← Back
Elevator cooperative
East River
453 FDR DRIVE · BIN 1083400
💬 Discuss this project
1955Year Built
20Stories
D4Building Class
R7-2Zoning
923,000 sfGross Floor Area
837Units
LL97 CoveredRent Stabilized56 Open Violations 46 unresolved · 10 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: EAST RIVER HOUSING CORP · 212,250 sf lot · 4.35 FAR built · Flood zone VE
Locations of Work
ArchitecturePlumbingEquipmentOther
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 9 docs
Floor 142p · 1 filing · 6 docs
Floor 132 filings · 7 docs
Floor 12
Floor 11
Floor 101p · 2 filings · 8 docs
Floor 9Under Construction5p · 2 filings · 20 docs
Floor 81p · 2 filings · 9 docs
Floor 7
Floor 6Under Construction8p · 2 filings · 20 docs
Floor 5
Floor 42p · 1 filing · 4 docs
Floor 3
Floor 2
Floor 18p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST RIVER HOUSING CP32309/18/2026
COOPERATIVE VILLAGE MANAGEMENT5407/08/2026
XINOS CONSTRUCTION2603/22/2026
E RIVER HOUSING CORP C/O103/22/2026
EAST RIVER HOUSING COR103/22/2026
CHARTER COMMUNICATIONS103/22/2026
HILLMAN HOUSING1303/21/2026
COOPERATIVE VILLAGE103/21/2026
EAST RIVER HOUSING CORP530103/21/2026
EASTRIVRE HOUSING CORO203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A K EXPEDITING803/21/2026
CLARKE CONSTRUCTION CONSULTANTS803/21/2026
GREGORY COLSTON ARCHITECT503/21/2026
HIGH QUALITY 338403/21/2026
ECDESIGN STUDIO803/21/2026
BG & ASSOCIATES603/21/2026
J. CALLAHAN CONSULTING, INC.403/21/2026
RICHARD SWANSON303/21/2026
XINOS CONSTRUCTION403/21/2026
NODE ARCH ENGIN CONSULT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor1304/09/2026
LOWER EAST SIDE CONST INCGeneral Contractor907/08/2026
GENCO LEE RENOVATION INCGeneral Contractor603/21/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor403/21/2026
HONOR CONSTRUCTION INCGeneral Contractor407/08/2026
CARA PLUMBING GROUP INCPlumbing407/08/2026
TRISTAR PLUMBING & HTG INPlumbing307/08/2026
DOLPHIN CONSTRUCTION MANAGeneral Contractor303/21/2026
VOLVIE HERMAN CONTRG CORPElectrical303/22/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
GERMINIANO MENDES CORPGeneral Contractor307/08/2026
IVAN PAVICICElectrical203/21/2026
RUIZ RAVE, YEISONElectrical203/21/2026
TRISTAR PLBG & HTG INCPlumbing207/08/2026
ARANDA PLBG & HTG CORPPlumbing209/18/2026
ROBERT COVELLOElectrical203/21/2026
ARK DESIGN & BUILD INCGeneral Contractor207/08/2026
ZARETSKY, MIKHAILElectrical203/21/2026
RAY-AN ESTATES INCGeneral Contractor203/21/2026
RJ BRUNO INCPlumbing207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
VOLTRON ELECTRIC LLCElectrical103/22/2026
K-WATTS ELECTRIC LLCElectrical103/22/2026
GALICJA PLBG HTGGeneral Contractor103/21/2026
SCHORR, NATHANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004106/30/2025
SPECIAL TESTING & CONSULT1688111/21/2024
HUAN DESIGN INC7669312/14/2023
J&R DESIGN AND INSPECTION6637308/04/2023
TRIANGLE INSPECTION & TES7495112/20/2022
A. GIANNOPOULOS ARCHITECT2196112/20/2022
DY SPECIAL INSPECTION LLC7210210/15/2021
O'ROURKE ENGINEERING, LLC5873107/15/2021
ANJIE CHO ARCHITECT3954305/12/2021
NODE ARCHITECTURE,ENGINEE6799103/09/2021
Building Lifecycle
All (300)Filed (70)Permit Issued (59)Signed Off (24)Facade (FISP) (11)Violation (44)Inspection (38)Objection (54)
09/17/2026
Permit issued — Plumbing
M01072146-S1-PL
06/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2026
Signed off — Alteration
Filing for minor plumbing fixture work as per plans filed. No change of use, egress of occupancy.
