← Back
Special Inspection Agency
MICHAEL TOWER ARCHITECTUR
Special Inspection Agency
6 projects with open permitsMANHATTAN · 13BROOKLYN · 2QUEENS · 1
12 buildings
23
Total Filings
16
Projects on File
12
Buildings Worked
6
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month16 projects all-time
0123May '21 · 1Jun '21 · 1Mar '22 · 1Dec '22 · 2Jan '23 · 1Apr '23 · 1Jun '23 · 1Jul '23 · 2Dec '23 · 1Jan '24 · 1Oct '25 · 1Jan '26 · 1Mar '26 · 1Jul '26 · 120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit638%
Signed off1062%
By project type
Alteration16
Most active buildings
All buildings →
3750 BROADWAYMANHATTAN · 3 open · latest 10/27/2023
3 projects
45 WEST 10 STREETMANHATTAN · latest 03/06/2023
2 projects
1056 5 AVENUEMANHATTAN · latest 10/31/2024
2 projects
372 5 AVENUEMANHATTAN · latest 04/23/2026
1 projects
155 EAST 38 STREETMANHATTAN · 1 open · latest 08/24/2026
1 projects
1178 MADISON AVENUEMANHATTAN · 1 open · latest 12/19/2025
1 projects
Key relationships
Everyone →
Filing representatives
Owners
3 projects
1 projects
1 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01409836 ↗155 EAST 38 STREET
MANHATTAN
AlterationPermit Issued07/21/202608/24/2026Interior alteration of existing apartment 12J, renovation of kitchen and bathrooms, revise nonloadbearing partitions and finishes. No change…
M01370594 ↗372 5 AVENUE
MANHATTAN
AlterationSigned-off03/13/202604/23/2026Interior modification existing apartment 9th floor, Apt. 9J limited removal nonloadbearing partitions; install new nonstructural metalstud p…
B01311952 ↗119 PARK PLACE
BROOKLYN
AlterationPermit Issued01/16/202602/03/2026INTERIOR RENOVATION TO 2 FAMILY DWELLING. REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. NO CHANGE TO …
M01271637 ↗1178 MADISON AVENUE
MANHATTAN
AlterationPermit Issued10/17/202512/19/2025
Owner Orsid NY
Contractor MON-RAD INC
DEMOLISH MINOR PARTITIONS. CONSTRUCT NEW PARTITIONS AND NEW FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00802973 ↗1056 5 AVENUE
MANHATTAN
AlterationSigned-off04/06/202310/31/2024
Contractor B H RESTORATION
RENOVATION OF EXISTING APARTMENT 6E. INSTALLATION OF PROPOSED THROUGH THE WALL PTAC UNITS BENEATH EXISTING WINDOW OPENINGS. AS PER PLANS FIL…
M00959839 ↗2681 BROADWAY
MANHATTAN
AlterationSigned-off12/12/202303/01/2024DEMOLISH MINOR PARTITIONS. CONSTRUCT NEW PARTITIONS AND NEW FINISHES. NO CHANGE OF USE, OCCUPANCY, EGRESS, OR ZONING IN THIS APPLICATION
Counts cover all 16 projects (16 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
MICHAEL TOWER ARCHITECTURE1407/21/2026
ROSENTHAL ENGINEERING PLLC211/17/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
DMC PROFESSIONAL CONTRACT204/06/2023
MASTER INTERIORS CORP207/07/2023
SAWERA INTERIORS CORP212/14/2022
STREAMLINE USA LLC201/26/2024
B & H RESTORATION INC104/06/2023
DYNAMIC BLUE WATER MECH107/21/2026
HAKKA CONTRACTING, INC103/23/2022
JARLATH CONNAUGHTON104/27/2026
LAND & SHORE CREATIVE LLC101/16/2026
MON-RAD INC101/30/2026
NEW YORK PARK PLBG&HTG CO111/17/2023
ORBIT PLBG & HTG INC111/30/2023
SLAWEK HOME IMPROVEMENT L112/12/2023
WK RENOVATION CORP107/21/2026
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BO'S BAGELS311/17/2023
AKAM ASSOCIATES, INC.101/26/2024
BELAIR CORP112/12/2023
ORSID NY101/30/2026
