Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsCornerstone Management Systems1 filing
Filing for the installation of new gas piping riser and distribution with single utility gas meter at cellar. This application is also in conjunction with LAA application no. m00796871. no change to use, egress or occupancy.
On file for this project
22 documents
RoofVenmel LLCUnder Construction1p · 4 filings · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural · Supported Scaffold
RENOVATION PARTIAL BUILDING OF EXISTING COMMERCIAL BUILDING. PROJECT PROPOSES TO DEMO THE EXISTING 1660 ZFA PENTHOUSE & BUILD A NEW 1660 ZFA PENTHOUSE. NO CHANGE IN BULK. ASBESTOS ROOFING MEMBRANE REMOVAL 7,474 SQ FT. TEMP & INSTALL ROOFING &WATERPROOFING
On file for this project
10 documents · 1 drawing sheet
MODIFICATION TO PLUMBING AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
4 documents
ROOF STRUCTURE WILL CONSIST OF ST BEAMS MOMENT CONNECTED W/ TAPEREDCANTILEVERED ST SECTIONS ALONGSIDE HSSTUBES & THERMAL BREAK AS NOSINGBUILD-UP. CONCR SLAB ON METAL DECKWILL SUPPORT THE NEW RF. ELEVATED SLABON METAL DECK WILL ACT AS NEW BASE OF RF STRUCT
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
PenthouseVenmel LLCUnder Construction12p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
RENOVATION PARTIAL BUILDING OF EXISTING COMMERCIAL BUILDING. PROJECT PROPOSES TO DEMO THE EXISTING 1660 ZFA PENTHOUSE & BUILD A NEW 1660 ZFA PENTHOUSE. NO CHANGE IN BULK. ASBESTOS ROOFING MEMBRANE REMOVAL 7,474 SQ FT. TEMP & INSTALL ROOFING &WATERPROOFING
On file for this project
10 documents · 6 drawing sheets
MODIFICATION TO PLUMBING AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
4 documents · 2 drawing sheets
ROOF STRUCTURE WILL CONSIST OF ST BEAMS MOMENT CONNECTED W/ TAPEREDCANTILEVERED ST SECTIONS ALONGSIDE HSSTUBES & THERMAL BREAK AS NOSINGBUILD-UP. CONCR SLAB ON METAL DECKWILL SUPPORT THE NEW RF. ELEVATED SLABON METAL DECK WILL ACT AS NEW BASE OF RF STRUCT
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 13Melkonian Penthouse Renovation and New BuildUnder Construction1 filing · 10 docs
Architecture
Issued Permit Scope
General Construction
RENOVATION PARTIAL BUILDING OF EXISTING COMMERCIAL BUILDING. PROJECT PROPOSES TO DEMO THE EXISTING 1660 ZFA PENTHOUSE & BUILD A NEW 1660 ZFA PENTHOUSE. NO CHANGE IN BULK. ASBESTOS ROOFING MEMBRANE REMOVAL 7,474 SQ FT. TEMP & INSTALL ROOFING &WATERPROOFING
On file for this project
10 documents
Floor 12Venmel LLCUnder Construction13p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
RENOVATION PARTIAL BUILDING OF EXISTING COMMERCIAL BUILDING. PROJECT PROPOSES TO DEMO THE EXISTING 1660 ZFA PENTHOUSE & BUILD A NEW 1660 ZFA PENTHOUSE. NO CHANGE IN BULK. ASBESTOS ROOFING MEMBRANE REMOVAL 7,474 SQ FT. TEMP & INSTALL ROOFING &WATERPROOFING
On file for this project
10 documents · 8 drawing sheets
MODIFICATION TO PLUMBING AND SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
4 documents · 2 drawing sheets
Modifications to HVAC system as per plans filed herewith. No change in use, egress or occupancy
On file for this project
6 documents · 3 drawing sheets
Floor 11
Floor 10
Floor 9
Floor 8Venmel LLCUnder Construction10p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
RENOVATION PARTIAL BUILDING OF EXISTING COMMERCIAL BUILDING. PROJECT PROPOSES TO DEMO THE EXISTING 1660 ZFA PENTHOUSE & BUILD A NEW 1660 ZFA PENTHOUSE. NO CHANGE IN BULK. ASBESTOS ROOFING MEMBRANE REMOVAL 7,474 SQ FT. TEMP & INSTALL ROOFING &WATERPROOFING
On file for this project
10 documents
Filing for Mechanical modifications to the 8th floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
14 documents · 4 drawing sheets
Filing for sprinkler modifications to the 8th floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 7
Floor 6
Floor 5Install new split AC systems on 5th floor2p · 1 filing · 7 docs
GeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
INSTALL ONE (1) NEW SPLIT AC SYSTEMS TO SERVE 5TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
Floor 4
Floor 3Venmel LLC4p · 2 filings · 10 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
Filing for General Construction modifications to include replacement of windows to the 3rd floor as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
10 documents · 2 drawing sheets
RENOVATION BATHROOM OF EXISTING COMMERCIAL BUILDING 3RD FLOOR
On file for this project
10 documents · 11 drawing sheets
Floor 21p · 1 filing
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Installation of new HVAC units for second floor.
On file for this project
3 documents · 1 drawing sheet
Floor 1Lobby alteration and partition work1p · 4 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sidewalk Shed
INTERIOR RENOVATION TO EXISTING BUILDING LOBBY REMOVE AND RECONSTRUCT PARTITION, ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
17 documents
INSTALL NEW SPLIT A/C UNIT IN THE LOBBY AREA AND RELATED DUCT WORK , IN CONJUNCTION WITH THE INTERIOR RENOVATION OF THE LOBBY AT FIRST FLOOR FILED UNDER APPLICATION #M00768038. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
4 documents
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
CellarLobby interior renovation and A/C unit installation2p · 1 filing · 4 docs
MechanicalPlumbing
Issued Permit Scope
Plumbing
INSTALL NEW SPLIT A/C UNIT IN THE LOBBY AREA AND RELATED DUCT WORK , IN CONJUNCTION WITH THE INTERIOR RENOVATION OF THE LOBBY AT FIRST FLOOR FILED UNDER APPLICATION #M00768038. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Site & exteriorHousing Preservation & DevelopmentUnder Construction8 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentGeneralMechanicalStructuralZ
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
RENOVATION PARTIAL BUILDING OF EXISTING COMMERCIAL BUILDING. PROJECT PROPOSES TO DEMO THE EXISTING 1660 ZFA PENTHOUSE & BUILD A NEW 1660 ZFA PENTHOUSE. NO CHANGE IN BULK. ASBESTOS ROOFING MEMBRANE REMOVAL 7,474 SQ FT. TEMP & INSTALL ROOFING &WATERPROOFING
On file for this project
10 documents · 12 drawing sheets
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
On file for this project
3 documents · 3 drawing sheets
Installation of a temporary heavy-duty sidewalk per the plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents · 8 drawing sheets
Latest 3 of 8 filings on this floor.