← Back
BuildNYC
Office, 20+ stories, with or without commercial
HSBC Tower
452 5TH AVENUE · Name © OpenStreetMap contributors · BIN 1016047
💬 Discuss this project
1902Year Built
29Stories
O4Building Class
C5-3Zoning
616,352 sfGross Floor Area
17Units
LL97 Covered4 Active Violations 2 unresolved · 2 paperwork only ▸FISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: 452 Fifth Owners · 32,834 sf lot · 18.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsStructural steel framing for stair openingsUnder Construction3 filings
RoofExit signs NYC code compliant2p · 2 filings · 13 docs
Floor 27Temporary work platform installation1 filing · 2 docs
Floor 26
Floor 25Landlord Demo 25th Floor1p · 2 filings · 11 docs
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Amazon, HSBC Bank15p · 10 filings · 20 docs
Floor 10Amazon27p · 8 filings · 20 docs
Floor 9Amazon, HSBC Bank18p · 9 filings · 20 docs
Floor 8Amazon, HSBC Bank13p · 7 filings · 20 docs
Floor 7Seneca Group20p · 5 filings · 20 docs
Floor 6HSBC Bank18p · 5 filings · 20 docs
Floor 5HSBC Bank32p · 8 filings · 20 docs
Floor 4Amazon18p · 5 filings · 20 docs
Floor 3Amazon, HSBC Bank19p · 7 filings · 20 docs
Floor 2Life TimeUnder Construction15p · 16 filings · 20 docs
Floor 1Life Time, HSBC BankUnder Construction23p · 18 filings · 20 docs
MezzanineSprinkler system installation for cellar and 1st floorUnder Construction1p · 1 filing · 4 docs
CellarLife Time, HSBC BankUnder Construction23p · 18 filings · 20 docs
Sub-CellarLife TimeUnder Construction6p · 8 filings · 20 docs
Site & exteriorInstallation of enclosure systemUnder Construction7 filings · 20 docs
Filed — no permit issuedEnclosure system installation2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HSBC Bank USA20603/21/2026
HSBC USA13003/21/2026
Seneca Group4509/13/2026
HSBC4203/21/2026
452 5th Owners3703/21/2026
Republic National Bank3503/21/2026
NYC Department of Housing Preservation and Development303/21/2026
10 Bryant Park103/22/2026
452 5th Avenue103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants9903/21/2026
Desarno Associates803/21/2026
Green Studio603/21/2026
Metropolis Group1003/21/2026
Eurocelt Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&K PartnersGeneral Contractor2507/10/2026
Clune Construction CoGeneral Contractor2107/08/2026
Raptor MechanicalPlumbing707/08/2026
Tri-Star ConstructionGeneral Contractor610/16/2026
Full Capacity FireFire Protection607/08/2026
Standard Fire ProtectionFire Protection407/10/2026
Rock Group NYScaffold407/08/2026
Andamio ScaffoldingScaffold303/21/2026
Accurate MechanicalFire Protection307/08/2026
Aggressive Fire ProtectionFire Protection307/08/2026
Platform SolutionsScaffold303/21/2026
Urban IntelligenceScaffold303/21/2026
Jordan Daniels Electrical ConElectrical303/21/2026
PSI PartnersFire Protection206/28/2026
Advanced Scaffold ServiceScaffold204/09/2026
Platinum Services NYScaffold207/08/2026
A&A PlumbingPlumbing207/10/2026
JT Magen & CompanyGeneral Contractor203/21/2026
Exterior Wall & BuildingScaffold204/11/2026
Mac FelderPlumbing207/08/2026
Vanguard Construction andGeneral Contractor203/21/2026
Par Fire ProtectionFire Protection107/08/2026
Lab Plumbing & Heating CoPlumbing107/08/2026
Crosswire ElectricalElectrical103/22/2026
Difazio Electric NYElectrical103/22/2026
Ecny Electrical ContractorsElectrical103/22/2026
Allran Electric of NYElectrical103/21/2026
Ennell Group ElectricElectrical103/22/2026
Five Borough ElectricElectrical103/22/2026
Foley JohnElectrical103/21/2026
Forest ElectricElectrical103/21/2026
Kleinknecht Electric CoElectrical103/22/2026
Mann, Jr., J. RobertElectrical103/21/2026
Metropolis ElectricElectrical103/22/2026
Dobs Elevator CompanyElectrical103/21/2026
Adco ElectricalElectrical103/21/2026
Uni-Lite ElectricElectrical103/22/2026