PARK LANEN NORTH OWNERS CORP.103/23/2022
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
SOL BUILDING CONSULTING SERVICES1407/21/2026
16 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 16Open permit 6Signed off 10
16 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01409836 ↗155 EAST 38 STREET
MANHATTAN
AlterationPermit Issued07/21/202608/24/2026Interior alteration of existing apartment 12J, renovation of kitchen and bathrooms, revise nonloadbearing partitions and finishes. No change…
M01370594 ↗372 5 AVENUE
MANHATTAN
AlterationSigned-off03/13/202604/23/2026Interior modification existing apartment 9th floor, Apt. 9J limited removal nonloadbearing partitions; install new nonstructural metalstud p…
B01311952 ↗119 PARK PLACE
BROOKLYN
AlterationPermit Issued01/16/202602/03/2026INTERIOR RENOVATION TO 2 FAMILY DWELLING. REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. NO CHANGE TO …
M01271637 ↗1178 MADISON AVENUE
MANHATTAN
AlterationPermit Issued10/17/202512/19/2025
Owner Orsid NY
Contractor MON-RAD INC
DEMOLISH MINOR PARTITIONS. CONSTRUCT NEW PARTITIONS AND NEW FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00802973 ↗1056 5 AVENUE
MANHATTAN
AlterationSigned-off04/06/202310/31/2024
Contractor B H RESTORATION
RENOVATION OF EXISTING APARTMENT 6E. INSTALLATION OF PROPOSED THROUGH THE WALL PTAC UNITS BENEATH EXISTING WINDOW OPENINGS. AS PER PLANS FIL…
M00959839 ↗2681 BROADWAY
MANHATTAN
AlterationSigned-off12/12/202303/01/2024DEMOLISH MINOR PARTITIONS. CONSTRUCT NEW PARTITIONS AND NEW FINISHES. NO CHANGE OF USE, OCCUPANCY, EGRESS, OR ZONING IN THIS APPLICATION
M00985328 ↗1408 2 AVENUE
MANHATTAN
AlterationSigned-off01/26/202402/05/2024Interior renovation of existing apartment #28C, including minor partition work. As per plans filed herewith. No change in use, egress, or oc…
M00891788 ↗3750 BROADWAY
MANHATTAN
AlterationPermit Issued07/07/202310/27/2023Installation of condensing units and air handling mechanical equipment as per plans filed herewith. no change in use, egress or occupancy
M00802775 ↗1056 5 AVENUE
MANHATTAN
AlterationSigned-off01/12/202310/04/2023
Contractor ANTHONY DIFALCO
RENOVATION OF AN EXISTING APT 6E. DEMOLISH MINOR PARTITIONS. CONSTRUCT NEW PARTITIONS AND NEW FINISHES. AS PER PLANS FILED HEREWITH. NO CHAN…
M00891778 ↗3750 BROADWAY
MANHATTAN
AlterationPermit Issued07/05/202308/14/2023Removal & Replacement of Plumbing fixtures and Replacement of Gas Appliances. As per plans filed herewith, no change to use, occupancy or eg…
M00886682 ↗3750 BROADWAY
MANHATTAN
AlterationPermit Issued06/16/202308/04/2023DEMOLISH MINOR PARTITIONS. CONSTRUCT NEW PARTITIONS AND NEW FINISHES. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M08034085 ↗45 WEST 10 STREET
MANHATTAN
AlterationSigned-off12/14/202203/06/2023DEMOLISH MINOR PARTITIONS. CONSTRUCT NEW PARTITIONS AND NEW FINISHES. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M08033262 ↗45 WEST 10 STREET
MANHATTAN
AlterationSigned-off12/14/202201/09/2023REMOVE EXISTING FIXTURES. REPLACE AND RELOCATE NEW FIXTURES. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00695183 ↗118-17 UNION TURNPIKE
QUEENS
AlterationSigned-off03/23/202205/24/2022Interior renovation to combine two existing apartment apt 18E and apt. 18F. Including the removal and installation of non-bearing partitions…
