Multi-story retail building (2+)
457 86 STREET
BROOKLYN · BIN 3153179
💬 Discuss this project
1915Year Built
3Stories
K2Building Class
C4-2AZoning
9,600 sfGross Floor Area
1Units
7 Open Violations ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: BIRTER REALTY INC · 4,000 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof4p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 311p · 6 filings · 20 docs
Floor 28p · 5 filings · 20 docs
Floor 16p · 3 filings · 20 docs
Cellar7p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACHS MANAGMENT4107/08/2026
PLATINUM SERVICES NY2007/08/2026
MJM CONTRACTING ASSOCIATES LLC1103/22/2026
MJM ASSOCIATES CONSTR503/22/2026
MFM ASSOCIATES CONSTR LLC103/22/2026
MJM ASSOCIATES CON STR LL103/22/2026
MJM ASSOCIATES CONSTRUCTION203/22/2026
LION 457 86TH STREET503/21/2026
LION 457403/21/2026
BIRTHER REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE501/23/2025
MJ ENGINEERING & DESIGN1312/15/2021
CUSTOM DESIGNING & ENGINEERING108/17/2021
TRICARICO ARCHITECTURE AND DESIGN108/10/2021
ASHRAF CORP908/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS1003/21/2026
SUPPORT BUILDINGS OF NEW YORK1103/21/2026
PEROTTO CONSULTING MANAGEMENT403/21/2026
JOANNA KARAGIANNIS203/21/2026
KD DESIGNS203/21/2026
SUPPORT BUILDINGS1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJM ASSOCIATES CONSTR LLCGeneral Contractor1407/08/2026
GO GREEN CONSTRUCTION.INCGeneral Contractor1007/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor707/08/2026
SIGNSTAR NYCScaffold307/08/2026
ACTIVE SIGNSScaffold207/08/2026
F.S. SITE CORPFire Protection107/08/2026
F.S. SITE CORPPlumbing107/08/2026
BERNARD ZYSCOVICHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJ ENGINEERING & DESIGN55461412/15/2021
MEP INSPECTIONS, INC1102208/17/2021
Building Lifecycle
All (133)Filed (29)Permit Issued (24)Signed Off (17)Violation (26)Inspection (7)Special Inspection (30)
08/19/2025
Violation issued (FDNY_ORDER, closed)
04/18/2025
Signed off — Alteration
B01157254-I1
04/18/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED D/F BLADE SIGN (FOOT LOCKER)
B01157216-I1
04/18/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FOOT LOCKER)
B01157262-I1
01/28/2025
Permit issued — Sign
B01157254-I1-SG
01/28/2025
Permit issued — Sign
B01157216-I1-SG
01/28/2025
Permit issued — Sign
B01157262-I1-SG
01/23/2025
Filed — Alteration
B01157254-I1
01/23/2025
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED D/F BLADE SIGN (FOOT LOCKER)
B01157216-I1
01/23/2025
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (FOOT LOCKER)
B01157262-I1
12/17/2024
Special inspection requirement — Final
LEON SKVIRSKY
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/07/2022
Signed off — Alteration
B00538573-I1
03/29/2022
Signed off — Alteration
B00597661-I1
03/29/2022
Signed off — Alteration
B00597629-I1
03/25/2022
Signed off — Alteration
B00434461-I1
02/08/2022
Signed off — Alteration
FILING FOR NEW PLUMBING FIXTURES, REPLACEMENT OF PLUMBING FIXTURES AND ALL REQUIRED SANITARY DRAINAGE, ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION
B00469881-I1
02/06/2022
Signed off — Alteration
PROVIDE NEW AUTOMATIC SPRINKLER SYSTEM, ASSOCIATED SPRINKLER PIPING AND SPRINKLER HEADS AS SHOWN ON PLANS. PROVIDE BOOSTER PUMP TO SUPPLY FIRE WATER TO SPRINKLERS.
