← Back
Office only, 7-19 stories
451-453 Park Ave South
451 PARK AVENUE SOUTH · Murray Hill-Kips Bay · BIN 1018297
💬 Discuss this project
1915Year Built
10Stories
O3Building Class
C6-4AZoning
48,095 sfGross Floor Area
14Units
LL97 Covered5 Open Violations ▸FISP: SWARMP
Office only, 7-19 stories · Owner of record: 451-453 PARK AVE SOUTH · 4,938 sf lot · 9.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof45p · 5 filings · 20 docs
Floor 1053p · 6 filings · 20 docs
Floor 947p · 4 filings · 20 docs
Floor 845p · 4 filings · 20 docs
Floor 747p · 4 filings · 20 docs
Floor 644p · 4 filings · 20 docs
Floor 545p · 4 filings · 20 docs
Floor 446p · 4 filings · 20 docs
Floor 347p · 7 filings · 20 docs
Floor 247p · 6 filings · 20 docs
Floor 147p · 5 filings · 20 docs
Mezzanine1p · 1 filing · 20 docs
Cellar48p · 4 filings · 20 docs
Basement1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
451-453 PARK AVE SOUTH10907/08/2026
M.W.C. MANAGEMENT CORP.203/22/2026
FREN WORKERS LOCAL 40203/22/2026
HOWELL CONSTRUCTION103/22/2026
451 PARK AVE SOUTH1103/21/2026
451 PARK A503/21/2026
451-453 PARK AVE SO503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES G. MICHEL ENGINEERING, PC.1408/10/2023
CAMERON ENGINEERING410/27/2022
TOHFAZ UDDIN PE PC102/16/2022
GKV ARCHITECTS212/02/2021
JEFFREY BERMAN ARCHITECT107/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC4203/21/2026
EUROCELT EXPEDITING, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE SWEET CONSTRUCTION GRGeneral Contractor1507/08/2026
BLUEHILL CONST.INCGeneral Contractor607/08/2026
LAWRENCE J. LEVINEFire Protection303/21/2026
DONNELLY MECHANICAL CORPGeneral Contractor307/08/2026
MANENGEERING BUREAU INCFire Protection207/08/2026
PACE PLUMBING CORPPlumbing207/08/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
PAR FIRE PROTECTION LLCFire Protection107/08/2026
STARR INDUSTRIES LLCGeneral Contractor107/08/2026
COMMERCIAL ELECT CONT INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.2541108/10/2023
SKYLINE ENGINEERING, PLLC267812/02/2021
CHARLES G MICHEL ENGINEER2871411/30/2021
Building Lifecycle
All (191)Filed (23)Permit Issued (23)Signed Off (6)Facade (FISP) (12)Violation (60)Inspection (13)Objection (24)Special Inspection (30)
04/23/2026
Signed off — Alteration
MATERIAL HOIST
M01341026-I1
01/21/2026
Permit issued — Suspended Scaffold
M01341026-I1-SC
01/19/2026
Filed — Alteration
MATERIAL HOIST
M01341026-I1
04/03/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/27/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/13/2023
Signed off — Alteration
New mechanical duct layout, new diffusers and units as per plans. No change to use, egress or occupancy.
M00476485-I1
11/09/2023
Signed off — Alteration
Installation of new plumbing fixtures and related piping as per plans. No change to use, egress or occupancy.
M00476500-I1
11/09/2023
Signed off — Alteration
Modification of existing sprinkler system as per plans. No change in use, egress or occupancy.
M00476504-I1
10/23/2023
Signed off — Alteration
Interior Renovation of commercial space, remove and install walls, floors, ceilings as per plans. No change to use, egress or occupancy.
M00476469-I1
09/23/2023
Violation issued (FDNY_NOV, closed)
09/23/2023
Violation issued (FDNY_NOV, closed)
08/16/2023
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
08/10/2023
Filed — Alteration
Installation of new plumbing fixtures and related piping as per plans. No change to use, egress or occupancy.
