← Back
BROOKLYN
452 THOMAS S BOYLAND STREET
BROOKLYN · Brownsville · BIN 3429855
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction182p · 3 filings · 20 docs
Floor 4Under Construction159p · 1 filing · 20 docs
Floor 3Under Construction200p · 3 filings · 20 docs
Floor 2Under Construction192p · 3 filings · 20 docs
Floor 1Under Construction316p · 5 filings · 20 docs
CellarUnder Construction232p · 2 filings · 20 docs
Site & exteriorUnder Construction107p · 9 filings · 20 docs
Filed — no permit issued9p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PINNACLE INDUSTRIES II307/08/2026
DCAS DEPARTMENT OF CITYSIDE ADMI103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2403/21/2026
A1 EXPEDITING SERVICE CORP.303/21/2026
EXPEDITE DEM1203/21/2026
A1 EXPEDITING SERVICE1203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
DOMANI CONSULTING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GILBANE BUILDING COMPANYGeneral Contractor3607/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor907/08/2026
GRAMERCY GROUP, INCGeneral Contractor807/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection407/08/2026
COMPOSITE TEC & INFRASTRUGeneral Contractor306/28/2026
PJP INSTALLERS INCGeneral Contractor207/08/2026
ALLIANCE PLUMBING CORPPlumbing207/08/2026
PACE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS14382303/03/2026
G. BLINN CONSULTING, LLC2894201/30/2025
Building Lifecycle
All (259)Filed (43)Permit Issued (59)Signed Off (8)Violation (21)Inspection (18)Objection (80)Special Inspection (30)
07/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2026
Violation issued (ECB, open)
Construction
07/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/25/2026
Permit issued — General Construction
B00941733-I1-GC
06/23/2026
Permit issued — General Construction
B00941733-I1-GC
06/23/2026
Permit issued — Mechanical Systems
B00941733-S3-MS
06/23/2026
Permit issued — Mechanical Systems
B00941733-S8-MS
06/23/2026
Permit issued — Support of Excavation
B00941733-S6-SE
06/23/2026
Permit issued — Construction Fence
B01054919-I1-FN
06/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/17/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
06/11/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
06/11/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/11/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/28/2026
Signed off — Alteration
B01061630-I1
05/27/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/07/2026
Signed off — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01174130-I1
04/30/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/28/2026
Permit issued — Solar
B00941733-Z4-SL
04/14/2026
Special inspection requirement — Public Assembly Emergency Lighting
JAMES WILSON
04/14/2026
Special inspection requirement — Public Assembly Emergency Lighting
JAMES WILSON
04/03/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/13/2026
Objection raised — Other
03/03/2026
Filed — New Building
Plumbing work as per plans filed.
B00941733-P9
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES WILSON
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
03/02/2026
Special inspection requirement — Post-installed Anchors
JAMES WILSON
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES WILSON
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES WILSON
03/02/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JAMES WILSON
02/26/2026
Special inspection requirement — Protection of exposed foundation insulation
JAMES WILSON
02/26/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JAMES WILSON
02/26/2026
Special inspection requirement — Insulation placement and R values
JAMES WILSON
02/26/2026
Special inspection requirement — Vestibules
JAMES WILSON
02/26/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
02/26/2026
Special inspection requirement — Air barrier - visual inspection
JAMES WILSON
02/26/2026
Special inspection requirement — Maintenance information
JAMES WILSON
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
02/26/2026
Special inspection requirement — Electrical motors and elevators
JAMES WILSON
02/26/2026
Special inspection requirement — Masonry
JAMES WILSON
02/26/2026
Special inspection requirement — Lighting controls
JAMES WILSON
02/26/2026
Special inspection requirement — Interior lighting power
JAMES WILSON
02/26/2026
Special inspection requirement — Fenestration air leakage
JAMES WILSON
02/26/2026
Special inspection requirement — Exterior lighting power
JAMES WILSON
02/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES WILSON
02/26/2026
Special inspection requirement — Preliminary
JAMES WILSON
02/26/2026
Special inspection requirement — Sprayed fire-resistant materials
JAMES WILSON
02/26/2026
Special inspection requirement — Air barrier — testing
JAMES WILSON
02/26/2026
Special inspection requirement — Air barrier continuity plan testing
JAMES WILSON
02/26/2026
Special inspection requirement — Fenestration areas
JAMES WILSON
02/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES WILSON
02/11/2026
Permit issued — Solar
B00941733-Z4-SL
