450 WEST 15TH STREET
MANHATTAN · BIN 1080355
💬 Discuss this project
1936Year Built
8Stories
O6Building Class
M1-5Zoning
281,361 sfGross Floor Area
30Units
LL97 Covered4 Active Violations 2 unresolved · 2 paperwork only ▸FISP: No Report Filed
Office with commercial, 7-19 stories · Owner of record: Black Lark Enterprises · 34,188 sf lot · 8.23 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsGoogle10 filings
RoofT-MobileUnder Construction7p · 8 filings · 20 docs
PenthouseAntenna site decom and removal1 filing · 8 docs
Floor 7Structural modifications 6th and 7th floors facade repair1p · 1 filing · 8 docs
Floor 6Google5p · 5 filings · 8 docs
Floor 5
Floor 4Giorgio Armani Corporate1 filing
Floor 3Giorgio Armani Corporate1p · 1 filing
Floor 2
Floor 1GoogleUnder Construction6p · 15 filings · 20 docs
CellarGoogle8p · 6 filings · 20 docs
BasementAntenna site decom and removal1p · 1 filing · 8 docs
Sub-BasementAntenna site decom and removal1 filing · 8 docs
Site & exteriorSidewalk shedUnder Construction5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jamestown 450 West 15th Street17407/08/2026
15th Street Mini Storage3203/21/2026
Google2407/08/2026
Agb 15th Street2403/21/2026
Black Lark Enterprises603/22/2026
Nemark and Company603/21/2026
Icon Maintenance Development503/21/2026
450 West 15th Street Mini Stor503/21/2026
10th Avenue Car Wash203/21/2026
Saks103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen1903/21/2026
Municipal Building Consultants803/21/2026
Hierarch-E603/21/2026
A K Expediting203/21/2026
Biltmore Group403/21/2026
CCM Services Group203/21/2026
AE Design Solution203/21/2026
EA Design Group203/21/2026
Construction Permit Services303/21/2026
GC1 Expediting203/21/2026
Patuxent Engineering203/21/2026
Synergy Building Consultants103/21/2026
Milrose Consultants803/21/2026
Rigid Structural Design203/21/2026
YBL NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri Borough ScaffoldingScaffold1007/08/2026
SHR GroupGeneral Contractor603/21/2026
Sac WirelessGeneral Contractor603/21/2026
Lawrence J. LevineFire Protection503/21/2026
Eastern AllianceGeneral Contractor403/21/2026
Andamio ScaffoldingScaffold407/08/2026
L&K PartnersGeneral Contractor407/08/2026
Benchmark BuildersGeneral Contractor307/08/2026
Par Fire ProtectionPlumbing303/22/2026
Stonehenge Building ServiceScaffold309/10/2026
Overland ContractingGeneral Contractor303/21/2026
KC ExpeditingScaffold206/28/2026
Big Shot ElectricElectrical203/21/2026
Sciame ConstructionGeneral Contractor203/21/2026
SHR GroupScaffold207/08/2026
Tristate Plumbing ServicesFire Protection107/08/2026
Allstate Electrical ContElectrical103/21/2026
Tritech Electrical & DataElectrical103/21/2026
M.C. Electrical NYElectrical103/21/2026
Patriot ElectricElectrical103/22/2026
Gotham CommunicationsGeneral Contractor107/08/2026
KMM TelecommunicationsGeneral Contractor107/08/2026
Rally Restorationspecialty_contractor107/08/2026
Stonehenge Building ServiceGeneral Contractor107/08/2026
Eagle Scaffolding ServicesScaffold107/08/2026
Everest ScaffoldingScaffold107/08/2026
Par Fire ProtectionFire Protection107/08/2026
Tristate Plumbing ServicesPlumbing107/08/2026
Allcom ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rock Arch Engineering7831104/23/2025
Socotec Engineering4983409/18/2024
Sag Engineering & Consulting608103/15/2023
Delta Testing Labs6871104/26/2022
Codegreen510112/21/2020
DNA Controlled Inspection554303/23/2020
R Marsac Consulting329101/22/2019
Burtner Engineering Services5910201/14/2019
Building Lifecycle
All (282)Filed (51)Permit Issued (37)Signed Off (15)Facade (FISP) (9)Violation (60)Inspection (2)Objection (78)Special Inspection (30)
09/09/2026
Permit issued — Suspended Scaffold
M01167420-S1-SC
07/17/2026
Permit issued — Sidewalk Shed
M01299107-I1-SH
07/06/2026
Permit issued — Suspended Scaffold
M01167420-S1-SC
07/03/2026
Violation issued (ECB, closed)
Construction
05/18/2026
Permit issued — General Construction
M01201996-I1-GC
05/01/2026
Signed off — Alteration
Sidewalk shed installation as per plans filed herewith.
