroom in APT#6D as per submitted drawings.
M01211831-S2
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
GLEN LANGER
07/31/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01254220-I1
07/31/2025
Permit issued — Supported Scaffold
M01254220-I1-SF
06/13/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
GLEN LANGER
04/16/2025
Special inspection requirement — Final
GLEN LANGER
03/28/2025
Filed — Alteration
Replacement of existing building gas risers and new connections to existing apartment stoves per plans. No change in use, egress or occupancy.
M01058096-P1
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jon Colatrella
03/26/2025
Special inspection requirement — Post-installed Anchors
Jon Colatrella
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/24/2024
Permit issued — Plumbing
M01058096-I1-PL
10/15/2024
Objection raised — Scope
10/15/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
08/29/2024
Signed off — Alteration
Renovate the existing kitchen and 3-pc bathroom.
M00889537-I1
08/22/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/02/2024
Objection raised — Fire_Protection
08/02/2024
Objection raised — Mechanical
07/25/2024
Filed — Alteration
Replacement of existing building gas risers and new connections to existing apartment stoves per plans. No change in use, egress or occupancy.
M01058096-I1
07/10/2024
Signed off — Alteration
Garage Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00910966-I1
07/10/2024
Special inspection requirement — Concrete - Cast-In-Place
Eric Cowley
07/10/2024
Special inspection requirement — Final
Eric Cowley
07/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
07/10/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
07/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Eric Cowley
07/08/2024
Filed — Alteration
Garage Repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00910966-P1
06/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Cowley
06/13/2024
Special inspection requirement — Final
Eric Cowley
06/13/2024
Special inspection requirement — Concrete - Cast-In-Place
Eric Cowley
06/13/2024
Special inspection requirement — Post-installed Anchors
Eric Cowley
05/31/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
Latest 60 of 283 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedVrisi Plumbing & Heating06/24/2026
DOB NOWGeneral ConstructionPermit IssuedVivid Home Finishes06/22/2026
DOB NOWPlumbingSigned-offSystems 2000 Plumbing Services05/04/2026
DOB NOWGeneral ConstructionSigned-offKaieteur Construction01/06/2026
DOB NOWPlumbingSigned-offSystems 2000 Plumbing Services11/25/2025
DOB NOWSupported ScaffoldSigned-offEmpire NY Installations I07/31/2025
DOB NOWPlumbingSigned-offSystems 2000 Plumbing Services10/24/2024
DOB NOWGeneral ConstructionSigned-offDemari Services01/24/2024
DOB NOWPlumbingPermit IssuedAAA Total Plumbing10/30/2023
DOB NOWMechanical SystemsPermit IssuedArk Design & Build09/15/2023
DOB NOWGeneral ConstructionPermit IssuedArk Design & Build09/06/2023
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating08/30/2023
DOB NOWGeneral ConstructionPermit IssuedMBQ Contracting08/14/2023
DOB NOWGeneral ConstructionSigned-offHope Home Improvement07/26/2023
DOB NOWGeneral ConstructionSigned-offDola Contracting06/01/2023
DOB NOWGeneral ConstructionSigned-offSawera Interiors03/06/2023
DOB NOWPlumbingSigned-offCBB Plumbing03/06/2023
DOB NOWPlumbingSigned-offMitie Plumbing & Heating03/03/2023
DOB NOWGeneral ConstructionSigned-offLewis Construction NYC02/27/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating01/09/2023
DOB NOWGeneral ConstructionSigned-offSawera Interiors01/06/2023
DOB NOWPlumbingPermit IssuedVillage P & H NY08/10/2022
DOB NOWPlumbingSigned-offMitie Plumbing & Heating03/29/2022
DOB NOWPlumbingPermit IssuedL&J PLG & Heating Co of NY12/16/2021
DOB NOWGeneral ConstructionSigned-offEmpire Rest Management12/09/2021
DOB NOWPlumbingSigned-offL&J PLG & Heating Co of NY09/07/2021
DOB NOWGeneral ConstructionSigned-offEmpire Rest Management07/09/2021
