← Back
BuildNYC
Parks / recreation facility
Flushing Meadows Corona Park
46-01 111TH STREET · BIN 4615694
💬 Discuss this project
1939Year Built
—Stories
Q1Building Class
PARKZoning
1,258,350 sfGross Floor Area
1Units
LL97 Covered23 Active Violations 3 unresolved · 20 paperwork only ▸FDNY Report ↗
Parks / recreation facility · Owner of record: NYC Department of Parks and Recreation · 17,870,000 sf lot · 0.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew York Hall of Science97p · 5 filings · 13 docs
Floor 3New York Hall of Science110p · 6 filings · 13 docs
Floor 2New York Hall of Science111p · 6 filings · 13 docs
Floor 1New York Hall of Science113p · 6 filings · 13 docs
Site & exteriorPublic School 369-q, New York Hall of Science13p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority6607/08/2026
SLS, Co103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JMG Consultants601/18/2023
Loring Consulting Engineers606/27/2022
Sean P. Cunningham PE405/17/2022
AKRF304/04/2022
Thornton Tomasetti207/29/2021
Tarek M. Zeid, PE105/14/2020
Macan Deve Engineers110/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMG Consultants1203/21/2026
High Point Piping Protection803/21/2026
JMV Associates2403/21/2026
Tarek M. Zeid, P.E103/21/2026
Tarek M Zeid P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Navillus TileGeneral Contractor1107/08/2026
R.A.M.S. Mechanicalspecialty_contractor807/08/2026
Current Fire ProtectionFire Protection807/08/2026
Navillus TileScaffold407/08/2026
Orbit Plumbing & HeatingPlumbing303/22/2026
Eagle 1 MechanicalPlumbing307/08/2026
Tru-Val ElectricElectrical203/22/2026
Michael SzerbatyElectrical103/21/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4001901/18/2023
Building Lifecycle
All (132)Filed (23)Permit Issued (26)Signed Off (9)Violation (5)Inspection (13)Objection (26)Special Inspection (30)
09/25/2025
Violation issued (ECB, closed)
Construction
03/14/2025
Violation issued (FDNY_NOV, closed)
04/15/2024
Signed off — Alteration
PROPOSED STRUCTURAL WORK FOR PROPOSED NEW SCHOOL BUILDING PRE-K CENTER AT NEW YORK HALL OF SCIENCE -DOB # 421737044.
Q00211858-I1
04/02/2024
Signed off — Alteration
Q00226553-I1
03/27/2024
Signed off — Alteration
FILING FOR SEISMIC DESIGN FOR ELECTRICAL TRADE INSTALLATIONS. JOB IN CONJUNCTION WITH NEW BUILDING DOB # 421737044.
Q00609110-I1
03/27/2024
Signed off — Alteration
FILING FOR SEISMIC BRACING DESIGN FOR MECHANICAL TRADE. @PRE-K CENTER AT NEW YORK HALL OF SCIENCE JOB IN CONJUNCTION WITH NEW BUILDING DOB # 421737044
Q00608455-I1
03/26/2024
Signed off — Alteration
PROPOSED MECHANICAL WORK FOR NEW SCHOOL BUILDING PRE-K CENTER AT NEW YORK HALL OF SCIENCE.
Q00212412-I1
06/30/2023
Violation issued (FDNY_NOV, closed)
06/01/2023
Signed off — Alteration
PROPOSED PLUMBING, STANDPIPE AND SPRINKLER WORK FOR NEW SCHOOL BUILDING PRE-K CENTER AT THE NEW YORK HALL OF SCIENCE - DOB # 421737044.