Henegan Construction CoGeneral Contractor107/08/2026
Viking Restoration Svcespecialty_contractor103/21/2026
Advanced Scaffold ServicesScaffold107/08/2026
Abco-Peerless SprinklerFire Protection107/08/2026
City/Suburban PlumbingPlumbing106/28/2026
Control Electrical Cont'gElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eti Consultants76942409/18/2026
Crosscheck Inspection Services5443207/31/2026
New Age Engineering7746103/02/2026
Skyline Engineering267312/08/2025
Alan Margolin & Associates4231507/06/2023
Milrose Consultants2003203/16/2023
Winton Group Architecture4343105/16/2022
Building Lifecycle
All (300)Filed (80)Permit Issued (69)Signed Off (25)Facade (FISP) (3)Violation (8)Inspection (38)Objection (47)Special Inspection (30)
10/20/2026
Objection resolved — Resolved
10/20/2026
Objection resolved — Resolved
10/16/2026
Objection raised — Other
10/16/2026
Objection raised — Cost
10/15/2026
Permit issued — General Construction
M01261817-I1-GC
10/15/2026
Objection resolved — Resolved
10/13/2026
Objection raised — Inspections
10/13/2026
Objection raised — Fire_Protection
10/13/2026
Objection raised — Inspections
09/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/28/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
M01288929-I1
09/28/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, etc.
M01289017-I1
09/18/2026
Filed — Alteration
Modifications to plumbing, sprinkler, and standpipe as per plans filed herewith. No change in use, egress, or occupancy.
M01320666-P2
09/17/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
M01289034-I1
09/17/2026
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
09/17/2026
Special inspection requirement — Standpipe Systems
ANTHONY MUSUMECI
09/16/2026
Objection resolved — Resolved
09/15/2026
Signed off — Alteration
Provide plumbing infrastructure for tenant terrace scope of work, including drains, hose bib services. . No change in use, egress, or occupancy.
M01273165-I1
09/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/15/2026
Objection resolved — Resolved
09/10/2026
Filed — Alteration
Connection to existing fuel oil supply and return. Relocated generator and associated fuel oil belly tank filed under DOBNOW M01273133-I1. Total filing fee captured and paid for under initial application.
M01273133-S3
09/09/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
09/04/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
M01288923-I1
09/04/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, etc.
M01283925-I1
09/04/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, etc.
M01289005-I1
09/04/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
M01283930-I1
09/03/2026
Objection raised — Other
09/02/2026
Special inspection requirement — Standpipe Systems
ANTHONY MUSUMECI
09/02/2026
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
08/26/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
M01283922-I1
08/25/2026
Signed off — Alteration CO
FILING HEREWITHIN ALT-CO TO CHANGE USE, OCCUPANCY, AND EGRESS FOR LEVELS 3 THROUGH 11. EGRESS CHANGES INCLUDE EXTENSION TO AN EXISTING EGRESS STAIR THAT CURRENTLY SERVCES FLOORS GROUND THROUGH 8 TO SERVE FLOORS GROUND THROUGH 11.
M01276361-S1
08/25/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
M01288945-I1
08/25/2026
Filed — Alteration
Modifications to plumbing, sprinkler, and standpipe as per plans filed herewith. No change in use, egress, or occupancy.
M01320666-P1
08/25/2026
Signed off — Alteration
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
M01288937-I1
08/25/2026
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MUSUMECI
08/21/2026
Filed — Alteration
Plumbing/Sprinkler demo and modifications on construction Floor 1, 2, and Cellar as per plans filed herewith. No change to use, egress, or occupancy.