DOB NOWGeneral ConstructionSigned-offCreo Projects06/30/2021
DOB NOWPlumbingSigned-offProcore Mechanical05/03/2021
DOB NOWMechanical SystemsSigned-offCreo Projects04/29/2021
DOB NOWGeneral ConstructionSigned-offCreo Projects04/29/2021
DOB NOWSupported ScaffoldSigned-offMichael Dellavecchia & Sons03/25/2021
DOB NOWSidewalk ShedSigned-offKings Group NY10/27/2020
DOB NOWSupported ScaffoldSigned-offKings Group NY10/21/2020
BISOTISSUEDNick Villani and Co08/15/2022
BISOTISSUEDNick Villani and Co01/21/2022
BISOTISSUEDL & Z Restoration02/18/2021
BISOTISSUEDL & Z Restoration12/30/2020
BISOTISSUEDDesign Procure Builders09/04/2019
BISPLISSUEDArcon Plumbing Solutions06/27/2019
+ 44 more permits on file
1 project · most recent 08/08/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/08/2023Permit IssuedArk Design & BuildVentilation Systems
Ventilation
__Junk__ TBD 50 CFM · Kitchen Exhaust ×1
7 projects · most recent 08/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/13/2026——Water/Sanitary
06/11/2026Signed-offSystems 2000 Plumbing ServicesGas
06/04/2026Permit IssuedVrisi Plumbing & HeatingGas, Water/Sanitary
09/10/2025——Water/Sanitary
09/12/2023——Gas, Water/Sanitary
08/08/2023Permit IssuedAAA Total PlumbingGas, Water/Sanitary
07/25/2023Permit IssuedAP Plumbing & HVACGas, Water/Sanitary
23 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedOff Shore ElectricGeneral Wiring
08/29/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
08/26/2023Permit IssuedClairmont Electrical ContractingGeneral Wiring
08/24/2023Permit IssuedAccurate ElectricalGeneral Wiring
08/17/2023Permit IssuedHecmar ElectricGeneral Wiring
02/27/2023CompleteEcny Electrical Contractors—
02/25/2023Permit IssuedCresco ElectricalGeneral Wiring
01/11/2023Permit IssuedTop Notch ElectricGeneral Wiring
03/01/2022CompletePaterny ElectricGeneral Wiring
01/29/2022CompleteDesuze ElectricGeneral Wiring
12/17/2021Permit IssuedSmart Electric ServicesGeneral Wiring
11/10/2021Permit IssuedTriple D ElectricGeneral Wiring
08/17/2021Permit IssuedSmart Electric ServicesGeneral Wiring
05/17/2021CompletePowerone Elect'l Contracting13 meters, 1 new_meters
05/05/2021CompleteMLS ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
09/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/22/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/31/2024Fail-Final General Construction Non-Directive 14FailView ↗
02/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/04/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/01/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
07/14/2026Post-installed AnchorsJon Colatrellaspecial
07/14/2026Tenant Protection Plan Compliance—special
07/14/2026Fire-Resistant Penetrations and JointsJon Colatrellaspecial
09/10/2025Tenant Protection Plan ComplianceGLEN LANGERspecial
04/16/2025Tenant Protection Plan ComplianceGLEN LANGERspecial
04/16/2025FinalGLEN LANGERprogress
03/26/2025Tenant Protection Plan Compliance—special
03/26/2025Fire-Resistant Penetrations and JointsJon Colatrellaspecial
03/26/2025Post-installed AnchorsJon Colatrellaspecial
07/10/2024Concrete - Cast-In-PlaceEric Cowleyspecial
07/10/2024Post-installed AnchorsEric Cowleyspecial
07/10/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
07/10/2024FinalEric Cowleyprogress
07/10/2024Tenant Protection Plan ComplianceEric Cowleyspecial
06/14/2024Tenant Protection Plan Compliance—special
06/13/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
06/13/2024Post-installed AnchorsEric Cowleyspecial
06/13/2024Concrete - Cast-In-PlaceEric Cowleyspecial
06/13/2024FinalEric Cowleyprogress
01/19/2024Fire-Resistant Penetrations and JointsRICHARD LEMANSKYspecial
12/07/2023Fire-Resistant Penetrations and JointsMichael Towerspecial
11/28/2023Fire-Resistant Penetrations and JointsMichael Towerspecial
10/25/2023Fire-Resistant Penetrations and JointsMichael Towerspecial
09/17/2023Tenant Protection Plan ComplianceGLEN LANGERspecial
09/17/2023Fire-Resistance Rated ConstructionGLEN LANGERprogress
Latest 25 of 87.