Q00212371-I1
04/30/2023
Violation issued (FDNY_NOV, closed)
04/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/18/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/13/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/13/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/11/2023
Permit issued — Standpipe
Q00212371-I1-EW-SP
04/10/2023
Permit issued — Standpipe
Q00212371-I1-EW-SD
03/07/2023
Permit issued — Mechanical Systems
Q00226553-I1-MS
03/02/2023
Violation issued (FDNY_NOV, closed)
01/20/2023
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
01/20/2023
Special inspection requirement — Final
NELSON LOPEZ
01/20/2023
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
01/18/2023
Filed — Alteration
FILING FOR SEISMIC BRACING DESIGN FOR MECHANICAL TRADE. @PRE-K CENTER AT NEW YORK HALL OF SCIENCE JOB IN CONJUNCTION WITH NEW BUILDING DOB # 421737044
Q00608455-P2
12/29/2022
Signed off — Alteration
PROPOSED SITE PLUMBING FOR CIVIL WORK FILED UNDER NEW SCHOOL BUILDING PRE-K CENTER AT NEW YORK HALL OF SCIENCE - DOB # 421737044.
Q00212434-I1
12/06/2022
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEM
Q00491145-I1
10/19/2022
Signed off — Alteration
Q00348436-I1
08/16/2022
Special inspection requirement — Final
NELSON LOPEZ
08/16/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
08/16/2022
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
08/15/2022
Filed — Alteration
FILING FOR SEISMIC DESIGN FOR ELECTRICAL TRADE INSTALLATIONS. JOB IN CONJUNCTION WITH NEW BUILDING DOB # 421737044.
Q00609110-P2
08/12/2022
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
08/12/2022
Special inspection requirement — Final
NELSON LOPEZ
08/12/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
06/28/2022
Special inspection requirement — HVAC insulation and sealing
NELSON LOPEZ
06/28/2022
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
06/28/2022
Special inspection requirement — HVAC and service water heating equipment
NELSON LOPEZ
06/28/2022
Special inspection requirement — Final
NELSON LOPEZ
06/28/2022
Special inspection requirement — HVAC and service water heating system controls
NELSON LOPEZ
06/28/2022
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
06/27/2022
Filed — Alteration
PROPOSED MECHANICAL WORK FOR NEW SCHOOL BUILDING PRE-K CENTER AT NEW YORK HALL OF SCIENCE.
Q00212412-P2
06/14/2022
Special inspection requirement — HVAC and service water heating system controls
NELSON LOPEZ
06/14/2022
Special inspection requirement — HVAC and service water heating equipment
NELSON LOPEZ
06/14/2022
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
06/14/2022
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
06/14/2022
Special inspection requirement — Final
NELSON LOPEZ
06/14/2022
Special inspection requirement — HVAC insulation and sealing
NELSON LOPEZ
06/08/2022
Permit issued — Structural
Q00211858-I1-ST
05/23/2022
Special inspection requirement — Standpipe Systems
NELSON LOPEZ
05/23/2022
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
05/23/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
05/19/2022
Permit issued — General Construction
Q00608455-I1-GC
05/18/2022
Permit issued — Construction Fence
Q00348436-I1-FN
05/18/2022
Permit issued — General Construction
Q00609110-I1-GC
05/17/2022
Filed — Alteration
INSTALLATION OF NEW SPRINKLER AND STANDPIPE SYSTEM
Q00491145-P3
05/12/2022
Permit issued — Standpipe
Q00491145-I1-EW-SD
05/11/2022
Permit issued — Sprinklers
Q00491145-I1-EW-SP
05/11/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
05/11/2022
Special inspection requirement — Sprinkler Systems
NELSON LOPEZ
05/11/2022
Special inspection requirement — Standpipe Systems
NELSON LOPEZ
04/21/2022
Permit issued — Standpipe
Q00212371-I1-PL
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCurrent Fire Protection I04/11/2023
DOB NOWStandpipeSigned-offCurrent Fire Protection I04/10/2023