M01167420-I1
04/21/2026
Filed — Alteration
Sidewalk shed installation as per plans filed herewith.
M01389226-I1
04/21/2026
Permit issued — Sidewalk Shed
M01389226-I1-SH
04/07/2026
Permit issued — Sidewalk Shed
M01167420-I1-SH
03/20/2026
Signed off — Alteration
M01080958-I1
03/20/2026
Signed off — Alteration
Mechanical modifications taking place in the cellar & 1st fl as per plans filed herewith. No change in use, egress or occupancy
M01080858-I1
03/20/2026
Signed off — Alteration
Sprinkler modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy
M01080949-I1
11/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/24/2025
Permit issued — Sidewalk Shed
M01299107-I1-SH
10/23/2025
Filed — Alteration
M01299107-I1
08/28/2025
Signed off — Alteration
M01080848-I1
07/03/2025
Permit issued — Suspended Scaffold
M01167420-S1-SC
05/14/2025
Permit issued — General Construction
M01201996-I1-GC
05/01/2025
Permit issued — General Construction
M01201996-I1-GC
04/24/2025
Violation issued (ECB, open)
Local Law
04/23/2025
Filed — Alteration
Facade repairs, no change in use egress or occupancy
M01201996-I1
04/22/2025
Permit issued — General Construction
M01080848-I1-GC
04/16/2025
Permit issued — Structural
M01080958-I1-ST
04/16/2025
Permit issued — Mechanical Systems
M01080858-I1-MS
03/18/2025
Permit issued — Sprinklers
M01080949-I1-EW-SP
03/14/2025
Filed — Alteration
Sidewalk shed installation as per plans filed herewith.
M01167420-P1
02/11/2025
Permit issued — Suspended Scaffold
M01167420-S1-SC
02/05/2025
Objection raised — Admin
02/05/2025
Objection resolved — Addressed
02/05/2025
Objection raised — Admin
02/05/2025
Objection resolved — Addressed
01/29/2025
Filed — Alteration
Sidewalk shed installation as per plans filed herewith.
M01167420-S1
01/21/2025
Filed — Alteration
Sidewalk shed installation as per plans filed herewith.
M01167420-I1
01/21/2025
Permit issued — Sidewalk Shed
M01167420-I1-SH
09/18/2024
Filed — Alteration
M01080958-I1
09/05/2024
Filed — Alteration
Sprinkler modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy
M01080949-I1
09/05/2024
Filed — Alteration
M01080848-I1
09/04/2024
Filed — Alteration
Mechanical modifications taking place in the cellar & 1st fl as per plans filed herewith. No change in use, egress or occupancy
M01080858-I1
08/01/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
08/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — Duct leakage testing, insulation and design
ALEXIS SCHLESSINGERMAN
07/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
07/15/2024
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
07/15/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
07/15/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
07/15/2024
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/06/2023
Signed off — Alteration
Filing to decom existing antenna site. Removal of 17 antennas, 9 RRU's, 1 GPS ant on roof and equipment in room in penthouse. Initial installation approved under app #121835032 & 110061637 . No change in use, egress, or occupancy. Carrier SPRINT.
M00894632-I1
11/27/2023
Filed — Alteration
Filing to decom existing antenna site. Removal of 17 antennas, 9 RRU's, 1 GPS ant on roof and equipment in room in penthouse. Initial installation approved under app #121835032 & 110061637 . No change in use, egress, or occupancy. Carrier SPRINT.