M01240929-I1
05/19/2026
Permit issued — General Construction
M01072146-I1-GC
05/07/2026
Violation issued (HPD, open)
A
04/17/2026
Permit issued — General Construction
M01072146-I1-GC
03/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Signed off — Alteration
Filing for Roof recovery and parapet repairs as per plans filed herewith. No change in use, occupancy or egress.
M01064718-I1
03/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/17/2026
Permit issued — Plumbing
M01142124-S1-PL
03/07/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01230364-I1
02/25/2026
Signed off — Alteration
INTERIOR PLUMBING WORK ON APARTMENT C-103 AND C-104 TO COMBINE APARTMENTS AS PER TPPN 3/ 97 AS INDICATED ON PLANS. CAP AND REMOVE KITCHEN PLUMBING FIXTURES AND PIPING ON ON APART C-103. RENOVATE BATHROOM. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01287707-I1
02/18/2026
Violation issued (HPD, open)
A
02/18/2026
Violation issued (HPD, open)
C
02/18/2026
Violation issued (HPD, open)
C
01/14/2026
Permit issued — General Construction
M01072146-I1-GC
01/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/23/2025
Filed — Alteration
PLUMBING WORK TO INCLUDE GAS RANGE REMOVAL, GAS RANGE REPLACEMENT, RELOCATION OF 1 KITCHEN SINK, RELOCATION OF TOILET, REPLACEMENT OF 2 TUBS, 2 LAVS, 1 KITCHEN SINK 1 TOILET, AND ADDITION OF 1 TOILET, 1 LAV, 1 SHOWER, AND DISHWASHER.
M01072146-P1
12/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/04/2025
Permit issued — General Construction
M01287721-I1-GC
12/04/2025
Permit issued — Plumbing
M01287721-S1-PL
11/17/2025
Violation issued (HPD, closed)
I
11/13/2025
Permit issued — Plumbing
M01287707-S1-PL
11/12/2025
Permit issued — General Construction
M01287707-I1-GC
11/10/2025
Objection resolved — Addressed
10/27/2025
Objection resolved — Addressed
10/24/2025
Objection raised — Cost
10/24/2025
Objection raised — Cost
10/06/2025
Filed — Alteration
INTERIOR PLUMBING WORK ON APARTMENT C-103 AND C-104 TO COMBINE APARTMENTS AS PER TPPN 3/ 97 AS INDICATED ON PLANS. CAP AND REMOVE KITCHEN PLUMBING FIXTURES AND PIPING ON ON APART C-103. RENOVATE BATHROOM. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01287707-I1
10/06/2025
Filed — Alteration
Minor plumbing work no change in use egress or occupancy
M01287721-S1
10/06/2025
Filed — Alteration
Minor plumbing work no change in use egress or occupancy
M01287721-I1
10/06/2025
Filed — Alteration
INTERIOR PLUMBING WORK ON APARTMENT C-103 AND C-104 TO COMBINE APARTMENTS AS PER TPPN 3/ 97 AS INDICATED ON PLANS. CAP AND REMOVE KITCHEN PLUMBING FIXTURES AND PIPING ON ON APART C-103. RENOVATE BATHROOM. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01287707-S1
10/03/2025
Permit issued — General Construction
M01072146-I1-GC
10/01/2025
Filed — Alteration
PLUMBING FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01142124-P1
09/08/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/31/2025
Permit issued — General Construction
M01240929-I1-GC
07/21/2025
Permit issued — General Construction
M01064718-I1-GC
07/21/2025
Objection raised — Admin
07/21/2025
Objection raised — Cost
07/18/2025
Permit issued — Suspended Scaffold
M01257081-I1-SC
07/16/2025
Filed — Alteration
HOIST INSTALLATION FOR ROOF REPAIRS, NO CHANGE IN USE,EGRESS, OR OCCUPANCY.
M01257081-I1
06/30/2025
Filed — Alteration
Filing for minor plumbing fixture work as per plans filed. No change of use, egress of occupancy.
M01240929-I1
06/30/2025
Filed — Alteration
Filing for minor plumbing fixture work as per plans filed. No change of use, egress of occupancy.