DOB NOWMechanical SystemsSigned-offR.A.M.S. Mechanical03/07/2023
DOB NOWStructuralSigned-offNavillus Tile06/08/2022
DOB NOWGeneral ConstructionSigned-offNavillus Tile05/19/2022
DOB NOWConstruction FenceSigned-offNavillus Tile05/18/2022
DOB NOWGeneral ConstructionSigned-offNavillus Tile05/18/2022
DOB NOWStandpipeSigned-offCurrent Fire Protection I05/12/2022
DOB NOWSprinklersSigned-offCurrent Fire Protection I05/11/2022
DOB NOWPlumbingSigned-offEagle 1 Mechanical04/21/2022
DOB NOWConstruction FenceSigned-offNavillus Tile04/07/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. Mechanical03/29/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. Mechanical03/29/2022
DOB NOWMechanical SystemsSigned-offR.A.M.S. Mechanical02/16/2022
DOB NOWPlumbingSigned-offEagle 1 Mechanical11/26/2021
DOB NOWGeneral ConstructionSigned-offNavillus Tile11/17/2021
DOB NOWGeneral ConstructionSigned-offNavillus Tile11/15/2021
DOB NOWStructuralSigned-offNavillus Tile10/06/2021
DOB NOWMechanical SystemsSigned-offR.A.M.S. Mechanical07/09/2021
DOB NOWSprinklersSigned-offCurrent Fire Protection I06/17/2021
DOB NOWStandpipeSigned-offCurrent Fire Protection I06/17/2021
DOB NOWPlumbingSigned-offEagle 1 Mechanical05/21/2021
DOB NOWStandpipeSigned-offCurrent Fire Protection I04/07/2021
DOB NOWSprinklersSigned-offCurrent Fire Protection I04/02/2021
DOB NOWConstruction FenceSigned-offNavillus Tile01/28/2021
DOB NOWConstruction FenceSigned-offNavillus Tile05/28/2020
BISOTISSUEDNavillus Tile05/17/2022
BIS—ISSUEDNavillus Tile05/17/2022
BIS—ISSUEDNavillus Tile12/03/2021
BISOTISSUEDNavillus Tile12/03/2021
BIS—ISSUEDNavillus Tile12/03/2021
BISOTISSUEDNavillus Tile07/08/2021
BIS—ISSUEDNavillus Tile05/03/2021
BISOTISSUEDNavillus Tile02/09/2021
BIS—ISSUEDNavillus Tile01/28/2021
BIS—ISSUEDNavillus Tile12/04/2020
BIS—ISSUEDNavillus Tile11/27/2020
BIS—ISSUEDNavillus Tile11/27/2020
5 projects · most recent 11/01/2022
General Wiring
FiledStatusContractorScope
11/01/2022CompleteTru-Val ElectricGeneral Wiring
11/12/2021CompleteNycom Electrical—
07/28/2021CompleteTru-Val Electric1 meters, 1 new_meters
07/21/2021CancelledTru-Val Electric1 meters, 1 new_meters
04/04/2020CompleteAgir Electrical Ltd D/B/A—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/18/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/13/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/13/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/01/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/11/2022Certified Storm Drainage-ST-Piping-Water TestCertifiedView ↗
03/08/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/12/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/17/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
01/20/2023Seismic Isolation SystemsNELSON LOPEZspecial
01/20/2023FinalNELSON LOPEZprogress
01/20/2023Post-installed AnchorsNELSON LOPEZspecial
08/16/2022FinalNELSON LOPEZprogress
08/16/2022Seismic Isolation SystemsNELSON LOPEZspecial
08/16/2022Post-installed AnchorsNELSON LOPEZspecial
08/12/2022Seismic Isolation SystemsNELSON LOPEZspecial
08/12/2022FinalNELSON LOPEZprogress
08/12/2022Post-installed AnchorsNELSON LOPEZspecial
06/28/2022HVAC and service water heating system controls NELSON LOPEZenergy_progress
06/28/2022HVAC and service water heating equipment NELSON LOPEZenergy_progress
06/28/2022Mechanical SystemsNELSON LOPEZspecial
06/28/2022FinalNELSON LOPEZprogress
06/28/2022Shutoff dampersNELSON LOPEZenergy_progress
06/28/2022HVAC insulation and sealing NELSON LOPEZenergy_progress
06/14/2022HVAC insulation and sealing NELSON LOPEZenergy_progress
06/14/2022Mechanical SystemsNELSON LOPEZspecial
06/14/2022FinalNELSON LOPEZprogress
06/14/2022HVAC and service water heating equipment NELSON LOPEZenergy_progress
06/14/2022Shutoff dampersNELSON LOPEZenergy_progress
06/14/2022HVAC and service water heating system controls NELSON LOPEZenergy_progress
