| Owner | Filings | Most Recent |
|---|---|---|
| SENECA GROUP | 45 | 09/13/2026 |
| CBRE | 170 | 07/08/2026 |
| ROCK GROUP NY | 13 | 07/08/2026 |
| PLATFORM SOLUTIONS INC. | 5 | 03/22/2026 |
| VIKING RESTORATION SERVICES | 5 | 03/22/2026 |
| L K PARTNERS | 4 | 03/22/2026 |
| 452 FIFTH OWNERS | 5 | 03/22/2026 |
| HSBC BANK USA NATIONAL AS | 2 | 03/22/2026 |
| HSBC BANK USA | 201 | 03/22/2026 |
| HSBC BANK USA ATTEN:VALER | 3 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 27 | 08/25/2026 |
| PATUXENT ENGINEERING LLC | 4 | 08/06/2026 |
| PAE CONSULTING ENGINEERS | 12 | 07/31/2026 |
| PAE NEW YORK ENGINEERS | 9 | 07/27/2026 |
| ZGF ARCHITECTS | 10 | 07/13/2026 |
| GILSANZ MURRAY STEFICEK LLP | 5 | 06/30/2026 |
| ARCHITECTURE PLUS INFORMATION | 9 | 04/23/2026 |
| NEW AGE ENGINEERING PLLC | 1 | 03/02/2026 |
| THORNTON TOMASETTI | 3 | 10/29/2025 |
| FL&M ENGINEERING DESIGN &INSPECTION | 3 | 10/20/2025 |
| ALWAYS FAST SERVICES CORP | 1 | 09/12/2025 |
| PLATFORM SOLUTIONS INC | 1 | 03/11/2025 |
| DIAZ ARCHITECTS INC.,PA | 1 | 06/12/2024 |
| TPG ARCHITECTURE, LLP | 5 | 06/20/2023 |
| ST ENGINEERING SERVICES LLP | 2 | 03/16/2023 |
| MICHAEL SAVARESE ASSC., ARCHITECTS | 3 | 08/08/2022 |
| GNP DESIGN GROUP | 1 | 05/16/2022 |
| ASIF JAMIL, RA | 3 | 09/28/2020 |
| R.G. VANDERWEIL ENGINEERS, PC | 3 | 07/10/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 99 | 03/21/2026 |
| DESARNO ASSOCIATES | 8 | 03/21/2026 |
| GREEN STUDIO | 6 | 03/21/2026 |
| METROPOLIS GROUP INC | 10 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| L&K PARTNERS, INC | General Contractor | 25 | 07/10/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 21 | 07/08/2026 |
| RAPTOR MECHANICAL,INC | Plumbing | 7 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 6 | 07/08/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 5 | 04/09/2026 |
| ROCK GROUP NY CORP | General Contractor | 4 | 07/08/2026 |
| STANDARD FIRE PROTECT LLC | Fire Protection | 4 | 07/10/2026 |
| REILLY, CHRISTOPHER | Electrical | 3 | 03/21/2026 |
| URBAN INTELLIGENCE, INC | General Contractor | 3 | 03/21/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 3 | 03/21/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 3 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Fire Protection | 3 | 07/08/2026 |
| PETTINATO, JUSTIN | Electrical | 3 | 03/21/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 2 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 2 | 06/28/2026 |
| ADVANCED SCAFFOLD SERVICE | General Contractor | 2 | 04/09/2026 |
| EXTERIOR WALL & BUILDING | General Contractor | 2 | 04/11/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 2 | 03/21/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 2 | 03/21/2026 |
| A&A PLUMBING CORP | Plumbing | 2 | 07/10/2026 |
| MAC FELDER INC | Plumbing | 2 | 07/08/2026 |
| KLEINKNECHT ELEC. CO.,INC | Electrical | 1 | 03/22/2026 |
| JOHN FOLEY | Electrical | 1 | 03/21/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ETI CONSULTANTS LLC | 7694 | 22 | 08/25/2026 |
| CROSSCHECK INSPECTION SER | 544 | 33 | 07/31/2026 |
| NEW AGE ENGINEERING PLLC | 7746 | 1 | 03/02/2026 |
| SKYLINE ENGINEERING, PLLC | 267 | 3 | 12/08/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 15 | 07/06/2023 |
| MILROSE CONSULTANTS LLC | 2003 | 2 | 03/16/2023 |
| WINTON GROUP ARCHITECTURE | 4343 | 1 | 05/16/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | STANDARD FIRE PROTECT LLC | 07/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 07/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | STANDARD FIRE PROTECT LLC | 07/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | A&A PLUMBING CORP | 07/09/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ADVANCED SCAFFOLD SER.LLC | 06/10/2026 |
| DOB NOW | Structural | Permit Issued | L&K PARTNERS, INC | 03/25/2026 |
| DOB NOW | Structural | Permit Issued | L&K PARTNERS, INC | 03/19/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 03/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | STANDARD FIRE SUPP CORP | 03/03/2026 |