M01240929-S1
06/12/2025
Violation issued (HPD, open)
A
05/23/2025
Permit issued — Sidewalk Shed
M01230364-I1-SH
05/22/2025
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01230364-I1
05/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2025
Permit issued — Plumbing
M01072146-S1-PL
03/10/2025
Violation issued (ECB, closed)
Construction
03/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2025
Permit issued — General Construction
M01072146-I1-GC
02/21/2025
Permit issued — Plumbing
M01153652-S1-PL
02/14/2025
Permit issued — General Construction
M01153652-I1-GC
01/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP09/17/2026
DOB NOWGeneral ConstructionPermit IssuedARK DESIGN & BUILD INC05/19/2026
DOB NOWGeneral ConstructionPermit IssuedGERMINIANO MENDES CORP04/17/2026
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY03/17/2026
DOB NOWGeneral ConstructionPermit IssuedGERMINIANO MENDES01/14/2026
DOB NOWGeneral ConstructionPermit IssuedJD WINDOW CLEA & CONST CO12/04/2025
DOB NOWPlumbingSigned-offRJ BRUNO INC12/04/2025
DOB NOWPlumbingSigned-offRJ BRUNO INC11/13/2025
DOB NOWGeneral ConstructionSigned-offJD WINDOW CLEA & CONST CO11/12/2025
DOB NOWGeneral ConstructionPermit IssuedGERMINIANO MENDES10/03/2025
DOB NOWGeneral ConstructionSigned-offIBM CONSTRUCTION07/31/2025
DOB NOWGeneral ConstructionSigned-offXINOS CONSTRUCTION CORP07/21/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP07/18/2025
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP05/23/2025
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP03/17/2025
DOB NOWGeneral ConstructionPermit IssuedCGR SYSTEMS MANAGEMENT02/24/2025
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY02/21/2025
DOB NOWGeneral ConstructionPermit IssuedGENCO LEE RENOVATION INC02/14/2025
DOB NOWPlumbingPermit IssuedPRIME PLMBG & HTG OF NY12/24/2024
DOB NOWGeneral ConstructionPermit IssuedSOLOMON CONTRACTING INC12/13/2024
DOB NOWPlumbingSigned-offTRISTAR PLUMBING & HTG IN02/05/2024
DOB NOWGeneral ConstructionSigned-offJD WINDOW CLEA & CONST CO01/24/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/24/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC10/23/2023
DOB NOWGeneral ConstructionSigned-offARK DESIGN & BUILD INC10/06/2023
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.09/21/2023
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION09/20/2023
DOB NOWGeneral ConstructionPermit IssuedJD WINDOW CLEA & CONST CO08/14/2023
DOB NOWPlumbingSigned-offTRISTAR PLBG & HTG INC05/18/2023
DOB NOWGeneral ConstructionSigned-offDOLPHIN CONSTRUCTION MANA05/11/2023
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY02/09/2023
DOB NOWGeneral ConstructionPermit IssuedGENCO LEE RENOVATION INC01/27/2023
DOB NOWGeneral ConstructionSigned-offHONOR CONSTRUCTION INC01/23/2023
DOB NOWGeneral ConstructionPermit IssuedRAY-AN ESTATES INC01/13/2023
DOB NOWGeneral ConstructionSigned-offA.S.P. FOR HIRE INC10/12/2022
DOB NOWPlumbingSigned-offRRP PLUMBING CORP09/12/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG08/26/2022
DOB NOWGeneral ConstructionSigned-offHONOR CONSTRUCTION INC08/19/2022
DOB NOWGeneral ConstructionSigned-offJD WINDOW CLEA & CONST CO08/03/2022
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP07/05/2022
+ 60 more permits on file
1 project · most recent 07/15/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/15/2021——Air Conditioning Systems
Cooling
Daikin RMXS48LVJU 3,740 CFM · Heat Pump Outdoor ×1
11 projects · most recent 12/23/2025
Water/Sanitary Gas
FiledStatusContractorScope