M01303761-P1
08/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/21/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/18/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/18/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/18/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/18/2026
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
08/18/2026
Special inspection requirement — Standpipe Systems
ANTHONY MUSUMECI
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/13/2026
Objection resolved — Addressed
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MUSUMECI
08/12/2026
Special inspection requirement — Sprinkler Systems
ANTHONY MUSUMECI
08/07/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/06/2026
Filed — Alteration
INSTALLATION OF ENCLOSURE SYSTEM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01441900-I1
08/06/2026
Objection raised — Scope
08/05/2026
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
08/05/2026
Special inspection requirement — Standpipe Systems
EUGENE BIFULCO
08/04/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/03/2026
Objection raised — Scope
08/03/2026
Objection resolved — Resolved
08/03/2026
Objection raised — Scope
08/03/2026
Objection resolved — Resolved
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTri-Star Construction10/15/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing07/09/2026
DOB NOWMechanical SystemsPermit IssuedL&K Partners07/09/2026
DOB NOWStandpipePermit IssuedStandard Fire Protection07/09/2026
DOB NOWSprinklersPermit IssuedStandard Fire Protection07/09/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAdvanced Scaffold Services06/10/2026
DOB NOWStructuralPermit IssuedL&K Partners03/25/2026
DOB NOWStructuralPermit IssuedL&K Partners03/19/2026
DOB NOWGeneral ConstructionPermit IssuedL&K Partners03/09/2026
DOB NOWSprinklersPermit IssuedStandard Fire Supp03/03/2026
DOB NOWSprinklersPermit IssuedStandard Fire Supp03/02/2026
DOB NOWGeneral ConstructionPermit IssuedL&K Partners02/27/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing02/26/2026
DOB NOWSupported ScaffoldPermit IssuedAdvanced Scaffold Service01/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedAdvanced Scaffold Service01/27/2026
DOB NOWSprinklersSigned-offMora Fire Protection01/25/2026
DOB NOWStandpipeSigned-offMora Fire Protection01/16/2026
DOB NOWStructuralSigned-offL&K Partners01/09/2026
DOB NOWStandpipeSigned-offFull Capacity Fire01/08/2026
DOB NOWStandpipeSigned-offFull Capacity Fire01/08/2026
DOB NOWSprinklersSigned-offFull Capacity Fire12/08/2025
DOB NOWSprinklersSigned-offFull Capacity Fire12/08/2025
DOB NOWStructuralPermit IssuedTri-Star Construction12/03/2025
DOB NOWSidewalk ShedSigned-offExterior Wall & Building12/02/2025
DOB NOWPlumbingSigned-offRaptor Mechanical11/25/2025
DOB NOWPlumbingSigned-offRaptor Mechanical11/25/2025
DOB NOWPlumbingSigned-offRaptor Mechanical11/25/2025
DOB NOWMechanical SystemsSigned-offL&K Partners11/13/2025
DOB NOWStructuralSigned-offL&K Partners11/13/2025
DOB NOWStructuralSigned-offL&K Partners11/13/2025
DOB NOWMechanical SystemsPermit IssuedL&K Partners11/12/2025
DOB NOWGeneral ConstructionPermit IssuedL&K Partners11/10/2025
DOB NOWMechanical SystemsSigned-offL&K Partners11/05/2025
DOB NOWMechanical SystemsSigned-offL&K Partners11/05/2025
DOB NOWGeneral ConstructionSigned-offL&K Partners10/31/2025
DOB NOWGeneral ConstructionSigned-offL&K Partners10/31/2025
DOB NOWMechanical SystemsPermit IssuedTri-Star Construction10/31/2025
DOB NOWGeneral ConstructionSigned-offL&K Partners10/31/2025
DOB NOWPlumbingSigned-offRaptor Mechanical10/28/2025
DOB NOWPlumbingPermit IssuedCity/Suburban Plumbing10/21/2025
+ 60 more permits on file
3 projects · most recent 07/27/2026
Air Conditioning Systems Heating Systems Ventilation Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/27/2026Signed-offL&K PartnersAir Conditioning Systems, Heating Systems, Refrigeration Systems, Ventilation Systems
Cooling
Trane EXHK0604 60,400 BTU · Wshp ×13
EXVK0364 38,000 BTU · Wshp ×9
EXHK012A 14,400 BTU · Wshp ×1
Captiveaire CAS-HVAC3-E.904-24-25T-DOAS 281,300 BTU · Makeup Air ×3
Kolpak YB07KAE-TF5 1 kW · Condensing Unit ×2
Heating
Price 20 FDC TFK 37,800 BTU · Fan Powered Box ×63
50 FDC TFK 38,880 BTU · Fan Powered Box ×18
Prive 20 FDC TFK 4,104 BTU · Fan Powered Box ×12
Ventilation
Price 20/40/50 FDC TFK 1,800 CFM · Fan Powered Box ×336
