Elevator apt, semi-fireproof with stores
46|06 Eleventh St. / Elleve LIC
46-06 11TH STREET · BIN 4435522
💬 Discuss this project
2023Year Built
8Stories
D7Building Class
M1-4/R7AZoning
84,568 sfGross Floor Area
61Units
LL97 Covered8 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: JNMY · 12,500 sf lot · 6.77 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsJnmy, LLC5 filings
RoofJnmy, LLC1p · 2 filings
Floor 1Curb cut1p · 2 filings
Site & exteriorJnmy, LLC8 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JNMY9907/08/2026
JMNY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
All City Engineering1012/05/2025
LMW Engineering Group605/30/2025
Synergic Design Architects103/20/2025
Just Consulting Engineering307/26/2024
Tohfaz Uddin PE606/19/2024
Ashraf403/04/2024
South Bay Engineering206/09/2022
Mohammad Ahead, PE303/31/2022
Raymond Chan Architect103/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Platinum Services NY1203/21/2026
LZ Consultants Service1203/21/2026
KD Designs203/21/2026
Raymond Chan Architect403/21/2026
Brooklyn Root Design303/21/2026
Green Studio403/21/2026
Expedite Dem203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mandarin Entprses IIGeneral Contractor1707/08/2026
Platinum Services NYScaffold1107/08/2026
AAA Total PlumbingFire Protection607/08/2026
Tri State Plumbing & HeatingPlumbing307/08/2026
Econair SupplyGeneral Contractor307/08/2026
Always First ServicesScaffold203/21/2026
Accord Power ElectricElectrical103/22/2026
Kings Group NYScaffold107/08/2026
Mandarin Entprses IIScaffold107/08/2026
Accord PowerGeneral Contractor104/09/2026
Nycom ElectricalElectrical103/22/2026
Atmos Electric SvceElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Just Consulting Engineering58651412/05/2025
Synergic Design8561103/20/2025
LMW Engineering Group279404/02/2024
Building Lifecycle
All (189)Filed (34)Permit Issued (38)Signed Off (16)Violation (20)Inspection (12)Objection (36)Special Inspection (30)Tax Incentive (3)
08/20/2026
Signed off — Alteration
Temporary standpipe for NB 440620874. No change in use, egress, or occupancy.
Q00717999-I1
08/18/2026
Signed off — Alteration
Q00756789-I1
04/24/2026
Signed off — Alteration
Q00704827-I1
04/20/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/25/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
01/22/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/13/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/29/2025
Signed off — Alteration
Install HVAC system for NB file in conjunction with NB#440620874. No change in use, egress or occupancy.
Q00652616-I1
12/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOJUN WANG
12/19/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
12/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOJUN WANG
12/19/2025
Special inspection requirement — Shutoff dampers
XIAOJUN WANG
12/19/2025
Special inspection requirement — Ventilation and air distribution system
XIAOJUN WANG
12/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOJUN WANG
12/19/2025
Special inspection requirement — Mechanical Systems
XIAOJUN WANG
12/19/2025
Special inspection requirement — Maintenance information
XIAOJUN WANG
12/19/2025
Special inspection requirement — Final
CALVIN TRAN
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
12/18/2025
Signed off — Alteration
Install plumbing system for NB file in conjunction with NB#440620874. No change in use, egress and occupancy.
Q00652625-I1
12/12/2025
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q08051677-I1
12/05/2025
Filed — Alteration
Install HVAC system for NB file in conjunction with NB#440620874. No change in use, egress or occupancy.
Q00652616-P3
12/05/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
12/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/04/2025
Signed off — Alteration
Installation of 4.05 kw solar energy system on roof. No change of occupancy, use or egress.
Q01195870-I1
12/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOJUN WANG
12/03/2025
Special inspection requirement — Final
CALVIN TRAN
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOJUN WANG
12/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOJUN WANG
12/03/2025
Special inspection requirement — Ventilation and air distribution system
XIAOJUN WANG
12/03/2025
Special inspection requirement — Maintenance information
XIAOJUN WANG
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
12/03/2025
Special inspection requirement — Shutoff dampers
XIAOJUN WANG
12/03/2025
Special inspection requirement — Mechanical Systems
XIAOJUN WANG
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
11/17/2025
Permit issued — Construction Fence
Q08051677-I1-FN
11/13/2025
Permit issued — Standpipe
Q00756789-I1-EW-SP
11/13/2025
Permit issued — Standpipe
Q00756789-I1-EW-SD
11/07/2025
Filed — Alteration
Install HVAC system for NB file in conjunction with NB#440620874. No change in use, egress or occupancy.
Q00652616-P2
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
11/07/2025
Special inspection requirement — Sprinkler Systems
XIAOJUN WANG
11/07/2025
Special inspection requirement — Post-installed Anchors
XIAOJUN WANG
11/07/2025
Special inspection requirement — Standpipe Systems
XIAOJUN WANG
10/23/2025
Filed — Alteration
Q00756789-P1
10/22/2025
Signed off — Alteration
INSTALLATION OF 6000 LB SINGLE PERSONNEL/MATERIAL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00951936-I1
10/22/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00810563-I1
10/22/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND NEEDLE BEAMS AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00988804-I1
10/21/2025
Signed off — Alteration
Structural work at roof top bulkhead facade, for installation of steel made mounted / rail system from which solar panel systems (by others) will be affixed to the vertical surface of the bulkhead facade. No change to use, egress or occupancy.