02/04/2026
Objection resolved — Addressed
02/04/2026
Objection resolved — Addressed
02/04/2026
Objection resolved — Addressed
02/04/2026
Objection resolved — Addressed
02/04/2026
Objection resolved — Addressed
Latest 60 of 259 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/25/2026
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY06/23/2026
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY06/23/2026
DOB NOWSupport of ExcavationPermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWConstruction FencePermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWSolarPermit IssuedCOMPOSITE TEC & INFRASTRU04/28/2026
DOB NOWSolarPermit IssuedCOMPOSITE TEC & INFRASTRU02/11/2026
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC01/29/2026
DOB NOWConstruction FencePermit IssuedGILBANE BUILDING COMPANY12/24/2025
DOB NOWSupport of ExcavationPermit IssuedGILBANE BUILDING COMPANY12/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offGILBANE BUILDING COMPANY12/24/2025
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY12/24/2025
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY12/24/2025
DOB NOWEarth WorkSigned-offGILBANE BUILDING COMPANY12/24/2025
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE11/05/2025
DOB NOWStructuralSigned-offCOMPOSITE TEC & INFRASTRU10/31/2025
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC09/26/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/26/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/26/2025
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC09/10/2025
DOB NOWStandpipePermit IssuedRAEL AUTOMATIC SPR.CO INC09/10/2025
DOB NOWSupport of ExcavationPermit IssuedGILBANE BUILDING COMPANY06/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offGILBANE BUILDING COMPANY06/23/2025
DOB NOWEarth WorkSigned-offGILBANE BUILDING COMPANY06/23/2025
DOB NOWConstruction FencePermit IssuedGILBANE BUILDING COMPANY06/23/2025
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY06/23/2025
DOB NOWMechanical SystemsSigned-offGILBANE BUILDING COMPANY06/23/2025
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/23/2025
DOB NOWBoiler EquipmentSigned-offOLYMPIAN FUEL OIL CORP06/05/2025
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE03/31/2025
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC03/13/2025
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC02/03/2025
DOB NOWSupported ScaffoldSigned-offGILBANE BUILDING COMPANY01/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC11/20/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC11/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC11/14/2024
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY10/01/2024
DOB NOWFoundationSigned-offGILBANE BUILDING COMPANY09/17/2024
+ 10 more permits on file
1 project · most recent 03/03/2026
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2026Permit IssuedGILBANE BUILDING COMPANYGenerators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane TPKA0A0181LA00A 2 tons · Split System ×3
TURYE1684AN41AN 14 tons · Vrf Outdoor ×3
OANE540A4 8,550 CFM · Doas ×2
TPKA0A0241KA70A 2 tons · Split System ×2
TPLFYEP048EM140B 4 tons · Vrf Indoor ×2
TURYE0964AN41AN 8 tons · Vrf Outdoor ×2
TURYE1444AN41AN 12 tons · Vrf Outdoor ×2
OAKE210A4 3,500 CFM · Rooftop Unit ×1
OAKE630A4 5,800 CFM · Doas ×1
TPKFYP030KM142A 3 tons · Vrf Indoor ×1
TUHYE1204AN41AN 14 tons · Vrf Outdoor ×1
TURYE2404AN41AN 20 tons · Vrf Outdoor ×1
Mitsubishi Electric PUZ-A12NKA7 8 tons · Vrf Outdoor ×4
PUY-A18NKA7 1 tons · Condensing Unit ×2
PUZ-A24NHA7 2 tons · Condensing Unit ×2
MXZ-SM48NAM2 4 tons · Vrf Outdoor ×1
PURY-EP120YNU-A1 10 tons · Vrf Outdoor ×1
PUZ-A18NKA7 1 tons · Condensing Unit ×1
PUZ-A30NHA7 3 tons · Vrf Outdoor ×1
Ventilation
Greenheck CUE-130-VG 1,500 CFM · Exhaust Fan ×2
CUE-099-VG 250 CFM · Exhaust Fan ×1
CUE-100HP-VG 250 CFM · Exhaust Fan ×1
G-070-VG 70 CFM · Exhaust Fan ×1
Accurex XCUBE-180HP-20 2,250 CFM · Kitchen Exhaust ×1
XMSX-P116-H22-MF 2,250 CFM · Kitchen Exhaust ×1
Generators
Kohler 500REOZJC 500 kW · Generator ×1
1 project · most recent 03/03/2026
Sprinkler System
FiledStatusContractorScope
03/03/2026Permit IssuedRAEL AUTOMATIC SPR.CO INCSprinkler System
1 project · most recent 03/03/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/03/2026Permit IssuedCARDOZA PLUMBING CORPStorm, Water/Sanitary
6 projects · most recent 07/25/2026
General Wiring
FiledStatusContractorScope
07/25/2026Permit IssuedJAM ELECTRICAL CORPGeneral Wiring
07/02/2026CompleteCELLECTRIC ELECTRICAL LLC—
12/18/2024Permit IssuedMULTI-PHASE ELEC'L SVCS—
12/04/2024Permit IssuedMULTI-PHASE ELEC'L SVCSGeneral Wiring
08/15/2024Permit IssuedMULTI-PHASE ELEC'L SVCS2 meters, 2 new_meters
08/17/2023CompleteMULTI-PHASE ELEC'L SVCS1 meters, 1 new_meters
1 project · most recent 03/03/2026
Steel Concrete
FiledStatusContractorScope
03/03/2026Permit IssuedGILBANE BUILDING COMPANYSteel, Concrete
1 project · most recent 03/03/2026
FiledStatusContractorScope
03/03/2026Permit IssuedGILBANE BUILDING COMPANY372 panels, 150 kw, 12,500 roof_area_sqft
1 project · most recent 12/19/2024