| DOB NOW | Plumbing | Permit Issued | STANDARD FIRE SUPP CORP | 03/02/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 02/27/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 02/26/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ADVANCED SCAFFOLD SERVICE | 01/28/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ADVANCED SCAFFOLD SERVICE | 01/27/2026 |
| DOB NOW | Standpipe | Signed-off | MORA FIRE PROTECTION LLC | 01/25/2026 |
| DOB NOW | Plumbing | Signed-off | MORA FIRE PROTECTION LLC | 01/16/2026 |
| DOB NOW | Structural | Signed-off | L&K PARTNERS, INC | 01/09/2026 |
| DOB NOW | Plumbing | Signed-off | FULL CAPACITY FIRE CORP | 01/08/2026 |
| DOB NOW | Plumbing | Signed-off | FULL CAPACITY FIRE CORP | 01/08/2026 |
| DOB NOW | Plumbing | Signed-off | FULL CAPACITY FIRE CORP | 12/08/2025 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 12/08/2025 |
| DOB NOW | Structural | Permit Issued | TRI-STAR CONSTRUCTION COR | 12/03/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | EXTERIOR WALL & BUILDING | 12/02/2025 |
| DOB NOW | Plumbing | Signed-off | RAPTOR MECHANICAL, INC | 11/25/2025 |
| DOB NOW | Standpipe | Signed-off | RAPTOR MECHANICAL, INC | 11/25/2025 |
| DOB NOW | Sprinklers | Signed-off | RAPTOR MECHANICAL, INC | 11/25/2025 |
| DOB NOW | Structural | Signed-off | L&K PARTNERS, INC | 11/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | L&K PARTNERS, INC | 11/13/2025 |
| DOB NOW | Structural | Signed-off | L&K PARTNERS, INC | 11/13/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 11/12/2025 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 11/10/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 11/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | L&K PARTNERS, INC | 11/05/2025 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 10/31/2025 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 10/31/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | TRI-STAR CONSTRUCTION COR | 10/31/2025 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 10/31/2025 |
| DOB NOW | Plumbing | Signed-off | RAPTOR MECHANICAL, INC | 10/28/2025 |
| DOB NOW | Plumbing | Permit Issued | CITY/SUBURBAN PLBG CORP | 10/21/2025 |
| DOB NOW | Plumbing | Permit Issued | FULL CAPACITY FIRE CORP | 10/17/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/27/2026 | Signed-off | L&K PARTNERS, INC | Air Conditioning Systems, Heating Systems, Ventilation Systems | |
| 07/27/2026 | Permit Issued | L&K PARTNERS, INC | Air Conditioning Systems, Heating Systems, Refrigeration Systems, Ventilation Systems | Cooling Captiveaire CAS-HVAC3-E.904-24-25T-DOAS 281,300 BTU · Makeup Air ×3 Kolpak YB07KAE-TF5 1 kW · Condensing Unit ×2 Heating Prive 20 FDC TFK 4,104 BTU · Fan Powered Box ×12 Ventilation Price 20/40/50 FDC TFK 1,800 CFM · Fan Powered Box ×336 Captiveaire USBI24 DD-RM 4,433 CFM · Kitchen Exhaust ×3 Refrigeration Kolpak AM26-088-1EC-PR-A 1 kW ×2 |
| 07/27/2026 | Signed-off | L&K PARTNERS, INC | Air Conditioning Systems, Heating Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | STANDARD FIRE PROTECT LLC | 115 heads, 1 outlets |
| 08/21/2026 | Permit Issued | STANDARD FIRE PROTECT LLC | 232 heads |
| 07/31/2026 | Signed-off | PSI PARTNERS, LLC | 1,236 heads, 2 outlets |
| 07/31/2026 | Signed-off | FULL CAPACITY FIRE CORP | 2,523 heads, 3 outlets |
| 07/30/2026 | Signed-off | FULL CAPACITY FIRE CORP | 2,025 heads, 2 outlets |
| 03/02/2026 | Permit Issued | STANDARD FIRE PROTECT LLC | — |
| 10/15/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 555 heads, 1 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 08/21/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 07/31/2026 | Signed-off | RAPTOR MECHANICAL, INC | Water/Sanitary |
| 07/31/2026 | Signed-off | RAPTOR MECHANICAL, INC | Water/Sanitary |
| 07/30/2026 | Signed-off | RAPTOR MECHANICAL, INC | Water/Sanitary |
| 06/16/2026 | Signed-off | RAPTOR MECHANICAL, INC | Storm, Water/Sanitary |
| 10/15/2025 | Permit Issued | CITY/SUBURBAN PLBG CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/29/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 05/03/2026 | Permit Issued | TF ELECTRICAL CORP | General Wiring |
| 02/13/2026 | Permit Issued | EPIC ELECTRIC INC | General Wiring |