M00510252 ↗2 HORATIO STREET
MANHATTAN
AlterationSigned-off05/05/202108/20/2021Combination of existing 4th floor apartments 4S & 4J, including demolition minor partitions, construction of new partitions with new fixture…
B00526850 ↗70 GREENPOINT AVENUE
BROOKLYN
AlterationSigned-off06/03/202107/16/2021Construct new partitions with new fixtures at new and existing locations as per plans filed herewith. No change of use, egress, or occupancy…
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
155 EAST 38 STREET ↗107/21/2026
372 5 AVENUE ↗204/27/2026
1178 MADISON AVENUE ↗201/30/2026
119 PARK PLACE ↗101/16/2026
1408 2 AVENUE ↗101/26/2024
2681 BROADWAY ↗112/12/2023
45 WEST 10 STREET ↗511/30/2023
3750 BROADWAY ↗511/17/2023
1056 5 AVENUE ↗204/06/2023
118-17 UNION TURNPIKE ↗103/23/2022
70 GREENPOINT AVENUE ↗106/03/2021
2 HORATIO STREET ↗105/05/2021
▾Special Inspection Requirements — 64
DateRequirementBuildingInspectorRole
06/03/2026Lighting in dwelling units155 EAST 38 STREETMichael Towerenergy_progress
06/01/2026Final155 EAST 38 STREETMichael Towerprogress
06/01/2026Energy Code Compliance Inspections155 EAST 38 STREETMichael Towerprogress
06/01/2026Fire-Resistant Penetrations and Joints155 EAST 38 STREETMichael Towerspecial
04/28/2026Fire-Resistant Penetrations and Joints372 5 AVENUEMichael Towerspecial
04/28/2026Energy Code Compliance Inspections372 5 AVENUEMichael Towerprogress
04/28/2026Final372 5 AVENUEMichael Towerprogress
04/28/2026Lighting in dwelling units372 5 AVENUEMichael Towerenergy_progress
04/27/2026Fire-Resistant Penetrations and Joints372 5 AVENUEMichael Towerspecial
04/27/2026Energy Code Compliance Inspections372 5 AVENUEMichael Towerprogress
04/27/2026Final372 5 AVENUEMichael Towerprogress
04/27/2026Lighting in dwelling units372 5 AVENUEMichael Towerenergy_progress
01/26/2026Tenant Protection Plan Compliance1178 MADISON AVENUEMichael Towerspecial
01/26/2026Energy Code Compliance Inspections1178 MADISON AVENUEMichael Towerprogress
01/26/2026Final1178 MADISON AVENUEMichael Towerprogress
01/26/2026Lighting in dwelling units1178 MADISON AVENUEMichael Towerenergy_progress
01/26/2026Post-installed Anchors1178 MADISON AVENUEANTHONY UGBEBORspecial
01/26/2026Fire-Resistant Penetrations and Joints1178 MADISON AVENUEMichael Towerspecial
01/26/2026Masonry1178 MADISON AVENUEANTHONY UGBEBORspecial
01/16/2024Fire-Resistant Penetrations and Joints1408 2 AVENUEMichael Towerspecial
01/16/2024Energy Code Compliance Inspections1408 2 AVENUEMichael Towerprogress
01/16/2024Lighting in dwelling units1408 2 AVENUEMichael Towerenergy_progress
01/04/2024Final1408 2 AVENUEMichael Towerprogress
11/28/2023Fire-Resistant Penetrations and Joints45 WEST 10 STREETMichael Towerspecial
11/20/2023Fire-Resistant Penetrations and Joints3750 BROADWAYMichael Towerspecial
11/20/2023Tenant Protection Plan Compliance3750 BROADWAY—special
11/17/2023Tenant Protection Plan Compliance3750 BROADWAY—special
11/17/2023Fire-Resistant Penetrations and Joints3750 BROADWAYMichael Towerspecial
11/08/2023Fire-Resistant Penetrations and Joints2681 BROADWAYMichael Towerspecial
11/08/2023Final2681 BROADWAYMichael Towerprogress
11/08/2023Energy Code Compliance Inspections2681 BROADWAYMichael Towerprogress