12/23/2025Signed-offARANDA PLBG & HTG CORPGas, Water/Sanitary
10/06/2025Signed-offRJ BRUNO INCGas, Water/Sanitary
10/06/2025Signed-offRJ BRUNO INCWater/Sanitary
10/01/2025Permit IssuedCARA PLUMBING GROUP INCGas, Water/Sanitary
06/30/2025——Gas, Water/Sanitary
01/09/2025Signed-offTRISTAR PLBG & HTG INCGas, Water/Sanitary
01/06/2025Signed-offCARA PLUMBING GROUP INCGas, Water/Sanitary
08/04/2023Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
09/23/2022——Water/Sanitary
07/12/2021Permit IssuedTRISTAR PLUMBING & HTG INGas, Water/Sanitary
01/02/2020Permit IssuedAAA TOTAL PLUMBING, INCWater/Sanitary
25 projects · most recent 12/03/2025
General Wiring
FiledStatusContractorScope
12/03/2025Permit IssuedCAPO ELECTRIC LLCGeneral Wiring
12/01/2025CompleteCAPO ELECTRIC LLCGeneral Wiring
06/13/2025CompleteAMP POWER ELECTRIC SERVGeneral Wiring
05/29/2025Permit IssuedTOWER ELECTRIC INC.—
03/16/2025Permit IssuedSUPREME ELECTRIC CORPGeneral Wiring
03/01/2025CompleteAMP POWER ELECTRIC SERVGeneral Wiring
02/27/2025CompleteK-WATTS ELECTRIC LLCGeneral Wiring
01/22/2025Permit IssuedTOP NOTCH ELECTRIC INCGeneral Wiring
11/14/2024CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
01/30/2024CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
01/25/2024CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
01/21/2024CompleteEVS ELECTRIC CORPGeneral Wiring
11/03/2023CompleteEMPIRE LIC ELECL CONTRS—
05/26/2023CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
01/31/2023CompleteERIC & NG ELEC'L, INC.General Wiring
1 project · most recent 03/09/2021
Scaffold
FiledStatusContractorScope
03/09/2021——Scaffold
1 project · most recent 10/06/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/06/2025Signed-offRJ BRUNO INCTenant Protection Plan 72 Hour
1 project · most recent 07/16/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/16/2025Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 38
DateTypeResultReport
06/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
08/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 38.
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
09/15/2025FinalAltagracia Martinezprogress
09/15/2025FinalAltagracia Martinezprogress
01/06/2025Energy Code Compliance InspectionsRonald Nemecprogress
01/06/2025Fire-Resistance Rated ConstructionRonald Nemecprogress
01/06/2025Lighting in dwelling unitsRonald Nemecenergy_progress
12/10/2024FinalRonald Nemecprogress
11/13/2024FinalRonald Nemecprogress
11/13/2024Lighting in dwelling unitsRonald Nemecenergy_progress
11/13/2024Fire-Resistance Rated ConstructionRonald Nemecprogress
11/13/2024Energy Code Compliance InspectionsRonald Nemecprogress
11/04/2024Tenant Protection Plan ComplianceZHENHUAN XUspecial
11/04/2024FinalZHENHUAN XUprogress
10/30/2024Tenant Protection Plan Compliance—special
07/16/2024Air barrier - visual inspectionKenneth Santellienergy_progress
07/15/2024Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/15/2024MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
07/15/2024Energy Code Compliance InspectionsKenneth Santelliprogress
07/15/2024Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
07/15/2024Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
06/25/2024FinalGREGORY COLSTONprogress
06/11/2024FinalKenneth Santelliprogress
12/13/2023High Temperature Hot Water Piping (Welding)ZHENHUAN XUspecial
12/13/2023Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
12/13/2023Tenant Protection Plan Compliance—special
11/15/2023FinalZHENHUAN XUprogress
Latest 25 of 78.