B00478171-I1
01/13/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/03/2022
Signed off — Alteration
B00537528-I1
12/20/2021
Signed off — Alteration
INSTALLATION OF NEW HVAC SYSTEM AND RELATED DUCTWORK ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION
B00469907-I1
12/15/2021
Filed — Alteration
INSTALLATION OF NEW HVAC SYSTEM AND RELATED DUCTWORK ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION
B00469907-P2
12/15/2021
Special inspection requirement — Duct leakage testing, insulation and design
Magdy Youssef
12/15/2021
Special inspection requirement — Maintenance information
Magdy Youssef
12/15/2021
Special inspection requirement — Mechanical Systems
Magdy Youssef
12/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
12/15/2021
Special inspection requirement — Final
Magdy Youssef
12/15/2021
Special inspection requirement — Ventilation and air distribution system
Magdy Youssef
11/26/2021
Signed off — Alteration
8558OT - Filing for Tenant interior fit out for Footlocker Store. Exterior to be cleaned and painted. No change to egress use group or occupancy group. Professional certification requested.
B00537524-I1
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/23/2021
Signed off — Alteration
Structural Design for conversion and enlargement of existing commercial building, all as per plans filed herewith. No change to use egress or occupancy.
B00470135-I1
11/23/2021
Special inspection requirement — Duct leakage testing, insulation and design
Magdy Youssef
11/23/2021
Special inspection requirement — Ventilation and air distribution system
Magdy Youssef
11/23/2021
Special inspection requirement — Final
Magdy Youssef
11/23/2021
Special inspection requirement — Mechanical Systems
Magdy Youssef
11/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
11/23/2021
Special inspection requirement — Maintenance information
Magdy Youssef
11/19/2021
Permit issued — General Construction
B00537524-I1-GC
11/19/2021
Permit issued — General Construction
B00537528-I1-GC-CX
11/18/2021
Signed off — Alteration
B00470155-I1
11/18/2021
Signed off — Alteration
B00456576-I1
11/16/2021
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
11/12/2021
Permit issued — Sign
B00597629-I1-SG
11/12/2021
Permit issued — Sign
B00597661-I1-SG
11/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
11/10/2021
Filed — Alteration
FILING FOR NEW PLUMBING FIXTURES, REPLACEMENT OF PLUMBING FIXTURES AND ALL REQUIRED SANITARY DRAINAGE, ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION
B00469881-P2
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
11/05/2021
Filed — Alteration
B00597661-I1
11/05/2021
Filed — Alteration
B00597629-I1
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Magdy Youssef
10/27/2021
Special inspection requirement — Sprinkler Systems
Magdy Youssef
10/26/2021
Filed — Alteration
PROVIDE NEW AUTOMATIC SPRINKLER SYSTEM, ASSOCIATED SPRINKLER PIPING AND SPRINKLER HEADS AS SHOWN ON PLANS. PROVIDE BOOSTER PUMP TO SUPPLY FIRE WATER TO SPRINKLERS.
B00478171-P1
10/25/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING, ROOF PROTECTION AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OR OCCUPANCY,
B00481336-I1
10/25/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00443613-I1
10/19/2021
Permit issued — Mechanical Systems
B00537528-I1-GC-CX
10/19/2021
Permit issued — General Construction
B00537524-I1-GC
09/20/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Magdy Youssef
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSIGNSTAR NYC01/28/2025
DOB NOWSignSigned-offSIGNSTAR NYC01/28/2025
DOB NOWSignSigned-offSIGNSTAR NYC01/28/2025
DOB NOWGeneral ConstructionSigned-offGO GREEN CONSTRUCTION.INC11/19/2021
DOB NOWGeneral ConstructionSigned-offGO GREEN CONSTRUCTION.INC11/19/2021
DOB NOWSignSigned-offACTIVE SIGNS INC11/12/2021
DOB NOWSignSigned-offACTIVE SIGNS INC11/12/2021