M00476500-P3
08/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
08/08/2023
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
05/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2023
Violation issued (ECB, closed)
Elevators
05/01/2023
Special inspection requirement — Shutoff dampers
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — Final
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — Duct leakage testing, insulation and design
MAURICIO ANDRADE
05/01/2023
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
04/28/2023
Permit issued — Plumbing
M00476500-I1-PL
04/27/2023
Filed — Alteration
New mechanical duct layout, new diffusers and units as per plans. No change to use, egress or occupancy.
M00476485-P2
04/26/2023
Special inspection requirement — Shutoff dampers
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — Duct leakage testing, insulation and design
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — Final
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
04/26/2023
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
03/01/2023
Permit issued — Mechanical Systems
M00472054-I1-MS
01/10/2023
Permit issued — General Construction
M00471958-I1-GC
01/10/2023
Permit issued — Structural
M00471983-I1-ST
01/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/16/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/01/2022
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00658745-I1
10/31/2022
Objection resolved — Addressed
10/30/2022
Objection raised — Scope
10/27/2022
Filed — Alteration
Modification of existing sprinkler system as per plans. No change in use, egress or occupancy.
M00476504-P1
10/27/2022
Filed — Alteration
New mechanical duct layout, new diffusers and units as per plans. No change to use, egress or occupancy.
M00476485-P1
10/27/2022
Filed — Alteration
Installation of new plumbing fixtures and related piping as per plans. No change to use, egress or occupancy.
M00476500-P1
10/27/2022
Filed — Alteration
Installation of new steel beam and roof dunnage for supporting MEP equipment. No change to use, egress or occupancy.
M00476474-P1
10/24/2022
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
10/24/2022
Special inspection requirement — Sprayed fire-resistant materials
MAURICIO ANDRADE
10/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC01/21/2026
DOB NOWPlumbingSigned-offPACE PLUMBING CORP04/28/2023
DOB NOWMechanical SystemsPermit IssuedDONNELLY MECHANICAL CORP03/01/2023
DOB NOWGeneral ConstructionPermit IssuedBLUEHILL CONST.INC01/10/2023
DOB NOWStructuralPermit IssuedBLUEHILL CONST.INC01/10/2023
DOB NOWStructuralSigned-offTHE SWEET CONSTRUCTION GR07/13/2022
DOB NOWMechanical SystemsSigned-offTHE SWEET CONSTRUCTION GR07/13/2022
DOB NOWGeneral ConstructionSigned-offTHE SWEET CONSTRUCTION GR07/13/2022
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC06/10/2022
DOB NOWMechanical SystemsSigned-offTHE SWEET CONSTRUCTION GR06/08/2022
DOB NOWGeneral ConstructionSigned-offTHE SWEET CONSTRUCTION GR06/08/2022
DOB NOWStructuralSigned-offTHE SWEET CONSTRUCTION GR06/08/2022
DOB NOWSprinklersPermit IssuedLAWRENCE J. LEVINE05/16/2022
DOB NOWSprinklersSigned-offMANENGEERING BUREAU INC05/12/2022
DOB NOWGeneral ConstructionPermit IssuedBLUEHILL CONST.INC04/13/2022
DOB NOWStructuralPermit IssuedBLUEHILL CONST.INC04/12/2022
DOB NOWMechanical SystemsPermit IssuedDONNELLY MECHANICAL CORP03/31/2022
DOB NOWSidewalk ShedSigned-offSTARR INDUSTRIES LLC02/16/2022
DOB NOWSprinklersSigned-offMANENGEERING BUREAU INC01/24/2022
DOB NOWPlumbingSigned-offPACE PLUMBING CORP01/14/2022
DOB NOWGeneral ConstructionSigned-offTHE SWEET CONSTRUCTION GR12/21/2021
DOB NOWMechanical SystemsSigned-offTHE SWEET CONSTRUCTION GR12/21/2021
DOB NOWStructuralSigned-offTHE SWEET CONSTRUCTION GR12/21/2021
BISMHISSUEDDONNELLY MECHANICAL CORP09/17/2018
BISOTISSUEDJERRICK ASSOCIATES INC11/16/2017
BISSPISSUEDVIP FIRE SPRINKLER INC02/18/2015
BISPLISSUEDMJM PLUMBING OF NY, INC01/08/2015
BISMHISSUEDATLAS CONSTRUCTION LLC12/31/2014
BISOTISSUEDATLAS CONSTRUCTION LLC12/31/2014
BISOTISSUEDFIVE STAR CARTING LLC03/19/2012
BISSPISSUEDCODE FIRE PROTECTION CORP.03/08/2005