▾Documents — 1,672 on file (BIS + DOB NOW)
▸Plans & Drawings72
▸DOB NOWPlans/Sketch55
09/04/2026M00477188-I1Request digital key ↗
09/04/2026M00482277-I1Request digital key ↗
09/03/2026M00495543-I1Request digital key ↗
Showing 3 of 55 on file for this type
▸DOB NOWPlans/Sketch - Plumbing13
09/05/2026M00283126-I1Request digital key ↗
09/04/2026M00349946-I1Request digital key ↗
09/04/2026M00370001-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00448130-I1Request digital key ↗
09/03/2026M00469939-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00477188-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00477188-I1Request digital key ↗
▸Applications & Permits282
▸BISWORK PERMIT APPLICATION157
03/07/2024121668329Open ↗
11/14/2023102463282Open ↗
09/13/2021123888141Open ↗
Showing 3 of 157 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION125
09/17/2025123355190Open ↗
08/08/2025123122478Open ↗
08/08/2025123133395Open ↗
Showing 3 of 125 on file for this type
▸Seals & Professional Certifications374
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION147
12/26/2019123888141Open ↗
Showing 1 of 147 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature68
09/04/2026M00349946-I1Open ↗
09/04/2026M00349946-P1Open ↗
09/04/2026M00370001-I1Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWProgress Inspector Seal & Signature51
09/23/2026M00460766-I1Open ↗
09/23/2026M00527201-I1Open ↗
09/23/2026M00527201-I1Open ↗
Showing 3 of 51 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT31
05/06/2021141002064Open ↗
08/19/2020140941550Open ↗
07/10/2020140911191Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026M00527201-I1Open ↗
08/31/2026M00527201-P1Open ↗
08/28/2026M00482277-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
05/06/2021141002064Open ↗
01/22/2021140996572Open ↗
10/20/2020140967372Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
05/06/2021141002064Open ↗
08/19/2020140941550Open ↗
07/10/2020140911191Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
01/22/2021140996572Open ↗
10/20/2020140967372Open ↗
09/29/2020140924864Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment118
▸BISSELF-CERT PLUMBING NOTICE46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISSCHEDULE B - PLUMBING33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸Safety & Tenant Protection40
▸BISTenant Protection Plan and Notes30
09/29/2020140924864Open ↗
01/08/2021140941550Open ↗
07/10/2020140911191Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWTenant Protection Plan8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN2
05/04/2021140996572Open ↗
12/10/2020140967372Open ↗
▸Environmental & Asbestos161
▸BISASBESTOS: CERTIFICATION (DEP ACP5)66
01/22/2021140996572Open ↗
10/20/2020140967372Open ↗
09/29/2020140924864Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report60
09/04/2026M00349946-I1Open ↗
09/04/2026M00349946-P1Open ↗
09/04/2026M00370001-I1Open ↗
Showing 3 of 60 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00460766-I1Open ↗
Showing 1 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance157
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS81
12/26/2019123888141Open ↗
Showing 1 of 81 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS28
05/03/2023140967372Open ↗
02/15/2022123438832Open ↗
11/17/2021140924864Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY23
09/03/2025123355190Open ↗
09/03/2025123355190Open ↗
09/03/2025123355190Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
09/03/2025123355190Open ↗
07/31/2025123122478Open ↗
07/31/2025123133395Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
01/22/2021140996572Open ↗
10/20/2020140967372Open ↗
08/19/2020140941550Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
07/31/2025123122478Open ↗
07/31/2025123133395Open ↗
03/20/2024121668329Open ↗
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
06/17/2021140967372Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/28/2020140902566Open ↗
▸Inspections & Test Reports41
▸BISTECHNICAL REPORT: RESPONSIBILITY35
09/19/2025123355190Open ↗
09/17/2025123355190Open ↗
09/03/2025123355190Open ↗
Showing 3 of 35 on file for this type
▸BISPOST-INSTALLED ANCHORS1
06/16/2021140967372Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/28/2020140902566Open ↗
▸BISMASONRY1
06/02/2021140967372Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
12/05/2023102463282Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
06/02/2021140967372Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs103
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST50
09/19/2025123355190Open ↗
08/08/2025123122478Open ↗
08/08/2025123133395Open ↗
Showing 3 of 50 on file for this type
▸BISADMINISTRATIVE OBJECTIONS33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISFINAL4
07/31/2025123122478Open ↗
07/31/2025123133395Open ↗
03/20/2024121668329Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER3
03/07/2024121668329Open ↗
11/14/2023102463282Open ↗
Showing 2 of 3 on file for this type
▸BISIntent to Rescind Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership167
▸BISCOST AFFIDAVIT134
05/03/2023140967372Open ↗
02/15/2022123438832Open ↗
11/17/2021140924864Open ↗
Showing 3 of 134 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT26
12/28/2020140902566Open ↗
Showing 1 of 26 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
09/03/2025123355190Open ↗
08/02/2025123122478Open ↗
08/02/2025123133395Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms141
▸BISEFILING COVER SHEET80
12/26/2019123888141Open ↗
Showing 1 of 80 on file for this type
▸BISADDITIONAL INFORMATION29
02/08/2021140996572Open ↗
01/08/2021140941550Open ↗
01/05/2021140924864Open ↗
Showing 3 of 29 on file for this type
▸BISBOROUGH INTAKE FORM21
03/07/2024121668329Open ↗
Showing 1 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
05/06/2021141002064Open ↗
01/22/2021140996572Open ↗
10/20/2020140967372Open ↗
Showing 3 of 11 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
06/14/2021140996572Open ↗
06/14/2021140996572Open ↗
01/08/2021140941550Open ↗
Showing 3 of 6 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type