DOB NOWMechanical SystemsSigned-offGO GREEN CONSTRUCTION.INC10/19/2021
DOB NOWGeneral ConstructionSigned-offGO GREEN CONSTRUCTION.INC10/19/2021
DOB NOWGeneral ConstructionSigned-offGO GREEN CONSTRUCTION.INC08/23/2021
DOB NOWGeneral ConstructionSigned-offGO GREEN CONSTRUCTION.INC08/19/2021
DOB NOWSprinklersSigned-offALAN J. BRUTOSKY PLBG CON06/07/2021
DOB NOWPlumbingSigned-offALAN J BRUTOSKY PLBR CONT05/12/2021
DOB NOWMechanical SystemsSigned-offMJM ASSOCIATES CONSTR LLC05/10/2021
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC04/21/2021
DOB NOWConstruction FenceSigned-offMJM ASSOCIATES CONSTR LLC03/18/2021
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC03/16/2021
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC03/16/2021
DOB NOWFoundationSigned-offMJM ASSOCIATES CONSTR LLC03/12/2021
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC02/25/2021
DOB NOWStructuralSigned-offMJM ASSOCIATES CONSTR LLC02/25/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC02/16/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC01/08/2021
DOB NOWConstruction FenceSigned-offMJM ASSOCIATES CONSTR LLC12/02/2020
BIS—ISSUEDMJM ASSOCIATES CONSTR LLC05/10/2022
BIS—ISSUEDMJM ASSOCIATES CONSTR LLC06/25/2021
BISOTISSUEDMJM ASSOCIATES CONSTR LLC03/17/2021
BISOTISSUEDMJM ASSOCIATES CONSTR LLC12/02/2020
BISOTISSUEDMJM ASSOCIATES CONSTR LLC11/24/2020
BISEQISSUEDAMERICAN GEN CONST02/01/2006
BISOTISSUEDAMERICAN GEN CONST02/01/2006
BIS—ISSUEDSUPER NEON LIGHTS, INC.02/25/1994
BISOTISSUEDHERITAGE CONSTR SERVICES CO INC10/21/1992
BISEQISSUEDHERITAGE CONSTR SERVICES CO INC10/21/1992
7 projects · most recent 01/03/2025
General Wiring
FiledStatusContractorScope
01/03/2025Permit IssuedRAINBOW ELECTRIC CO., INC—
01/03/2025Permit IssuedRAINBOW ELECTRIC CO., INC—
08/25/2022CompleteRAINBOW ELECTRIC CO., INC—
04/22/2022CompleteV-MAR ELECTRIC LTD.General Wiring
09/14/2021CompleteLEBO ELECTRIC LLCGeneral Wiring
06/25/2021CompleteJAM ELECTRICAL CORP—
12/21/2020CompleteILLUMINOUS ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/13/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/24/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2021Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/09/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
12/17/2024FinalLEON SKVIRSKYprogress
12/15/2021Duct leakage testing, insulation and designMagdy Youssefenergy_progress
12/15/2021Maintenance informationMagdy Youssefenergy_progress
12/15/2021Mechanical SystemsMagdy Youssefspecial
12/15/2021Fire-Resistant Penetrations and JointsMagdy Youssefspecial
12/15/2021FinalMagdy Youssefprogress
12/15/2021Ventilation and air distribution systemMagdy Youssefenergy_progress
11/23/2021Duct leakage testing, insulation and designMagdy Youssefenergy_progress
11/23/2021Ventilation and air distribution systemMagdy Youssefenergy_progress
11/23/2021FinalMagdy Youssefprogress
11/23/2021Mechanical SystemsMagdy Youssefspecial
11/23/2021Fire-Resistant Penetrations and JointsMagdy Youssefspecial
11/23/2021Maintenance informationMagdy Youssefenergy_progress
11/12/2021Fire-Resistant Penetrations and JointsMagdy Youssefspecial
11/09/2021Fire-Resistant Penetrations and JointsMagdy Youssefspecial
10/27/2021Fire-Resistant Penetrations and JointsMagdy Youssefspecial
10/27/2021Sprinkler SystemsMagdy Youssefspecial
09/20/2021Structural Steel - High Strength BoltingMagdy Youssefspecial
09/20/2021Structural Steel - WeldingMagdy Youssefspecial
09/20/2021Post-installed AnchorsMagdy Youssefspecial
09/20/2021Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
09/20/2021Structural Cold-Formed SteelMagdy Youssefspecial
09/20/2021Mastic and Intumescent Fire-resistant CoatingsMagdy Youssefspecial
09/20/2021Concrete - Cast-In-PlaceMagdy Youssefspecial
09/20/2021Structural Steel - DetailsMagdy Youssefspecial
Latest 25 of 46.