M00894632-P1
09/21/2023
Permit issued — Antenna
M00894632-I1-AN
Latest 60 of 282 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStonehenge Building Service09/09/2026
DOB NOWSidewalk ShedPermit IssuedStonehenge Building Service07/17/2026
DOB NOWSuspended ScaffoldPermit IssuedStonehenge Building Service07/06/2026
DOB NOWGeneral ConstructionPermit IssuedStonehenge Building Service05/18/2026
DOB NOWSidewalk ShedPermit IssuedKC Expediting04/21/2026
DOB NOWSidewalk ShedSigned-offKC Expediting04/07/2026
DOB NOWSidewalk ShedPermit IssuedSHR Group10/24/2025
DOB NOWSuspended ScaffoldPermit IssuedPedrol Contracting07/03/2025
DOB NOWGeneral ConstructionPermit IssuedSHR Group05/14/2025
DOB NOWGeneral ConstructionPermit IssuedSHR Group05/01/2025
DOB NOWGeneral ConstructionSigned-offL&K Partners04/22/2025
DOB NOWStructuralSigned-offL&K Partners04/16/2025
DOB NOWMechanical SystemsSigned-offL&K Partners04/16/2025
DOB NOWSprinklersSigned-offLawrence J. Levine03/18/2025
DOB NOWSuspended ScaffoldPermit IssuedPedrol Contracting02/11/2025
DOB NOWSidewalk ShedSigned-offSHR Group01/21/2025
DOB NOWAntennaSigned-offGotham Communications09/21/2023
DOB NOWSidewalk ShedPermit IssuedTri Borough Scaffolding05/15/2023
DOB NOWStructuralSigned-offRally Restoration05/10/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/23/2022
DOB NOWSidewalk ShedPermit IssuedTri Borough Scaffolding04/19/2022
DOB NOWGeneral ConstructionSigned-offSciame Construction09/15/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/14/2021
DOB NOWSidewalk ShedPermit IssuedTri Borough Scaffolding03/31/2021
DOB NOWSidewalk ShedSigned-offEverest Scaffolding11/25/2020
DOB NOWAntennaPermit IssuedKMM Telecommunications09/28/2020
DOB NOWSidewalk ShedPermit IssuedTri Borough Scaffolding08/21/2020
DOB NOWMechanical SystemsSigned-offBenchmark Builders08/06/2020
DOB NOWConstruction FenceSigned-offEagle Scaffolding Services07/14/2020
DOB NOWMechanical SystemsSigned-offBenchmark Builders06/18/2020
DOB NOWSprinklersSigned-offTristate Plumbing Services03/25/2020
DOB NOWPlumbingSigned-offTristate Plumbing Services03/25/2020
DOB NOWAntennaPermit IssuedSac Wireless05/30/2019
DOB NOWAntennaPermit IssuedOverland Contracting02/13/2019
DOB NOWAntennaPermit IssuedSac Wireless02/08/2019
DOB NOWAntennaSigned-offEastern Alliance04/10/2018
DOB NOWAntennaSigned-offEastern Alliance02/08/2018
BISOTISSUEDRally Restoration03/16/2022
BISOTISSUEDRally Restoration11/05/2021
BISOTISSUEDRally Restoration02/26/2021
+ 47 more permits on file
3 projects · most recent 04/11/2022
FiledStatusContractorScope
04/11/2022——1,076 heads, 37 outlets
12/21/2021——10 outlets
12/21/2020———
1 project · most recent 04/26/2022
Storm Water/Sanitary
FiledStatusContractorScope
04/26/2022——Storm, Water/Sanitary
13 projects · most recent 05/18/2026
General Wiring Lighting
FiledStatusContractorScope
05/18/2026Permit IssuedTritech Electrical & DataGeneral Wiring
02/01/2025Permit IssuedV Electric NY—
01/19/2021CompleteE-J Electric Installation CoGeneral Wiring
01/15/2021CompleteE-J Electric Installation CoGeneral Wiring
12/11/2020CompletePatriot ElectricGeneral Wiring
11/24/2020CompleteBorowide Elect'l Contractors—
08/25/2020CompleteV. Vass Electric—
02/14/2020CompleteNead Electric—
09/30/2019CompletePatriot ElectricGeneral Wiring
01/25/2019CompletePatriot ElectricGeneral Wiring
01/17/2019CompletePatriot Electric—
10/03/2018CompleteBig Shot ElectricGeneral Wiring
01/11/2018CompleteAsk Electl ContrtngGeneral Wiring, Lighting
2 projects · most recent 04/04/2022
Steel Concrete
FiledStatusContractorScope
04/04/2022——Steel, Concrete
12/22/2021——Steel
3 projects · most recent 04/21/2026
Sidewalk Shed
FiledStatusContractorScope
04/21/2026Permit IssuedKC ExpeditingSidewalk Shed
03/14/2025Permit IssuedStonehenge Building ServiceSidewalk Shed
08/20/2020Permit IssuedTri Borough ScaffoldingSidewalk Shed
1 project · most recent 03/14/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/14/2025Permit IssuedStonehenge Building ServiceSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
08/01/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
08/01/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
07/22/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
07/22/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
07/22/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
07/22/2024Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
07/22/2024Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
07/22/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
07/22/2024Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
07/22/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
07/22/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
