← Back
Elevator cooperative
4525 HENRY HUDSON PKWY W
BRONX · Riverdale-Spuyten Duyvil · BIN 2085807
💬 Discuss this project
1953Year Built
12Stories
D4Building Class
R4Zoning
201,511 sfGross Floor Area
145Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 4525 & 4555 APARTMENT · 135,950 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 13 docs
Floor 101 filing · 1 doc
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11 filing · 1 doc
CellarUnder Construction1 filing · 1 doc
Site & exterior1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GARTHCHESTER REALTY3907/08/2026
4525 4555 APARTMENTS1403/22/2026
KINGS GROUP NY CORP503/22/2026
KREISEL303/21/2026
C O GARTHCHESTER REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SKY MANAGEMENT GROUP403/21/2026
JULIAN A. GOMEZ403/21/2026
RIGGINING CONSULTANTS303/21/2026
Rigid Structural Design, LLC203/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURAL PRESERV SYSTEMGeneral Contractor403/21/2026
ADVANCED PLBG, MECH & SPRFire Protection307/08/2026
KINGS GROUP NY CORPGeneral Contractor303/21/2026
ADVANCED PLUMBING MECHPlumbing307/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor303/21/2026
ASTRO ELECL CONTNG INCElectrical203/22/2026
MEG II DESIGN LLCGeneral Contractor107/08/2026
ADVANCED PLBG MECH SPRPlumbing103/22/2026
MC SUPERSTRUCTURE INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266304/27/2026
SOCOTEC ENGINEERING4983302/08/2024
GREENLINE DEVELOPERS, LLC3447205/10/2021
Building Lifecycle
All (139)Filed (13)Permit Issued (14)Signed Off (6)Facade (FISP) (17)Violation (60)Objection (4)Special Inspection (25)
07/13/2026
Cycle 10 facade report submitted
07/13/2026
Cycle 10 facade inspection completed
07/09/2026
Cycle 10 facade report signed — SAFE
06/30/2026
Signed off — Alteration
X01229810-I1
05/20/2026
Signed off — Alteration
9th Cycle Facade Repair program. No change in use, to egress or in occupancy.
X08040429-I1
05/13/2026
Special inspection requirement — Post-installed Anchors
Yevgeniy Gurevich
05/13/2026
Special inspection requirement — Final
Yevgeniy Gurevich
05/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Gurevich
05/13/2026
Special inspection requirement — Air barrier - visual inspection
Yevgeniy Gurevich
05/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/13/2026
Special inspection requirement — Masonry
Yevgeniy Gurevich
05/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yevgeniy Gurevich
04/27/2026
Filed — Alteration
9th Cycle Facade Repair program. No change in use, to egress or in occupancy.
X08040429-P2
01/15/2026
Signed off — Alteration
ENLARGED EXISTING BATHROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01248808-I1
01/12/2026
Permit issued — General Construction
X01248808-I1-GC
11/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/18/2025
Violation issued (HPD, closed)
I
11/04/2025
Filed — Alteration
ENLARGED EXISTING BATHROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01248808-I1
10/27/2025
Permit issued — Plumbing
X00261501-I1-EW-SP
10/08/2025
Special inspection requirement — Air barrier - visual inspection
Yevgeniy Gurevich
10/08/2025
Special inspection requirement — Masonry
Yevgeniy Gurevich
10/08/2025
Special inspection requirement — Post-installed Anchors
Yevgeniy Gurevich
10/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yevgeniy Gurevich
10/08/2025
Special inspection requirement — Final
Yevgeniy Gurevich
10/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Gurevich
07/17/2025
Permit issued — Suspended Scaffold
X01229810-I1-SC
06/02/2025
Permit issued — Suspended Scaffold
X01229810-I1-SC
05/30/2025
Filed — Alteration
X01229810-I1
01/28/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00817677-I1
06/12/2024
Signed off — Alteration
FACADE RESTORATION AND INSPECTION. Site Supervisor: PARAMDEO NARINE
X00977668-I1
06/04/2024
Permit issued — General Construction
X08040429-I1-GC
04/04/2024
Violation issued (ECB, closed)
Construction
02/20/2024
Permit issued — Suspended Scaffold
X00977668-P2-SC
02/20/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
02/16/2024
Objection raised — Other
02/16/2024
Objection resolved — Addressed
02/16/2024
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
02/08/2024
Filed — Alteration
FACADE RESTORATION AND INSPECTION. Site Supervisor: PARAMDEO NARINE
X00977668-P2
01/06/2024
Filed — Alteration
FACADE RESTORATION AND INSPECTION. Site Supervisor: PARAMDEO NARINE
X00977668-P1
12/15/2023
Filed — Alteration
FACADE RESTORATION AND INSPECTION. Site Supervisor: PARAMDEO NARINE
X00977668-I1
08/11/2023
Permit issued — Sidewalk Shed
X00817677-I1-SH
06/08/2023
Permit issued — General Construction
X08040429-I1-GC
05/22/2023
Objection resolved — Addressed
05/18/2023
Objection raised — Structural
05/10/2023
Filed — Alteration
9th Cycle Facade Repair program. No change in use, to egress or in occupancy.