Greenheck CSP-A110 50 CFM · Exhaust Fan ×6
USF-16 2,650 CFM · Exhaust Fan ×3
Captiveaire USBI24 DD-RM 4,433 CFM · Kitchen Exhaust ×3
Refrigeration
Kolpak AM26-088-1EC-PR-A 1 kW ×2
07/27/2026Signed-offL&K PartnersAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane EXVK0364 38,000 BTU · Wshp ×9
Heating
Price 20 FDC TFK 13,932 BTU · Fan Powered Box ×78
Ventilation
Price 20/40/50 FDC TFK 1,800 CFM · Fan Powered Box ×357
07/27/2026Signed-offL&K PartnersAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Liebert PX011UG 4,740 BTU · Crac Unit ×12
Trane EXVK0364 38,000 BTU · Wshp ×12
Heating
Price 20 FDC TFK 13,392 BTU · Fan Powered Box ×84
20/50 FDC TFK 3,888 BTU · Fan Powered Box ×12
Ventilation
Price 20/40/50 FDC TFK 1,800 CFM · Fan Powered Box ×450
7 projects · most recent 09/18/2026
FiledStatusContractorScope
09/18/2026Permit IssuedStandard Fire Protection115 heads, 1 outlets
08/21/2026Permit IssuedStandard Fire Protection232 heads
07/31/2026Signed-offPSI Partners1,236 heads, 2 outlets
07/31/2026Signed-offFull Capacity Fire2,523 heads, 3 outlets
07/30/2026Signed-offFull Capacity Fire2,025 heads, 2 outlets
03/02/2026Permit IssuedStandard Fire Protection—
10/15/2025Permit IssuedFull Capacity Fire555 heads, 1 outlets
7 projects · most recent 09/18/2026
Water/Sanitary Storm
FiledStatusContractorScope
09/18/2026Permit IssuedA&A PlumbingWater/Sanitary
08/21/2026Permit IssuedA&A PlumbingWater/Sanitary
07/31/2026Signed-offRaptor MechanicalWater/Sanitary
07/31/2026Signed-offRaptor MechanicalWater/Sanitary
07/30/2026Signed-offRaptor MechanicalWater/Sanitary
06/16/2026Signed-offRaptor MechanicalStorm, Water/Sanitary
10/15/2025Permit IssuedCity/Suburban PlumbingWater/Sanitary
25 projects · most recent 10/02/2026
General Wiring
FiledStatusContractorScope
10/02/2026Permit IssuedKleinknecht Electric CoGeneral Wiring
10/02/2026Permit IssuedKleinknecht Electric CoGeneral Wiring
05/29/2026Permit IssuedAllran Electric of NYGeneral Wiring
05/03/2026Permit IssuedTF ElectricalGeneral Wiring
02/13/2026Permit IssuedEpic ElectricGeneral Wiring
02/10/2026CompleteKleinknecht Electric CoGeneral Wiring
01/12/2026Permit IssuedJorob Contracting & Electrical CoGeneral Wiring
10/29/2025Permit IssuedMatros Automated ElectricalGeneral Wiring
10/02/2025Permit IssuedForest ElectricGeneral Wiring
09/15/2025CompleteBorowide Elect'l Contractors—
06/16/2025CompleteUni-Lite ElectricGeneral Wiring
05/20/2025CancelledEcny Electrical ContractorsGeneral Wiring
05/20/2025CancelledEcny Electrical ContractorsGeneral Wiring
05/20/2025CancelledEcny Electrical ContractorsGeneral Wiring
05/20/2025CancelledEcny Electrical ContractorsGeneral Wiring
5 projects · most recent 07/13/2026
Steel Concrete
FiledStatusContractorScope
07/13/2026Permit IssuedL&K PartnersSteel, Concrete
06/30/2026Permit IssuedL&K PartnersSteel
01/06/2026Permit IssuedL&K PartnersSteel, Concrete
10/29/2025Signed-offL&K PartnersSteel, Concrete
10/29/2025Signed-offL&K PartnersSteel, Concrete
2 projects · most recent 01/28/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
01/28/2026Permit IssuedAdvanced Scaffold ServiceScaffold
09/28/2020Signed-offPlatinum Services NYSidewalk Shed
▾Field Inspections (DOB CAP) — 42
DateTypeResultReport
09/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/21/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/18/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/18/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/18/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/07/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/04/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/01/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/01/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 42.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/17/2026Sprinkler SystemsANTHONY MUSUMECIspecial
09/17/2026Standpipe SystemsANTHONY MUSUMECIspecial
09/09/2026Fuel-Oil Storage and Fuel-Oil Piping Systems—special
09/02/2026Sprinkler SystemsANTHONY MUSUMECIspecial
09/02/2026Standpipe SystemsANTHONY MUSUMECIspecial
08/25/2026Sprinkler SystemsANTHONY MUSUMECIspecial
08/25/2026Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
08/18/2026Sprinkler SystemsANTHONY MUSUMECIspecial
08/18/2026Standpipe SystemsANTHONY MUSUMECIspecial
08/14/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