BISOTISSUEDSWEET CONSTRUCTION01/26/2005
BISOTISSUEDMILCO GENERAL CONTRACTING02/15/2000
BISMHISSUEDMILCO GENERAL CONTRACTING02/15/2000
BISSPISSUEDASCO SPRINKLER CO.,INC04/05/1996
BISPLISSUEDMJM PLUMBING,INC.02/15/1996
BISOTISSUEDPEMCO ASSOCIATES01/22/1996
BISMHISSUEDPEMCO ASSOCIATES01/22/1996
BIS—ISSUEDBRATON ENG04/26/1995
BISMHISSUEDPEMCO INC10/07/1994
+ 10 more permits on file
1 project · most recent 11/30/2021
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/30/2021Permit IssuedDONNELLY MECHANICAL CORPAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PURY-HP144TSNU-A 144,000 BTU · Vrf Outdoor ×6
PUHY-HP120TNU-A 120,000 BTU · Vrf Outdoor ×2
PUHY-HP72TNU-A 72,000 BTU · Vrf Outdoor ×1
PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×1
PURY-HP192TSNU-A 192,000 BTU · Vrf Outdoor ×1
PURY-HP72TNU-A 72,000 BTU · Vrf Outdoor ×1
PUY-A36NKA7 36,000 BTU · Condensing Unit ×1
Heating
Mitsubishi Electric PURY-HP144TSNU-A 160,000 BTU · Vrf Outdoor ×5
PUHY-HP120TNU-A 135,000 BTU · Vrf Outdoor ×2
PUHY-HP72TNU-A 80,000 BTU · Vrf Outdoor ×1
PUMY-P60NKMU3 66,000 BTU · Vrf Outdoor ×1
PURY-HP192TSNU-A 215,000 BTU · Vrf Outdoor ×1
PURY-HP72TNU-A 80,000 BTU · Vrf Outdoor ×1
PURY-HPTSNU-A 160,000 BTU · Vrf Outdoor ×1
1 project · most recent 11/29/2021
FiledStatusContractorScope
11/29/2021Permit IssuedPAR FIRE PROTECTION LLC54 heads
1 project · most recent 11/29/2021
Water/Sanitary
FiledStatusContractorScope
11/29/2021Signed-offPAR PLUMBING CO., INCWater/Sanitary
4 projects · most recent 02/23/2022
General Wiring
FiledStatusContractorScope
02/23/2022Permit IssuedCOMMERCIAL ELECT CONT INCGeneral Wiring
02/18/2022CompleteJ.A. LEE ELEC SVCS LLC—
01/18/2022Permit IssuedSCHLESINGER ELECT'L CONTRGeneral Wiring
04/29/2021CompleteALLIANCE ELEVATOR COMPANY—
1 project · most recent 10/27/2022
Steel
FiledStatusContractorScope
10/27/2022Signed-offTHE SWEET CONSTRUCTION GRSteel
1 project · most recent 01/19/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/19/2026Signed-offROSENWACH TANK CO.,LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/03/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/16/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 105
DateRequirementInspectorRole
08/16/2023Post-installed AnchorsMAURICIO ANDRADEspecial
08/16/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
08/08/2023Post-installed AnchorsMAURICIO ANDRADEspecial
08/08/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/01/2023HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
05/01/2023HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
05/01/2023Maintenance informationMAURICIO ANDRADEenergy_progress
05/01/2023Shutoff dampersMAURICIO ANDRADEenergy_progress
05/01/2023Mechanical SystemsMAURICIO ANDRADEspecial
05/01/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/01/2023Post-installed AnchorsMAURICIO ANDRADEspecial
05/01/2023FinalMAURICIO ANDRADEprogress
05/01/2023Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
05/01/2023HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
05/01/2023Duct leakage testing, insulation and designMAURICIO ANDRADEenergy_progress
04/26/2023Shutoff dampersMAURICIO ANDRADEenergy_progress
04/26/2023Maintenance informationMAURICIO ANDRADEenergy_progress
04/26/2023HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
04/26/2023Duct leakage testing, insulation and designMAURICIO ANDRADEenergy_progress
04/26/2023HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
04/26/2023HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
04/26/2023FinalMAURICIO ANDRADEprogress
04/26/2023Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
04/26/2023Post-installed AnchorsMAURICIO ANDRADEspecial
04/26/2023Mechanical SystemsMAURICIO ANDRADEspecial
Latest 25 of 105.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Concorde/Northwell Health Cardiology SuiteMedical / HealthcareFloors 2, 3
Project M00476469 Alteration · LOC Issued · 07/12/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 243 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/03/2026M00472054-P1Request digital key ↗
09/01/2026M00476485-I1Request digital key ↗
09/01/2026M00476485-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/03/2026M00472521-I1Request digital key ↗