| 02/10/2026 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 02/10/2026 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 01/12/2026 | Permit Issued | JOROB CONTR'G & ELEC'L CO | General Wiring |
| 11/26/2025 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 10/29/2025 | Permit Issued | MATROS AUTOMATED ELEC'L C | General Wiring |
| 10/02/2025 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 09/15/2025 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 06/16/2025 | Complete | UNI-LITE ELECTRIC, LLC | General Wiring |
| 05/20/2025 | Cancelled | ECNY ELEC'L CONTR'S, INC | General Wiring |
| 05/20/2025 | Cancelled | ECNY ELEC'L CONTR'S, INC | General Wiring |
| 05/20/2025 | Cancelled | ECNY ELEC'L CONTR'S, INC | General Wiring |
| 05/20/2025 | Cancelled | ECNY ELEC'L CONTR'S, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/13/2026 | Permit Issued | L&K PARTNERS, INC | Steel, Concrete |
| 06/30/2026 | Permit Issued | L&K PARTNERS, INC | Steel |
| 01/06/2026 | Permit Issued | L&K PARTNERS, INC | Steel, Concrete |
| 10/29/2025 | Signed-off | L&K PARTNERS, INC | Steel, Concrete |
| 10/29/2025 | Signed-off | L&K PARTNERS, INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | Permit Issued | ADVANCED SCAFFOLD SERVICE | Scaffold |
| 09/28/2020 | Signed-off | PLATINUM SERVICES NY LLC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/21/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/18/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/18/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/18/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/13/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/07/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/07/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/04/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/01/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 07/01/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 06/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/19/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/16/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/02/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/02/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/01/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/31/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/30/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/02/2026 | Standpipe Systems | ANTHONY MUSUMECI | special |
| 09/02/2026 | Sprinkler Systems | ANTHONY MUSUMECI | special |
| 08/25/2026 | Fire-Resistant Penetrations and Joints | ANTHONY MUSUMECI | special |
| 08/25/2026 | Sprinkler Systems | ANTHONY MUSUMECI | special |
| 08/18/2026 | Sprinkler Systems | ANTHONY MUSUMECI | special |
| 08/18/2026 | Standpipe Systems | ANTHONY MUSUMECI | special |
| 08/14/2026 | Structural Stability – Alterations of existing buildings | EUGENE BIFULCO | special |
| 08/14/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | ANTHONY MUSUMECI | special |
| 08/12/2026 | Sprinkler Systems | ANTHONY MUSUMECI | special |
| 08/05/2026 | Standpipe Systems | EUGENE BIFULCO | special |
| 08/05/2026 | Sprinkler Systems | EUGENE BIFULCO | special |
| 08/03/2026 | Standpipe Systems | EUGENE BIFULCO | special |
| 08/03/2026 | Sprinkler Systems | EUGENE BIFULCO | special |
| 07/31/2026 | Standpipe Systems | EUGENE BIFULCO | special |
| 07/31/2026 | Sprinkler Systems | EUGENE BIFULCO | special |
| 07/30/2026 | Sprinkler Systems | EUGENE BIFULCO | special |
| 07/30/2026 | Standpipe Systems | EUGENE BIFULCO | special |
| 07/29/2026 | Maintenance information | EUGENE BIFULCO | energy_progress |
| 07/29/2026 | HVAC-R and service water heating equipment | EUGENE BIFULCO | energy_progress |
| 07/29/2026 | Lighting controls | EUGENE BIFULCO | energy_progress |
| 07/29/2026 | Electrical motors and elevators | EUGENE BIFULCO | energy_progress |
| 07/29/2026 | HVAC-R and service water piping design and insulation | EUGENE BIFULCO | energy_progress |
| 07/29/2026 | Emergency and Standby Power Systems (Generator) | EUGENE BIFULCO | special |
| 07/29/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| HSBC | Office | Floors 3, 6 | Project M00773113 Project M00766541 |