08/14/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/12/2026Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
08/12/2026Sprinkler SystemsANTHONY MUSUMECIspecial
08/05/2026Standpipe SystemsEUGENE BIFULCOspecial
08/05/2026Sprinkler SystemsEUGENE BIFULCOspecial
08/03/2026Sprinkler SystemsEUGENE BIFULCOspecial
08/03/2026Standpipe SystemsEUGENE BIFULCOspecial
07/31/2026Sprinkler SystemsEUGENE BIFULCOspecial
07/31/2026Standpipe SystemsEUGENE BIFULCOspecial
07/30/2026Standpipe SystemsEUGENE BIFULCOspecial
07/30/2026Sprinkler SystemsEUGENE BIFULCOspecial
07/29/2026Electrical motors and elevatorsEUGENE BIFULCOenergy_progress
07/29/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
07/29/2026Maintenance informationEUGENE BIFULCOenergy_progress
07/29/2026Lighting controlsEUGENE BIFULCOenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AmazonOfficeFloors 3, 4, 8–11
Project M01288923 Alteration · LOC Issued · 10/31/2025
Project M01288929 Alteration · LOC Issued · 10/31/2025
Project M01289029 Alteration · Permit Entire · 10/31/2025
Project M01289034 Alteration · LOC Issued · 10/31/2025
Project M01283922 Alteration · LOC Issued · 10/29/2025
Project M01283930 Alteration · LOC Issued · 10/29/2025
Project M01288937 Alteration · LOC Issued · 10/29/2025
Project M01288945 Alteration · LOC Issued · 10/29/2025
Life TimeFitness / RecreationSub-cellar, Cellar, Floors 1, 2
Project M01261822 Alteration · Permit Entire · 10/21/2025
Project M01261833 Alteration · Permit Entire · 10/20/2025
Project M01261827 Alteration · Permit Entire · 10/15/2025
HSBC BankBank / Financial branchCellar, Floors 1, 3, 5, 6, 8, 9, 11
Project M00773113 Alteration · LOC Issued · 08/08/2022
Project M00766541 Alteration · LOC Issued · 07/19/2022
Project M00722415 Alteration · LOC Issued · 05/16/2022
Project M00724776 Alteration · LOC Issued · 05/12/2022
Project M00573555 Alteration · LOC Issued · 09/24/2021
Project M00573553 Alteration · LOC Issued · 09/22/2021
Project M00573563 Alteration · LOC Issued · 09/22/2021
Project M00580157 Alteration · LOC Issued · 09/22/2021
Project M00576692 Alteration · LOC Issued · 09/21/2021
Project M00576731 Alteration · LOC Issued · 09/21/2021
Project M00576779 Alteration · LOC Issued · 09/17/2021
Project M00575099 Alteration · LOC Issued · 08/18/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,862 on file (BIS + DOB NOW)
▸Plans & Drawings105
▸DOB NOWPlans/Sketch95
09/06/2026M00063820-I1Request digital key ↗
09/03/2026M00575099-I1Request digital key ↗
09/03/2026M00576779-I1Request digital key ↗
Showing 3 of 95 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/06/2026M00063820-I1Request digital key ↗
09/06/2026M00063820-P1Request digital key ↗
09/06/2026M00063820-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00342534-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00269237-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00269234-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits548
▸BISPLAN / WORK APPROVAL APPLICATION278
04/07/2025101291068Open ↗
03/07/2025102486819Open ↗
03/07/2025121170829Open ↗
Showing 3 of 278 on file for this type
▸BISWORK PERMIT APPLICATION184
07/27/2021140900149Open ↗
01/04/2021140900149Open ↗
08/14/2020140912369Open ↗
Showing 3 of 184 on file for this type
▸DOB NOWLPC Approval/Permit85
10/14/2026M01273133-S3Open ↗
10/05/2026M01320666-P2Open ↗
09/03/2026M00576731-P1Open ↗
Showing 3 of 85 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications822
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION366
03/13/2020123845884Open ↗
03/13/2020123845884Open ↗
03/05/2020123369684Open ↗
Showing 3 of 366 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature108
10/14/2026M01273133-S3Open ↗
10/05/2026M01320666-P2Open ↗
09/10/2026M01303761-P1Open ↗
Showing 3 of 108 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature98
10/14/2026M01273133-I1Open ↗
10/05/2026M01320666-P2Open ↗
10/05/2026M01320666-P2Open ↗
Showing 3 of 98 on file for this type
▸DOB NOWProgress Inspector Seal & Signature83
10/14/2026M01273133-I1Open ↗
09/29/2026M00573553-P1Open ↗
09/29/2026M00573553-P1Open ↗
Showing 3 of 83 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST62
07/19/2021140900149Open ↗
11/27/2019123845884Open ↗
11/08/2019123819813Open ↗
Showing 3 of 62 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM59
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 59 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT31