09/03/2026M00472521-P1Request digital key ↗
09/01/2026M00476500-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/03/2026M00476504-I1Request digital key ↗
09/03/2026M00472532-P1Request digital key ↗
08/15/2026M00476504-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/03/2026M00476474-I1Request digital key ↗
09/03/2026M00471983-I1Request digital key ↗
08/15/2026M00476474-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/03/2026M00471958-I1Request digital key ↗
09/03/2026M00471958-P1Request digital key ↗
08/15/2026M00476469-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/02/2026M00658745-I1Request digital key ↗
08/19/2026M01341026-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION9
09/17/2018123124742Open ↗
05/25/2017123000475Open ↗
05/07/2015122234812Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION7
09/17/2018123124742Open ↗
11/17/2017123000475Open ↗
02/20/2015122249165Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications114
▸DOB NOWSpecial Inspector Seal & Signature39
09/23/2026M00471983-P1Open ↗
09/23/2026M00471983-P1Open ↗
09/23/2026M00471983-P1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/23/2026M00471983-P1Open ↗
08/31/2026M00471958-I1Open ↗
08/31/2026M00471958-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/03/2026M00476504-P1Open ↗
09/03/2026M00476504-I1Open ↗
09/03/2026M00476469-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
01/07/2019123124742Open ↗
09/17/2018123124742Open ↗
02/09/2018123000475Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/17/2018123124742Open ↗
05/07/2015122234812Open ↗
05/04/2015122234812Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/09/2015122234812Open ↗
01/09/2015122234812Open ↗
01/08/2015122249165Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/17/2018123124742Open ↗
▸Trade Schedules & Equipment13
▸BISSELF-CERT PLUMBING NOTICE4
05/06/2015122249165Open ↗
03/31/2015122249165Open ↗
03/10/2015122234812Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/07/2019123124742Open ↗
06/01/2015122234812Open ↗
▸BISEQUIPMENT USE PERMITS2
01/07/2019123124742Open ↗
05/18/2015122234812Open ↗
▸BISSCHEDULE B - PLUMBING2
01/08/2015122249165Open ↗
12/13/2011120919854Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
03/31/2015122249165Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/15/2017122249156Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/09/2015122234812Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/25/2017123000475Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report21
09/03/2026M00476504-P1Open ↗
09/03/2026M00476504-I1Open ↗
09/03/2026M00472521-I1Open ↗
Showing 3 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/17/2018123124742Open ↗
05/25/2017123000475Open ↗
01/09/2015122234812Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/13/2011120919854Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
01/07/2019123124742Open ↗
09/17/2018123124742Open ↗
02/09/2018123000475Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/07/2019123124742Open ↗
02/09/2018123000475Open ↗
06/01/2015122234812Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026M00476469-I1Open ↗
08/13/2026M00476485-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/13/2011120919854Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/07/2019123124742Open ↗
02/09/2018123000475Open ↗
11/15/2017122249156Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/07/2019123124742Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/13/2011120919854Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
01/07/2019123124742Open ↗
09/17/2018123124742Open ↗
02/09/2018123000475Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET7
09/17/2018123124742Open ↗
05/25/2017123000475Open ↗
01/09/2015122234812Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
01/07/2019123124742Open ↗
02/09/2018123000475Open ↗
11/15/2017122249156Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00476504-P1Open ↗
08/16/2026M00476485-P1Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01341026-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01341026-I1Open ↗