X08040429-P1
05/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Yevgeniy Gurevich
05/09/2023
Special inspection requirement — Masonry
Yevgeniy Gurevich
05/09/2023
Special inspection requirement — Post-installed Anchors
Yevgeniy Gurevich
05/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
05/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Yevgeniy Gurevich
05/09/2023
Special inspection requirement — Final
Yevgeniy Gurevich
05/09/2023
Special inspection requirement — Air barrier - visual inspection
Yevgeniy Gurevich
03/17/2023
Violation issued (HPD, closed)
A
03/06/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00817677-P1
01/31/2023
Filed — Alteration
9th Cycle Facade Repair program. No change in use, to egress or in occupancy.
X08040429-I1
01/31/2023
Permit issued — Sidewalk Shed
X00817677-I1-SH
01/30/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00817677-I1
02/17/2022
Violation issued (HPD, closed)
A
11/24/2021
Cycle 9 facade report signed — SWARMP
10/27/2021
Cycle 9 facade report submitted
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMEG II DESIGN LLC01/12/2026
DOB NOWPlumbingPermit IssuedADVANCED PLBG, MECH & SPR10/27/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/17/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM06/02/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM06/04/2024
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM02/20/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/11/2023
DOB NOWGeneral ConstructionSigned-offSTRUCTURAL PRESERV SYSTEM06/08/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING01/31/2023
DOB NOWPlumbingPermit IssuedADVANCED PLBG, MECH & SPR05/14/2021
DOB NOWSprinklersSigned-offADVANCED PLUMBING MECH05/13/2021
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP06/01/2020
DOB NOWSprinklersSigned-offADVANCED PLUMBING MECH01/24/2020
DOB NOWSprinklersPermit IssuedADVANCED PLBG, MECH & SPR01/23/2020
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/23/2020
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM05/18/2020
BISOTISSUEDDUAL FUEL COMPANY LLC08/04/2017
BISPLISSUEDDUAL FUEL PLUBING & HTING08/04/2017
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM06/29/2017
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM04/26/2017
BISOTISSUEDSKYLINE RESTORATION INC04/02/2015
BISEQISSUEDSPRING SCAFFOLDING LLC12/30/2014
BISEQISSUEDSKYLINE RESTORATION INC10/29/2014
BISOTISSUEDSKYLINE RESTORATION INC07/03/2014
BISOTISSUEDSKYLINE RESTORATION INC03/25/2014
BISEQISSUEDSPRING SCAFFOLDING LLC12/27/2013
BISEQISSUEDSPRING SCAFFOLDING LLC12/23/2013
BISOTISSUEDOFF THE WALLCOVERING INC11/14/2013
BISOTISSUEDSKYLINE RESTORATION INC06/25/2013
BISOTISSUEDSKYLINE RESTORATION INC05/03/2013
BISEQISSUEDSPRING SCAFFOLDING LLC04/24/2013
BISBLISSUEDC C CONTROLLED COMBUSTION02/28/2013
BISOTISSUEDOFF THE WALLCOVERING INC02/06/2013
BISEQISSUEDSPRING SCAFFOLDING LLC01/10/2013
BISEQISSUEDSPRING SCAFFOLDING LLC03/28/2012
BISBLISSUEDC C CONTROLLED COMBUSTION09/09/2011
BISOTISSUEDSKYLINE RESTORATION INC07/22/2011
BISEQISSUEDOUTDOOR INSTALLATIONS LLC04/25/2011
BISOTISSUEDSKYLINE RESTORATION INC03/16/2011
BISOTISSUEDSKYLINE RESTORATION INC09/09/2010
+ 11 more permits on file
1 project · most recent 05/10/2021
FiledStatusContractorScope
05/10/2021Permit IssuedADVANCED PLBG, MECH & SPR14 heads
1 project · most recent 05/10/2021
Gas Water/Sanitary
FiledStatusContractorScope
05/10/2021Signed-offADVANCED P,MECH & SPR CORGas, Water/Sanitary
3 projects · most recent 03/14/2023
General Wiring
FiledStatusContractorScope
03/14/2023CompleteASTRO ELECL CONTNG INCGeneral Wiring
02/01/2023CompleteNASH ELECTRIC SERVICES IN—
08/18/2021CompleteASTRO ELECL CONTNG INCGeneral Wiring
1 project · most recent 04/27/2026
FiledStatusContractorScope