07/21/2020140912369Open ↗
07/09/2020140912341Open ↗
06/29/2020140900149Open ↗
Showing 3 of 31 on file for this type
▸BISPC FULL REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/21/2020140912369Open ↗
07/09/2020140912341Open ↗
06/29/2020140900149Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/21/2020140912369Open ↗
07/09/2020140912341Open ↗
06/29/2020140900149Open ↗
▸Trade Schedules & Equipment236
▸BISSELF-CERT PLUMBING NOTICE85
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 85 on file for this type
▸BISSCHEDULE B - PLUMBING59
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 59 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA34
10/28/2019123224377Open ↗
Showing 1 of 34 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8521
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSIGN HANGER CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos238
▸DOB NOWDEP ACP-5: Asbestos Assessment Report90
10/14/2026M01273133-S3Open ↗
10/05/2026M01320666-P2Open ↗
09/03/2026M00576779-I1Open ↗
Showing 3 of 90 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'78
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 78 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)54
07/21/2020140912369Open ↗
07/09/2020140912341Open ↗
06/29/2020140900149Open ↗
Showing 3 of 54 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORTLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance93
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS45
03/05/2020123369684Open ↗
03/05/2020123369684Open ↗
01/15/2020123819813Open ↗
Showing 3 of 45 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
10/27/2021140912369Open ↗
08/30/2021140912341Open ↗
03/05/2020123369684Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
05/12/2022140900149Open ↗
10/27/2021140912369Open ↗
08/30/2021140912341Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/21/2020140912369Open ↗
07/09/2020140912341Open ↗
06/29/2020140900149Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/27/2022140900149Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/27/2022140900149Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY10
06/01/2022140900149Open ↗
06/01/2022140900149Open ↗
10/27/2021140912369Open ↗
Showing 3 of 10 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
05/27/2022140900149Open ↗
▸Approvals, Objections & Sign-offs288
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST106
03/11/2025100647999Open ↗
03/07/2025102486819Open ↗
03/07/2025102486864Open ↗
Showing 3 of 106 on file for this type
▸BISADMINISTRATIVE OBJECTIONS81
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 81 on file for this type
▸BISLANDMARKS APPROVAL73
07/21/2020140912369Open ↗
07/09/2020140912341Open ↗
06/29/2020140900149Open ↗
Showing 3 of 73 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
11/08/2019123819813Open ↗
07/15/2019101291077Open ↗
07/15/2019101698129Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFINAL1
05/27/2022140900149Open ↗
▸BISLANDMARKS SIGNOFF1
05/31/2022140900149Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWLandmark Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership226
▸BISCOST AFFIDAVIT226
06/01/2022140900149Open ↗
10/27/2021140912369Open ↗
08/30/2021140912341Open ↗
Showing 3 of 226 on file for this type
▸Filing & Intake Forms222
▸BISEFILING COVER SHEET135
11/27/2019123845884Open ↗
11/08/2019123819813Open ↗
Showing 2 of 135 on file for this type
▸BISADDITIONAL INFORMATION48
01/14/2022140900149Open ↗
08/27/2021140912341Open ↗
09/06/2019123860553Open ↗
Showing 3 of 48 on file for this type
▸BISBOROUGH INTAKE FORM36
01/04/2021140900149Open ↗
03/13/2020123845884Open ↗
03/05/2020123369684Open ↗
Showing 3 of 36 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/21/2020140912369Open ↗
07/09/2020140912341Open ↗
06/29/2020140900149Open ↗
▸Other Documents56
▸DOB NOWProof of Historic Building27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWProperty Ownership Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 111
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 91
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 71
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 131
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 81
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 121
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type