▾Documents — 238 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch13
09/01/2026B00478171-P1Request digital key ↗
09/01/2026B00478171-I1Request digital key ↗
09/01/2026B00481336-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/01/2026B00456576-I1Request digital key ↗
09/01/2026B00470135-I1Request digital key ↗
08/15/2026B00470135-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/02/2026B00443613-P2Request digital key ↗
09/02/2026B00443613-P3Request digital key ↗
09/02/2026B00443613-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00469881-I1Request digital key ↗
08/15/2026B00469881-P1Request digital key ↗
08/15/2026B00469881-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/01/2026B00469907-P1Request digital key ↗
09/01/2026B00469907-I1Request digital key ↗
08/15/2026B00469907-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00434461-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
09/01/2026B00470155-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION15
01/13/2023300199103Open ↗
01/13/2023300320301Open ↗
01/13/2023302075527Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION2
06/25/2021340785662Open ↗
11/24/2020340780916Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/01/2021340812311Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/10/2021340785662Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/24/2021340785662Open ↗
▸BISVERIFY TAX LOT1
05/02/2023340785662Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/08/2022340785662Open ↗
▸BISZONING DIAGRAM1
06/09/2021340785662Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/11/2021340785662Open ↗
▸Seals & Professional Certifications81
▸DOB NOWSpecial Inspector Seal & Signature30
08/29/2026B00470135-I1Open ↗
08/29/2026B00470135-I1Open ↗
08/29/2026B00470135-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/02/2026B00434461-I1Open ↗
09/02/2026B00443613-P1Open ↗
09/02/2026B00443613-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/05/2026B00481336-I1Open ↗
09/01/2026B01157216-I1Open ↗
08/29/2026B00470135-I1Open ↗
Showing 3 of 16 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/01/2021340812311Open ↗
11/25/2020340785662Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/01/2021340812311Open ↗
10/29/2020340780916Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/29/2020340780916Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/29/2020340780916Open ↗
▸Trade Schedules & Equipment4
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
04/25/2023340785662Open ↗
05/13/2022340785662Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/08/2022340785662Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
09/16/2021340785662Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan4
09/02/2026B00443613-P2Open ↗
09/02/2026B00443613-I1Open ↗
09/02/2026B00443613-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
07/01/2021340812311Open ↗
06/02/2021340785662Open ↗
▸BISSTREET TREE SIGNOFF1
05/13/2022340785662Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/01/2026B00456576-I1Open ↗
09/01/2026B00470155-I1Open ↗
09/01/2026B00470135-P2Open ↗
Showing 3 of 17 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/29/2020340780916Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/01/2021340812311Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/24/2020340780916Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
05/03/2023340785662Open ↗
05/03/2023340785662Open ↗
11/15/2021340785662Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/15/2021340780916Open ↗
09/21/2021340780916Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00537528-I1Open ↗
08/13/2026B00469907-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/13/2022340785662Open ↗
▸BISINTERIOR LIGHTING POWER1
05/13/2022340785662Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/13/2022340785662Open ↗
▸BISFENESTRATION AREAS1
05/13/2022340785662Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/13/2022340785662Open ↗
▸BISELECTRIC MOTORS1
05/13/2022340785662Open ↗
▸BISLIGHTING CONTROLS1
05/13/2022340785662Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/22/2021340785662Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/29/2020340780916Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
05/13/2022340785662Open ↗
▸BISEXTERIOR LIGHTING POWER1
05/13/2022340785662Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/13/2022340785662Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY7
11/15/2021340785662Open ↗
10/15/2021340780916Open ↗
10/15/2021340780916Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/13/2022340785662Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/13/2022340785662Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
05/13/2022340785662Open ↗
▸BISMASTIC AND INTUMESCENT FIRE-RESISTANT COATINGS1
05/13/2022340785662Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00470155-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00470155-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00470155-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
05/27/2021340785662Open ↗
05/24/2021340785662Open ↗
05/18/2021340785662Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/15/2021340780916Open ↗
▸BISFINAL1
11/24/2020340780916Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/07/2022340812311Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
04/26/2023340785662Open ↗
10/15/2021340780916Open ↗
09/21/2021340780916Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/15/2021340785662Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/22/2021340785662Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION10
04/27/2023340785662Open ↗
10/18/2021340785662Open ↗
10/18/2021340785662Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/01/2021340812311Open ↗
11/25/2020340785662Open ↗
10/29/2020340780916Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/01/2021340812311Open ↗
▸Other Documents6
▸BISSUSTAINABLE ROOF ZONE FORM1
11/25/2020340785662Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
06/02/2021340785662Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
05/13/2022340785662Open ↗
▸BISVESTIBULES1
05/13/2022340785662Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/01/2021340812311Open ↗
▸BISPLOT DIAGRAM1
06/02/2021340785662Open ↗