04/27/2026Permit IssuedSTRUCTURAL PRESERV SYSTEM1 scope_items
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/13/2026Post-installed AnchorsYevgeniy Gurevichspecial
05/13/2026FinalYevgeniy Gurevichprogress
05/13/2026Energy Code Compliance InspectionsYevgeniy Gurevichprogress
05/13/2026Air barrier - visual inspectionYevgeniy Gurevichenergy_progress
05/13/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/13/2026MasonryYevgeniy Gurevichspecial
05/13/2026Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
11/24/2025Tenant Protection Plan Compliance—special
10/08/2025Air barrier - visual inspectionYevgeniy Gurevichenergy_progress
10/08/2025MasonryYevgeniy Gurevichspecial
10/08/2025Post-installed AnchorsYevgeniy Gurevichspecial
10/08/2025Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
10/08/2025FinalYevgeniy Gurevichprogress
10/08/2025Energy Code Compliance InspectionsYevgeniy Gurevichprogress
02/20/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
02/16/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/09/2023Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
05/09/2023MasonryYevgeniy Gurevichspecial
05/09/2023Post-installed AnchorsYevgeniy Gurevichspecial
05/09/2023Tenant Protection Plan Compliance—special
05/09/2023Energy Code Compliance InspectionsYevgeniy Gurevichprogress
05/09/2023FinalYevgeniy Gurevichprogress
05/09/2023Air barrier - visual inspectionYevgeniy Gurevichenergy_progress
05/12/2021Sprinkler SystemsDAVID SILBERMANspecial
05/06/2020FinalSunil Saigalprogress
▾Documents — 308 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch10
08/23/2026X00817677-P1Request digital key ↗
08/23/2026X00817677-I1Request digital key ↗
08/22/2026X00977668-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026X00261501-I1Request digital key ↗
08/25/2026X00261501-P2Request digital key ↗
08/15/2026X00261501-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/25/2026X00261501-I1Request digital key ↗
08/25/2026X00261501-P2Request digital key ↗
08/15/2026X00261501-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00347076-I1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION28
09/25/2024220696762Open ↗
09/16/2024220696762Open ↗
08/20/2024220696762Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION28
05/19/2020220696762Open ↗
05/18/2020220696762Open ↗
08/03/2017240192876Open ↗
Showing 3 of 28 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
07/07/2015210037397Open ↗
07/07/2015210037397Open ↗
07/07/2015210034639Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications69
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
05/18/2020220696762Open ↗
04/15/2020220696762Open ↗
03/20/2018240192876Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026X00347076-I1Open ↗
08/25/2026X00261501-I1Open ↗
08/25/2026X00261501-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/07/2026X08040429-P1Open ↗
08/30/2026X08040429-I1Open ↗
08/30/2026X08040429-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/07/2026X08040429-P1Open ↗
09/07/2026X08040429-P1Open ↗
08/31/2026X00347076-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
01/29/2013220249960Open ↗
01/29/2013220249960Open ↗
01/29/2013220249960Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
07/11/2017220605548Open ↗
01/29/2013220249960Open ↗
09/09/2011220138599Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/03/2017240192876Open ↗
07/11/2017220605548Open ↗
10/28/2014240077867Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/03/2017240192876Open ↗
10/28/2014240077867Open ↗
04/24/2013240024157Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/03/2017240192876Open ↗
10/28/2014240077867Open ↗
04/24/2013240024157Open ↗
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/09/2011220138599Open ↗
▸BISSCHEDULE B - PLUMBING1