11/08/2023Lighting in dwelling units2681 BROADWAYMichael Towerenergy_progress
10/25/2023Fire-Resistant Penetrations and Joints45 WEST 10 STREETMichael Towerspecial
10/18/2023Fire-Resistant Penetrations and Joints3750 BROADWAYMichael Towerspecial
10/18/2023Tenant Protection Plan Compliance3750 BROADWAY—special
07/27/2023Fire-Resistant Penetrations and Joints45 WEST 10 STREETMichael Towerspecial
07/07/2023Energy Code Compliance Inspections3750 BROADWAYANTHONY UGBEBORprogress
07/07/2023Shutoff dampers3750 BROADWAYANTHONY UGBEBORenergy_progress
07/07/2023HVAC-R and service water heating system controls3750 BROADWAYANTHONY UGBEBORenergy_progress
07/07/2023HVAC-R and service water piping design and insulation3750 BROADWAYANTHONY UGBEBORenergy_progress
07/07/2023HVAC-R and service water heating equipment3750 BROADWAYANTHONY UGBEBORenergy_progress
06/16/2023Mechanical Systems3750 BROADWAYANTHONY UGBEBORspecial
06/16/2023Tenant Protection Plan Compliance3750 BROADWAYMichael Towerspecial
06/16/2023Final3750 BROADWAYANTHONY UGBEBORprogress
01/11/2023Energy Code Compliance Inspections1056 5 AVENUEFRANCISCO PEREZprogress
01/11/2023Lighting in dwelling units1056 5 AVENUEMichael Towerenergy_progress
01/11/2023Energy Code Compliance Inspections1056 5 AVENUEMichael Towerprogress
01/11/2023Fire-Resistant Penetrations and Joints1056 5 AVENUEMichael Towerspecial
01/11/2023HVAC-R and service water heating equipment1056 5 AVENUEFRANCISCO PEREZenergy_progress
01/11/2023HVAC-R and service water heating system controls1056 5 AVENUEFRANCISCO PEREZenergy_progress
Latest 50 of 64.
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
09/03/2026M00510252-I1 · 2 HORATIO STREETRequest digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
09/03/2026M00510252-I1 · 2 HORATIO STREETOpen ↗
08/13/2026M00802775-I1 · 1056 5 AVENUEOpen ↗
08/13/2026M00802973-I1 · 1056 5 AVENUEOpen ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications79
▸DOB NOWProgress Inspector Seal & Signature33
09/02/2026M01370594-I1 · 372 5 AVENUEOpen ↗
09/02/2026M01370594-I1 · 372 5 AVENUEOpen ↗
09/02/2026M01370594-I1 · 372 5 AVENUEOpen ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/03/2026M00510252-I1 · 2 HORATIO STREETOpen ↗
09/01/2026B00526850-I1 · 70 GREENPOINT AVENUEOpen ↗
09/01/2026M08034085-I1 · 45 WEST 10 STREETOpen ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/22/2026M00891778-P2 · 3750 BROADWAYOpen ↗
09/17/2026M08033262-P1 · 45 WEST 10 STREETOpen ↗
09/02/2026M01370594-I1 · 372 5 AVENUEOpen ↗
Showing 3 of 22 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist1
08/13/2026B01311952-I1 · 119 PARK PLACEOpen ↗
▸DOB NOWHPD-1: Anti-Harassment Area Checklist1
08/13/2026B00526850-I1 · 70 GREENPOINT AVENUEOpen ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/03/2026M00510252-I1 · 2 HORATIO STREETOpen ↗
09/01/2026B00526850-I1 · 70 GREENPOINT AVENUEOpen ↗
09/01/2026M08034085-I1 · 45 WEST 10 STREETOpen ↗
Showing 3 of 22 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026M01271637-I1 · 1178 MADISON AVENUEOpen ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00510252-I1 · 2 HORATIO STREETOpen ↗
08/13/2026B00526850-I1 · 70 GREENPOINT AVENUEOpen ↗
08/13/2026Q00695183-I1 · 118-17 UNION TURNPIKEOpen ↗