▾Documents — 729 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch35
09/03/2026M00530626-I1Request digital key ↗
09/03/2026M00612646-S1Request digital key ↗
09/03/2026M00612646-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00471174-P1Request digital key ↗
09/04/2026M00471174-I1Request digital key ↗
09/02/2026M00325275-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00465199-P1Request digital key ↗
08/15/2026M00465199-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00474283-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00405182-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00405165-I1Request digital key ↗
▸Applications & Permits135
▸BISWORK PERMIT APPLICATION47
01/21/2022140972008Open ↗
12/30/2020123794126Open ↗
09/24/2019123775708Open ↗
Showing 3 of 47 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION42
06/14/2024101337064Open ↗
05/02/2023122359857Open ↗
05/02/2023122359857Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWLPC Approval/Permit41
09/04/2026M00474283-I1Open ↗
09/03/2026M00465199-P1Open ↗
08/24/2026M01058096-P1Open ↗
Showing 3 of 41 on file for this type
▸BISLL114/19 PERMIT RESTRICTION3
01/21/2022140972008Open ↗
07/22/2021123794126Open ↗
12/30/2020123794126Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
11/12/2020123794126Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
11/12/2020123794126Open ↗
▸Seals & Professional Certifications199
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION65
02/13/2020123794126Open ↗
02/12/2020123890968Open ↗
02/12/2020123890968Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature45
09/04/2026M00405182-I1Open ↗
09/04/2026M00474283-I1Open ↗
09/03/2026M00465199-P1Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
10/08/2026M00910966-P1Open ↗
10/02/2026M08033262-I1Open ↗
09/29/2026M01211831-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
10/08/2026M00910966-P1Open ↗
09/29/2026M01211831-I1Open ↗
09/25/2026M00530626-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
11/20/2019123110212Open ↗
08/12/2019123775708Open ↗
08/07/2019123775708Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
07/05/2019123775708Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/19/2020140972008Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/19/2020140972008Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
07/05/2019123775708Open ↗
04/26/2019123890968Open ↗
03/05/2019123676307Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes12
01/21/2021140972008Open ↗
07/05/2019123775708Open ↗
04/26/2019123890968Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/21/2020123794126Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos59
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
09/03/2026M00612646-I1Open ↗
09/03/2026M00612646-S1Open ↗
09/01/2026M08038901-S1Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
11/19/2020140972008Open ↗
02/13/2020123794126Open ↗
08/07/2019123775708Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/04/2026M00474283-I1Open ↗
08/15/2026M00868223-S2Open ↗
08/15/2026M00868223-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/27/2019123890968Open ↗
▸Energy Compliance48
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
02/04/2020123075215Open ↗
11/20/2019123110212Open ↗
11/19/2019123110212Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
02/04/2020123075215Open ↗
11/19/2019123110212Open ↗
02/16/2018123056691Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/26/2023122359857Open ↗
03/12/2021123775708Open ↗
01/25/2021123676307Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
05/26/2023122359857Open ↗
01/18/2022123775708Open ↗
01/25/2021123676307Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC EXEMPTION1
11/19/2020140972008Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/26/2023122359857Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/26/2023122359857Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
05/20/2019123890968Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY20
06/17/2024101337064Open ↗
12/04/2023140972008Open ↗
12/04/2023140972008Open ↗
Showing 3 of 20 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/17/2019123071497Open ↗
▸Approvals, Objections & Sign-offs67
▸BISLANDMARKS APPROVAL28
01/21/2021140972008Open ↗
08/21/2020123794126Open ↗
02/12/2020123890968Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
12/05/2023140972008Open ↗
08/15/2023122359857Open ↗
01/18/2022123775708Open ↗
Showing 3 of 26 on file for this type
▸BISLANDMARKS SIGNOFF4
12/05/2023140972008Open ↗
08/15/2023122359857Open ↗
01/18/2022123775708Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/12/2020123890968Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL2
05/26/2023122359857Open ↗
01/18/2022123775708Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT43
06/17/2024101337064Open ↗
06/17/2024101337064Open ↗
05/03/2023122359857Open ↗
Showing 3 of 43 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
12/04/2023140972008Open ↗
05/26/2023122359857Open ↗
01/18/2022123775708Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
05/16/2019123676307Open ↗
▸Filing & Intake Forms60
▸BISEFILING COVER SHEET22
02/13/2020123794126Open ↗
07/05/2019123775708Open ↗
04/26/2019123890968Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION20
08/04/2022140972008Open ↗
01/21/2021140972008Open ↗
12/08/2020140972008Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM14
12/23/2020123794126Open ↗
02/12/2020123890968Open ↗
02/12/2020123890968Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/19/2020140972008Open ↗
Showing 1 of 4 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProof of Historic Building3
08/24/2026M01058096-I1Open ↗
08/24/2026M01058096-P1Open ↗
08/13/2026M01058096-P2Open ↗