08/03/2017240192876Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/11/2017220605548Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes4
04/15/2020220696762Open ↗
07/11/2017220605548Open ↗
04/03/2017220453952Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan4
08/25/2026X00261501-P2Open ↗
08/13/2026X00261501-P1Open ↗
08/13/2026X00347076-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/11/2017220605548Open ↗
▸BISSTREET TREE CHECKLIST1
07/11/2017220605548Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
04/20/2020220696762Open ↗
04/15/2020220696762Open ↗
08/03/2017240192876Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/09/2011220138599Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01248808-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/16/2026X08040429-I1Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/18/2020220696762Open ↗
04/15/2020220696762Open ↗
03/20/2018240192876Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/20/2018240192876Open ↗
04/14/2016220116728Open ↗
11/23/2015220249960Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/02/2021220453952Open ↗
08/03/2017240192876Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/24/2024220696762Open ↗
11/02/2021220453952Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/05/2011220116728Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/24/2024220696762Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/03/2017240192876Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/24/2024220696762Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/02/2021220453952Open ↗
11/02/2021220453952Open ↗
11/02/2021220453952Open ↗
Showing 3 of 6 on file for this type
▸BISPOST-INSTALLED ANCHORS2
10/24/2024220696762Open ↗
10/24/2024220696762Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
10/24/2024220696762Open ↗
10/24/2024220696762Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/24/2024220696762Open ↗
▸BISMASONRY1
10/24/2024220696762Open ↗
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
10/28/2024220696762Open ↗
11/03/2021220453952Open ↗
03/20/2018240192876Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
01/29/2013220249960Open ↗
09/09/2011220138599Open ↗
Showing 2 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/20/2018240192876Open ↗
04/14/2016220116728Open ↗
04/24/2013220138599Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER3
01/08/2015220114347Open ↗
01/11/2013220114347Open ↗
04/04/2012220114347Open ↗
▸BISFINAL1
10/24/2024220696762Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X08040429-I1Open ↗
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT31
09/12/2024220696762Open ↗
04/20/2020220696762Open ↗
04/15/2020220696762Open ↗
Showing 3 of 31 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/24/2024220696762Open ↗
11/02/2021220453952Open ↗
▸Filing & Intake Forms26
▸BISADDITIONAL INFORMATION12
10/11/2024220696762Open ↗
05/05/2021220453952Open ↗
03/29/2016220116728Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET9
04/15/2020220696762Open ↗
07/11/2017220605548Open ↗
04/03/2017220453952Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/03/2017240192876Open ↗
10/28/2014240077867Open ↗
04/24/2013240024157Open ↗
▸BISBOROUGH INTAKE FORM2
05/18/2020220696762Open ↗
03/20/2018240192876Open ↗
▸Other Documents10
▸DOB NOWCalculations3
08/13/2026X00977668-P1Open ↗
08/13/2026X00977668-I1Open ↗
08/13/2026X00977668-P2Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026X00977668-P2Open ↗
08/13/2026X00977668-I1Open ↗
08/13/2026X00977668-P1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION2
10/28/2014240077867Open ↗
04/24/2013240024157Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/04/2012220114347Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01229810-I1Open ↗