07/22/2024Duct leakage testing, insulation and designALEXIS SCHLESSINGERMANenergy_progress
07/15/2024FinalALEXIS SCHLESSINGERMANprogress
07/15/2024Sprinkler SystemsALEXIS SCHLESSINGERMANspecial
07/15/2024FinalALEXIS SCHLESSINGERMANprogress
07/15/2024Mechanical SystemsALEXIS SCHLESSINGERMANspecial
02/22/2023Structural Steel - DetailsChester Kowalskispecial
02/22/2023Concrete - Cast-In-PlaceChester Kowalskispecial
01/09/2023FinalChester Kowalskiprogress
04/04/2022Exterior lighting powerRICHARD GREENWALDenergy_progress
04/04/2022Electrical motors and elevatorsRICHARD GREENWALDenergy_progress
04/04/2022MeteringRICHARD GREENWALDenergy_progress
03/28/2022Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
03/28/2022Concrete - Cast-In-PlaceRICHARD GREENWALDspecial
01/21/2022Sprayed fire-resistant materialsRICHARD GREENWALDspecial
Latest 25 of 63.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
GoogleOfficeEntire building
Project M01080958 Alteration · LOC Issued · 09/18/2024
Project M01080848 Alteration · LOC Issued · 09/05/2024
Project M01080949 Alteration · LOC Issued · 09/05/2024
Project M01080858 Alteration · LOC Issued · 09/04/2024
Project M00645061 Alteration · Objections · 04/26/2022
Project M00645076 Alteration · Approved · 04/11/2022
Project M00645081 Alteration · Approved · 04/08/2022
Project M00645051 Alteration · Approved · 04/05/2022
Project M00645034 Alteration · Approved · 04/04/2022
Project M00666096 Alteration · Approved · 04/04/2022
Project M00639366 Alteration · Approved · 12/23/2021
Project M00639452 Alteration · Approved · 12/23/2021
Giorgio Armani CorporateOfficeFloors 3, 4
Project M00562506 Alteration · LOC Issued · 09/07/2021
T-MobileTelecom siteRoof
Project M00120900 Alteration · Objections · 04/11/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,365 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch28
09/06/2026M00004839-I1Request digital key ↗
09/03/2026M00562506-I1Request digital key ↗
09/03/2026M00639433-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly11
09/05/2026M00113773-I1Request digital key ↗
09/05/2026M00122238-I1Request digital key ↗
09/05/2026M00159431-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Antenna3
09/05/2026M00111310-I1Request digital key ↗
09/05/2026M00120900-I1Request digital key ↗
09/05/2026M00307448-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00386126-I1Request digital key ↗
09/04/2026M00433142-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00297534-I1Request digital key ↗
09/05/2026M00320792-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00297722-I1Request digital key ↗
09/04/2026M00438650-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00297710-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00369389-I1Request digital key ↗
▸Applications & Permits440
▸BISPLAN / WORK APPROVAL APPLICATION274
06/09/2023140939313Open ↗
05/05/2023140939313Open ↗
06/16/2022141008610Open ↗
Showing 3 of 274 on file for this type
▸BISWORK PERMIT APPLICATION163
02/26/2021140939313Open ↗
01/22/2021140991577Open ↗
08/20/2020123703448Open ↗
Showing 3 of 163 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZRD1-Zoning Resolution Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFlood Zone Compliance2
08/15/2026M00082048-I1Open ↗
08/13/2026M00111310-I1Open ↗
▸DOB NOWFlood Zone Design Certification2
08/15/2026M00082048-I1Open ↗
08/13/2026M00111310-I1Open ↗
▸Seals & Professional Certifications575
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION311
08/17/2020123703448Open ↗
08/17/2020123703448Open ↗
08/17/2020123703448Open ↗
Showing 3 of 311 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST65
01/31/2020123703448Open ↗
12/03/2019123793234Open ↗
Showing 2 of 65 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT51
01/15/2021140991577Open ↗
01/31/2020123703448Open ↗
12/03/2019123793234Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature51
09/06/2026M00004839-I1Open ↗
09/05/2026M00082048-I1Open ↗
09/05/2026M00122238-I1Open ↗
Showing 3 of 51 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026M00639433-I1Open ↗
09/01/2026M00810003-I1Open ↗
08/28/2026M00645024-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/23/2026M00645061-I1Open ↗
09/23/2026M00645061-I1Open ↗
09/02/2026M01080949-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
06/16/2022141008610Open ↗
01/15/2021140991577Open ↗
Showing 2 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
01/15/2021140991577Open ↗
Showing 1 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/16/2022141008610Open ↗
09/23/2020140939313Open ↗
▸Trade Schedules & Equipment175
