← Back
BuildNYC
Elevator cooperative
Second Atlantic Terminal Housing Corporation
455 CARLTON AVENUE · Fort Greene · BIN 3321978
💬 Discuss this project
1974Year Built
15Stories
D4Building Class
R7-2Zoning
476,450 sfGross Floor Area
306Units
LL97 CoveredRent Stabilized388 Active Violations 372 unresolved · 16 paperwork only 3 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator cooperative · Owner of record: Second Atlantic Terminal Housing · 125,150 sf lot · 3.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsPrestige Management INC.Under Construction3 filings
RoofPrestige Management INC.Under Construction2p · 3 filings · 20 docs
Floor 1Prestige Management INC.Under Construction1p · 1 filing · 5 docs
CellarPrestige Management INC.Under Construction1p · 1 filing · 5 docs
Site & exteriorInstallation of heavy duty sidewalk shed1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Housing Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lawless & Mangione509/16/2026
Rimkus207/25/2025
Wavic Engineering105/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BG & Associates603/21/2026
Smep Design & Consultation203/21/2026
Kma Designs403/21/2026
Riggining Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold306/28/2026
Harley Plumbing & HeatingPlumbing207/08/2026
Metro Fire Protection HoldingFire Protection206/27/2026
C C Controlled CombustionGeneral Contractor104/09/2026
Structural Preserv SystemGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting1688609/16/2026
Socotec Engineering4983304/14/2026
Building Lifecycle
All (97)Filed (12)Permit Issued (13)Facade (FISP) (6)Violation (60)Objection (6)
09/16/2026
Filed — Alteration
Filing for Solar panel structural framing as per plans filed herewith. No change in use, occupancy or egress.
B01417350-P1
08/12/2026
Violation issued (HPD, open)
B
08/12/2026
Violation issued (HPD, open)
B
07/13/2026
Permit issued — Suspended Scaffold
B01406882-I1-SC
07/07/2026
Filed — Alteration
Filing for Solar panel structural framing as per plans filed herewith. No change in use, occupancy or egress.
B01417350-I1
07/01/2026
Permit issued — Suspended Scaffold
B01215097-I1-SC
06/30/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01406882-I1
06/24/2026
Permit issued — Standpipe
B01067868-I1-EW-SP
06/24/2026
Permit issued — Standpipe
B01067868-I1-EW-SD
06/22/2026
Permit issued — Sidewalk Shed
B01200727-I1-SH
04/22/2026
Permit issued — Plumbing
B01046560-I1-PL
04/14/2026
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Jaroslaw Jablonski
B01215097-P1
04/08/2026
Violation issued (FDNY_NOV, closed)
03/24/2026
Permit issued — Sidewalk Shed
B01200727-I1-SH
03/17/2026
Violation issued (FDNY_NOV, closed)
03/17/2026
Violation issued (FDNY_NOV, closed)
03/16/2026
Violation issued (HPD, open)
A
03/16/2026
Violation issued (HPD, open)
A
01/07/2026
Violation issued (HPD, open)
B
01/07/2026
Violation issued (HPD, open)
C
01/07/2026
Violation issued (HPD, open)
B
01/07/2026
Violation issued (HPD, open)
B
01/07/2026
Violation issued (HPD, closed)
A
01/06/2026
Permit issued — Mechanical Systems
B01046549-I1-MS
12/19/2025
Permit issued — Plumbing
B01046560-I1-PL
12/19/2025
Violation issued (HPD, closed)
C
12/19/2025
Violation issued (HPD, open)
C
12/19/2025
Violation issued (HPD, open)
B
12/19/2025
Violation issued (HPD, open)
A
12/19/2025
Violation issued (HPD, closed)
C
12/19/2025
Violation issued (HPD, open)
B
12/19/2025
Violation issued (HPD, open)
C
12/05/2025
Permit issued — General Construction
B01046542-I1-GC
11/28/2025
Violation issued (HPD, open)
C
11/28/2025
Violation issued (HPD, closed)
B
11/28/2025
Violation issued (HPD, open)
A
11/28/2025
Violation issued (HPD, open)
B
11/28/2025
Violation issued (HPD, open)
B
09/20/2025
Violation issued (HPD, open)
B
09/20/2025
Violation issued (HPD, open)
A
09/20/2025
Violation issued (HPD, open)
B
09/20/2025
Violation issued (HPD, closed)
A
09/20/2025
Violation issued (HPD, closed)
A
09/20/2025
Violation issued (HPD, open)
B
09/20/2025
Violation issued (HPD, open)
A
09/20/2025
Violation issued (HPD, open)
B
09/20/2025
Violation issued (FDNY_NOV, closed)
09/20/2025
Violation issued (HPD, open)
B
09/20/2025
Violation issued (FDNY_NOV, closed)
09/20/2025
Violation issued (HPD, closed)
B
09/20/2025
Violation issued (FDNY_NOV, closed)
07/25/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC
B01200727-P1
07/21/2025
Violation issued (HPD, open)
A
07/21/2025
Violation issued (HPD, open)
B
07/02/2025
Permit issued — Suspended Scaffold
B01215097-I1-SC
06/12/2025
Violation issued (HPD, closed)
A
05/22/2025
Filed — Alteration
Install fire sprinkler system as per plans. Replace existing fire pump with new fire pump.