05/23/2022Seismic Isolation SystemsNELSON LOPEZspecial
05/23/2022Standpipe SystemsNELSON LOPEZspecial
05/23/2022Sprinkler SystemsNELSON LOPEZspecial
05/11/2022Seismic Isolation SystemsNELSON LOPEZspecial
Latest 25 of 68.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Public School 369-qEducation—
Project Q00348436 Alteration · LOC Issued · 05/14/2020
New York Hall of ScienceArts / Culture / EntertainmentFloors 1–3, Roof
Project Q00211858 Alteration · LOC Issued · 12/05/2019
Project Q00212371 Alteration · LOC Issued · 10/24/2019
Project Q00212412 Alteration · LOC Issued · 10/24/2019
Project Q00226553 Alteration · LOC Issued · 10/11/2019
Project Q00609110 Alteration · LOC Issued · 10/12/2021
Project Q00608455 Alteration · LOC Issued · 10/08/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 339 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch11
08/27/2026Q00609110-P1Request digital key ↗
08/27/2026Q00609110-I1Request digital key ↗
08/27/2026Q00609110-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/27/2026Q00212371-I1Request digital key ↗
08/26/2026Q00212434-P1Request digital key ↗
08/26/2026Q00212434-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/28/2026Q00226553-I1Request digital key ↗
08/26/2026Q00212412-P2Request digital key ↗
08/26/2026Q00212412-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/27/2026Q00212371-P1Request digital key ↗
08/27/2026Q00212371-I1Request digital key ↗
08/15/2026Q00212371-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/27/2026Q00212371-I1Request digital key ↗
08/27/2026Q00212371-P1Request digital key ↗
08/15/2026Q00212371-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/15/2026Q00211858-I1Request digital key ↗
08/15/2026Q00211858-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00348436-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION21
09/09/2025421737044Open ↗
11/03/2021421961782Open ↗
07/21/2021421737044Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION7
08/13/2021421961782Open ↗
08/12/2021421737044Open ↗
08/12/2021421737044Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
07/12/2023421903319Open ↗
▸BISCertificate Of Occupancy Application1
05/19/2022421737044Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE COMPLIANCE1
08/23/2023421961782Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/23/2022421737044Open ↗
▸BISZONING DIAGRAM1
11/08/2019421737044Open ↗
▸Seals & Professional Certifications82
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026Q00212412-P1Open ↗
09/02/2026Q00491145-I1Open ↗
09/02/2026Q00491145-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/28/2026Q00226553-I1Open ↗
08/28/2026Q00211858-P1Open ↗
08/28/2026Q00211858-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026Q00212412-P1Open ↗
09/23/2026Q00212412-P1Open ↗
09/01/2026Q00212371-I1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/02/2017421380801Open ↗
05/02/2017421380801Open ↗
05/02/2017421380801Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/02/2017421380801Open ↗
05/02/2017421380801Open ↗
▸BISDep Sanitary Sewer Certification Hcp Scp1
07/11/2022421737044Open ↗
▸BISSewer Connection Dep Sd1 Amp Sd21
07/13/2022421737044Open ↗
▸BISHvac Service Water Heating Equipment1
06/30/2022421737044Open ↗
▸BISHvac Service Water Heating System Controls1
07/05/2022421737044Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
01/04/2021421903319Open ↗
08/14/2019421737044Open ↗
▸BISSTREET TREE SIGNOFF1
03/16/2023421737044Open ↗
▸Energy Compliance17
▸BISTechnical Report Energy Code Responsibility5
02/24/2021421737044Open ↗
02/24/2021421737044Open ↗
01/27/2021421737044Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/02/2017421380801Open ↗
05/02/2017421380801Open ↗
08/14/2019421737044Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
07/01/2020421961782Open ↗
▸BISExterior Lighting Power1
07/05/2022421737044Open ↗