▸BISSELF-CERT PLUMBING NOTICE50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISSCHEDULE B - PLUMBING38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE35
09/12/2019123766068Open ↗
09/06/2019123766068Open ↗
Showing 2 of 35 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA17
01/07/2021123589946Open ↗
07/11/2019123402433Open ↗
Showing 2 of 17 on file for this type
▸BISEQUIPMENT USE PERMITS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFDNY: Letter of No Objection2
08/15/2026M00645076-I1Open ↗
08/13/2026M00639452-I1Open ↗
▸Safety & Tenant Protection16
▸DOB NOWHPD-1: Anti-Harassment Area Checklist13
09/03/2026M00562506-I1Open ↗
09/03/2026M00639433-I1Open ↗
08/15/2026M00645061-I1Open ↗
Showing 3 of 13 on file for this type
▸BISSTREET TREE CHECKLIST2
06/16/2022141008610Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCertificate of No Harassment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos170
▸BISASBESTOS: CERTIFICATION (DEP ACP5)59
01/15/2021140991577Open ↗
12/01/2020140939313Open ↗
09/23/2020140939313Open ↗
Showing 3 of 59 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸DOB NOWOER: Notice to Proceed21
09/05/2026M00120900-I1Open ↗
09/04/2026M00433142-I1Open ↗
09/03/2026M00562506-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/06/2026M00004839-I1Open ↗
09/05/2026M00120900-I1Open ↗
09/05/2026M00320792-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWOER: Notice of Satisfaction14
09/05/2026M00120900-I1Open ↗
09/04/2026M00433142-I1Open ↗
09/03/2026M00562506-I1Open ↗
Showing 3 of 14 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED13
06/16/2022141008610Open ↗
01/15/2021140991577Open ↗
09/23/2020140939313Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
07/11/2023140939313Open ↗
11/30/2021123732274Open ↗
▸Energy Compliance129
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS69
08/17/2020123703448Open ↗
01/31/2020123703448Open ↗
12/04/2019123793234Open ↗
Showing 3 of 69 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS29
11/30/2021123732274Open ↗
01/28/2021123793234Open ↗
10/05/2020123703448Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: ENERGY12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/28/2021123793234Open ↗
09/25/2020123897701Open ↗
09/23/2020140939313Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/15/2021140991577Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/25/2023140939313Open ↗
▸Inspections & Test Reports35
▸BISTECHNICAL REPORT: RESPONSIBILITY24
05/09/2023140939313Open ↗
11/30/2021123732274Open ↗
06/21/2021123897701Open ↗
Showing 3 of 24 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
07/19/2023140939313Open ↗
07/19/2023140939313Open ↗
▸Approvals, Objections & Sign-offs209
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST125
07/28/2023140939313Open ↗
11/30/2021123732274Open ↗
10/21/2021110342549Open ↗
Showing 3 of 125 on file for this type
▸BISADMINISTRATIVE OBJECTIONS44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
06/04/2020120939093Open ↗
05/18/2020120939093Open ↗
03/24/2020120939093Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWHigh Line Parks Approval10
08/13/2026M01299107-I1Open ↗
08/13/2026M00438650-I1Open ↗
08/13/2026M00369389-I1Open ↗
Showing 3 of 10 on file for this type
▸BISHIGH LINE - PARKS APPROVAL REQUIRED5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership199
▸BISCOST AFFIDAVIT199
05/09/2023140939313Open ↗
11/30/2021123732274Open ↗
01/28/2021123793234Open ↗
Showing 3 of 199 on file for this type
▸Filing & Intake Forms302
▸BISEFILING COVER SHEET127
09/28/2020123703448Open ↗
01/31/2020123703448Open ↗
12/03/2019123793234Open ↗
Showing 3 of 127 on file for this type
▸BISBOROUGH INTAKE FORM95
10/21/2021110342549Open ↗
03/24/2020120939093Open ↗
03/20/2020123512724Open ↗
Showing 3 of 95 on file for this type
▸BISADDITIONAL INFORMATION69
06/16/2023140939313Open ↗
11/15/2022141008610Open ↗
12/01/2020140939313Open ↗
Showing 3 of 69 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
06/16/2022141008610Open ↗
01/15/2021140991577Open ↗
09/23/2020140939313Open ↗
Showing 3 of 11 on file for this type
▸Other Documents32
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION17
06/26/2019123897701Open ↗
Showing 1 of 17 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION5
11/15/2022141008610Open ↗
11/15/2022141008610Open ↗
11/15/2022141008610Open ↗
Showing 3 of 5 on file for this type
▸BISPlot Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation2
08/15/2026M00082048-I1Open ↗
08/13/2026M00111310-I1Open ↗
▸DOB NOWCalculations2
08/25/2026M01167420-S1Open ↗
08/13/2026M01167420-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/25/2026M01167420-S1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/15/2026M00082048-I1Open ↗