B01067868-I1
04/30/2025
Permit issued — Suspended Scaffold
B01215097-I1-SC
04/25/2025
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Jaroslaw Jablonski
B01215097-I1
03/27/2025
Permit issued — Sidewalk Shed
B01200727-I1-SH
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System07/13/2026
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System07/01/2026
DOB NOWSprinklersPermit IssuedMetro Fire Protection Holding06/24/2026
DOB NOWStandpipePermit IssuedMetro Fire Protection Holding06/24/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY06/22/2026
DOB NOWPlumbingPermit IssuedHarley Plumbing & Heating04/22/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/24/2026
DOB NOWMechanical SystemsPermit IssuedC C Controlled Combustion01/06/2026
DOB NOWPlumbingPermit IssuedHarley Plumbing & Heating12/19/2025
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System12/05/2025
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System07/02/2025
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System04/30/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY03/27/2025
BISOTISSUEDFutura Builders Group06/30/2008
BISEQISSUEDMSS Construction06/03/2008
BISOTISSUEDAlpine Construction & Developmnt01/13/2004
BISOTISSUEDAlpine Construction & Developmnt10/02/2002
BISEQISSUEDAtlantic Scaffolding12/06/1996
1 project · most recent 05/22/2025
FiledStatusContractorScope
05/22/2025Permit IssuedMetro Fire Protection Holding1 heads, 1 outlets
3 projects · most recent 04/21/2026
General Wiring
FiledStatusContractorScope
04/21/2026Permit IssuedFirst Choice Electrical—
06/08/2025Permit IssuedRegional Electrical VoiceGeneral Wiring
04/15/2025Permit IssuedHigh Quality Electric of NYC—
1 project · most recent 09/16/2026
Steel
FiledStatusContractorScope
09/16/2026——Steel
1 project · most recent 07/25/2025
Sidewalk Shed
FiledStatusContractorScope
07/25/2025Permit IssuedKings Group NYSidewalk Shed
3 projects · most recent 06/30/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/30/2026Permit IssuedStructural Preservation System—
04/14/2026Permit IssuedStructural Preservation SystemSuspended Scaffold (SC)
12/10/2024——Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
09/15/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
09/15/2026Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2026Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2026Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
09/15/2026Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
07/01/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
07/01/2026Structural Steel - High Strength BoltingSEBASTIAN SETTEDUCATE JR., P.Especial
07/01/2026Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/01/2026Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
07/01/2026Structural Steel - WeldingSEBASTIAN SETTEDUCATE JR., P.Especial
06/15/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/15/2026Structural Steel - DetailsSEBASTIAN SETTEDUCATE JR., P.Especial
04/23/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
04/23/2026Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
04/13/2026Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
04/13/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
12/10/2024Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
12/10/2024Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
09/17/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/17/2024Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
06/30/2024Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
06/17/2024Standpipe SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/24/2026B01046542-I1Request digital key ↗
08/24/2026B01046560-I1Request digital key ↗
08/24/2026B01046560-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
06/30/2008310003439Open ↗
06/03/2008310147793Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/27/2008310147793Open ↗
▸Seals & Professional Certifications28
▸DOB NOWSpecial Inspector Seal & Signature10
10/05/2026B01417350-P1Open ↗
08/31/2026B01046560-I1Open ↗
08/28/2026B01215097-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026B01046560-P1Open ↗
08/23/2026B01046549-I1Open ↗
08/21/2026B01067868-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/27/2008310147793Open ↗
08/02/2007310003439Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/27/2008310147793Open ↗
08/02/2007310003439Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/06/2010310003439Open ↗
05/27/2008310147793Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
10/05/2026B01417350-P1Open ↗
08/25/2026B01417350-I1Open ↗
▸BISPC FULL REPORT1
08/02/2007310003439Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
08/02/2007310003439Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/27/2008310147793Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/02/2007310003439Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/24/2026B01046560-P1Open ↗
08/23/2026B01046549-I1Open ↗
08/21/2026B01215097-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/23/2026B01046549-I1Open ↗
08/21/2026B01067868-I1Open ↗
08/13/2026B01046560-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/15/2010310003439Open ↗
12/06/2010310003439Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/27/2008310147793Open ↗
08/02/2007310003439Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/06/2010310003439Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/15/2010310003439Open ↗
06/30/2008310003439Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/27/2008310147793Open ↗
▸Other Documents7
▸DOB NOWCalculations3
08/21/2026B01215097-P1Open ↗
08/13/2026B01145752-I1Open ↗
08/13/2026B01215097-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/21/2026B01215097-P1Open ↗
08/13/2026B01145752-I1Open ↗
08/13/2026B01215097-I1Open ↗
▸DOB NOWIRA Certification1
08/16/2026B01406882-I1Open ↗