Fence
FiledStatusContractorScope
12/19/2024Permit IssuedGILBANE BUILDING COMPANYFence
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
07/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/17/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/11/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
06/11/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/11/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/27/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/30/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/21/2026Fail-Final Boiler Equipment InspectionFailView ↗
12/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/24/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 140
DateRequirementInspectorRole
04/14/2026Public Assembly Emergency LightingJAMES WILSONprogress
04/14/2026Public Assembly Emergency LightingJAMES WILSONprogress
03/02/2026Post-installed AnchorsJAMES WILSONspecial
03/02/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsJAMES WILSONspecial
03/02/2026Fire-Resistant Penetrations and JointsJAMES WILSONspecial
03/02/2026HVAC-R and service water piping design and insulationJAMES WILSONenergy_progress
03/02/2026HVAC-R and service water heating equipmentJAMES WILSONenergy_progress
03/02/2026HVAC-R and service water heating system controlsJAMES WILSONenergy_progress
02/26/2026Maintenance informationJAMES WILSONenergy_progress
02/26/2026Lighting controlsJAMES WILSONenergy_progress
02/26/2026Fenestration and door U-factor and product ratingsJAMES WILSONenergy_progress
02/26/2026Fenestration air leakageJAMES WILSONenergy_progress
02/26/2026Exterior lighting powerJAMES WILSONenergy_progress
02/26/2026Insulation placement and R valuesJAMES WILSONenergy_progress
02/26/2026Air barrier continuity plan testingJAMES WILSONenergy_progress
02/26/2026Interior lighting powerJAMES WILSONenergy_progress
02/26/2026Wall Panels, Curtain Walls, and VeneersJAMES WILSONspecial
02/26/2026MasonryJAMES WILSONspecial
02/26/2026Fire-Resistant Penetrations and JointsJAMES WILSONspecial
02/26/2026Electrical motors and elevatorsJAMES WILSONenergy_progress
02/26/2026Air barrier — testing JAMES WILSONenergy_progress
02/26/2026VestibulesJAMES WILSONenergy_progress
02/26/2026Air barrier - visual inspectionJAMES WILSONenergy_progress
02/26/2026Protection of exposed foundation insulationJAMES WILSONenergy_progress
02/26/2026Fenestration areasJAMES WILSONenergy_progress
Latest 25 of 140.
▾Documents — 346 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch39
08/27/2026B00884657-I1Request digital key ↗
08/27/2026B00884657-S1Request digital key ↗
08/27/2026B00884657-S2Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/21/2026B01211433-I1Request digital key ↗
08/21/2026B01211433-P1Request digital key ↗
08/19/2026B01211425-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION5
04/09/2025320597163Open ↗
10/29/2024340908478Open ↗
09/30/2024340908478Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Stormwater Construction Permit5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
11/13/2024340908478Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications185
▸DOB NOWProgress Inspector Seal & Signature88
09/28/2026B00941733-Z4Open ↗
09/28/2026B00941733-Z4Open ↗
09/23/2026B00941733-P4Open ↗
Showing 3 of 88 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature52
09/28/2026B00941733-S5Open ↗
09/28/2026B00941733-S5Open ↗
09/28/2026B00941733-S5Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/27/2026B00884657-S2Open ↗
08/27/2026B00884657-P3Open ↗
08/27/2026B00884657-I1Open ↗
Showing 3 of 43 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/03/2024340908478Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/29/2024340908478Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWElectric Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWater Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSewer Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWGas Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/24/2024340908478Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/13/2024340908478Open ↗
▸BISSTREET TREE CHECKLIST1
11/07/2024340908478Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026B00884657-I1Open ↗
08/27/2026B00910547-I1Open ↗
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs64
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter43
08/27/2026B00910547-P1Open ↗
08/27/2026B00910547-I1Open ↗
08/24/2026B01071758-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
10/03/2024340908478Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
12/15/2014320597163Open ↗
12/15/2014320597163Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/03/2024340908478Open ↗
▸Other Documents15
▸DOB NOWStructure Photographs3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWSite Survey: Initial3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
10/29/2024340908478Open ↗
▸DOB NOWInspector's Report1
08/24/2026B01071758-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCommunity Board Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type