▸BISFenestration Areas1
06/30/2022421737044Open ↗
▸BISInsulation Placement R Values1
06/30/2022421737044Open ↗
▸BISAs Built Energy Analysis En21
07/05/2022421737044Open ↗
▸BISPreliminary Commissioning Report Certification1
05/20/2024421737044Open ↗
▸BISEnergy Code Compliance Inspections1
07/07/2022421737044Open ↗
▸BISAir Sealing And Insulation Visual1
07/05/2022421737044Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00212412-I1Open ↗
▸Inspections & Test Reports26
▸BISTechnical Report Responsibility11
08/11/2021421737044Open ↗
02/23/2021421737044Open ↗
02/09/2021421737044Open ↗
Showing 3 of 11 on file for this type
▸BISTechnical Report Responsibility Certification4
10/04/2019421737044Open ↗
08/19/2019421737044Open ↗
08/14/2019421737044Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
08/03/2021421737044Open ↗
05/10/2021421737044Open ↗
01/05/2021421737044Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/10/2021421737044Open ↗
01/05/2021421737044Open ↗
▸BISCONCRETE - PRECAST1
06/30/2022421737044Open ↗
▸BISWall Panels Curtain Walls And Veneers1
06/30/2022421737044Open ↗
▸BISDemolition Dm Job Signoff1
07/19/2022421737044Open ↗
▸BISTR21
08/02/2023421737044Open ↗
▸BISFire Resistant Penetrations And Joints Firestop1
07/05/2022421737044Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
06/30/2022421737044Open ↗
▸Approvals, Objections & Sign-offs65
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter23
08/28/2026Q00226553-I1Open ↗
08/27/2026Q00212371-P2Open ↗
08/27/2026Q00212371-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
08/27/2026Q00609110-P1Open ↗
08/27/2026Q00609110-I1Open ↗
08/26/2026Q00491145-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026Q00608455-I1Open ↗
08/13/2026Q00491145-I1Open ↗
08/13/2026Q00212371-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
08/13/2021421961782Open ↗
08/06/2021421737044Open ↗
11/30/2020421737044Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/23/2020421737044Open ↗
11/01/2019421737044Open ↗
08/14/2019421737044Open ↗
Showing 3 of 4 on file for this type
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)2
03/16/2023421903319Open ↗
07/01/2020421961782Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/18/2023421961782Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/01/2020421961782Open ↗
▸BISFINAL1
09/18/2023421961782Open ↗
▸BISSuperseding Letter1
05/10/2021421737044Open ↗
▸Cost, Insurance & Ownership7
▸BISProject Specific Gl Insurance3
08/12/2021421737044Open ↗
05/10/2021421737044Open ↗
02/24/2021421737044Open ↗
▸BISCOST AFFIDAVIT2
05/27/2020421961782Open ↗
05/02/2017421476432Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
07/12/2023421903319Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/09/2023421961782Open ↗
▸Filing & Intake Forms33
▸BISEFILING COVER SHEET15
05/26/2020421961782Open ↗
05/26/2020421961782Open ↗
11/12/2019421903319Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION14
08/30/2023421961782Open ↗
07/12/2023421903319Open ↗
07/11/2022421737044Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM4
08/13/2021421961782Open ↗
08/06/2021421737044Open ↗
05/10/2021421737044Open ↗
Showing 3 of 4 on file for this type
▸Other Documents15
▸BISBPP - SUPPORTING DOCUMENTATION5
07/12/2023421903319Open ↗
07/12/2023421903319Open ↗
01/04/2021421903319Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
12/24/2020421903319Open ↗
10/04/2019421737044Open ↗
08/14/2019421737044Open ↗
▸BISShutoff Dampers1
07/05/2022421737044Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
07/12/2023421903319Open ↗
▸BISDuct Design Insulation And Leakage Testing1
06/30/2022421737044Open ↗
▸BISFire Resistive Rated Construction1
06/30/2022421737044Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/04/2021421903319Open ↗
▸BISVestibules1
07/05/2022421737044Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/30/2022421737044Open ↗