Q01228909-I1
10/16/2025
Permit issued — Curb Cut
Q00704827-I1-CC
07/07/2025
Permit issued — Structural
Q01228909-I1-ST
06/24/2025
Objection resolved — Addressed
06/19/2025
Objection resolved — Addressed
06/13/2025
Objection raised — Admin
06/13/2025
Objection raised — Inspections
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
06/10/2025
Special inspection requirement — Standpipe Systems
XIAOJUN WANG
06/04/2025
Filed — Alteration
Temporary standpipe for NB 440620874. No change in use, egress, or occupancy.
Q00717999-P1
05/30/2025
Filed — Alteration
Structural work at roof top bulkhead facade, for installation of steel made mounted / rail system from which solar panel systems (by others) will be affixed to the vertical surface of the bulkhead facade. No change to use, egress or occupancy.
Q01228909-I1
05/23/2025
Special inspection requirement — Post-installed Anchors
XIAOJUN WANG
05/20/2025
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offPlatinum Services NY11/17/2025
DOB NOWSprinklersSigned-offAAA Total Plumbing11/13/2025
DOB NOWStandpipeSigned-offAAA Total Plumbing11/13/2025
DOB NOWCurb CutSigned-offMandarin Entprses II10/16/2025
DOB NOWStructuralSigned-offMandarin Entprses II07/07/2025
DOB NOWSolarSigned-offAccord Power03/24/2025
DOB NOWMechanical SystemsSigned-offEconair Supply02/13/2025
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY01/13/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY01/07/2025
DOB NOWConstruction FenceSigned-offPlatinum Services NY11/24/2024
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY10/21/2024
DOB NOWPlumbingSigned-offDW Plumbing08/02/2024
DOB NOWStandpipeSigned-offAAA Total Plumbing07/25/2024
DOB NOWSprinklersSigned-offAAA Total Plumbing07/25/2024
DOB NOWStructuralSigned-offMandarin Entprses II07/12/2024
DOB NOWMechanical SystemsSigned-offEconair Supply06/06/2024
DOB NOWStandpipeSigned-offAAA Total Plumbing05/14/2024
DOB NOWPlumbingSigned-offDW Plumbing05/01/2024
DOB NOWMechanical SystemsSigned-offEconair Supply04/17/2024
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY01/16/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY01/10/2024
DOB NOWStructuralSigned-offMandarin Entprses II01/05/2024
DOB NOWConstruction FenceSigned-offPlatinum Services NY12/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY10/23/2023
DOB NOWPlumbingSigned-offDW Plumbing09/19/2023
DOB NOWStructuralSigned-offMandarin Entprses II08/09/2023
DOB NOWEarth WorkSigned-offMandarin Entprses II06/12/2023
DOB NOWStructuralSigned-offMandarin Entprses II06/12/2023
DOB NOWFoundationSigned-offMandarin Entprses II03/08/2023
DOB NOWStructuralSigned-offMandarin Entprses II03/08/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY01/13/2023
DOB NOWConstruction FenceSigned-offPlatinum Services NY12/29/2022
DOB NOWConstruction FenceSigned-offMandarin Entprses II06/10/2022
DOB NOWStructuralSigned-offMandarin Entprses II05/10/2022
DOB NOWEarth WorkSigned-offMandarin Entprses II05/09/2022
DOB NOWStandpipeSigned-offAAA Total Plumbing04/27/2022
DOB NOWSidewalk ShedSigned-offKings Group NY02/16/2022
DOB NOWConstruction FenceSigned-offAlways First Services01/12/2022
BIS—ISSUEDMandarin Entprses II01/13/2026
BIS—ISSUEDMandarin Entprses II12/05/2025
+ 16 more permits on file
1 project · most recent 06/04/2025
FiledStatusContractorScope
06/04/2025Signed-offAAA Total Plumbing2 outlets
7 projects · most recent 12/17/2025
General Wiring
FiledStatusContractorScope
12/17/2025CompleteEastern Electrical Construction—
12/01/2025CompleteAtmos Electric SvceGeneral Wiring
10/30/2025CompleteAccord Power Electric—
04/24/2024CompleteNycom Electrical—
10/23/2023CompleteIlluminous Electric—
01/18/2023CompleteIlluminous ElectricGeneral Wiring
02/23/2022CompleteHigh Quality Electric of—
1 project
Steel Wood
FiledStatusContractorScope
———Steel, Wood
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/20/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/25/2026Pass-Final SD - Fire PumpPassView ↗
01/22/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/13/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
12/05/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/06/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/14/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
10/02/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/03/2023Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
12/19/2025HVAC-R and service water piping design and insulationXIAOJUN WANGenergy_progress
12/19/2025Mechanical SystemsXIAOJUN WANGspecial
12/19/2025Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
12/19/2025Energy Code Compliance InspectionsXIAOJUN WANGprogress
12/19/2025FinalCALVIN TRANprogress
12/19/2025Maintenance informationXIAOJUN WANGenergy_progress
12/19/2025Ventilation and air distribution systemXIAOJUN WANGenergy_progress
12/19/2025HVAC-R and service water heating system controlsXIAOJUN WANGenergy_progress
12/19/2025HVAC-R and service water heating equipmentXIAOJUN WANGenergy_progress
12/19/2025Shutoff dampersXIAOJUN WANGenergy_progress
12/03/2025Mechanical SystemsXIAOJUN WANGspecial
12/03/2025Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
12/03/2025HVAC-R and service water heating equipmentXIAOJUN WANGenergy_progress
12/03/2025HVAC-R and service water piping design and insulationXIAOJUN WANGenergy_progress
12/03/2025Maintenance informationXIAOJUN WANGenergy_progress
12/03/2025HVAC-R and service water heating system controlsXIAOJUN WANGenergy_progress
12/03/2025Shutoff dampersXIAOJUN WANGenergy_progress
12/03/2025Ventilation and air distribution systemXIAOJUN WANGenergy_progress
12/03/2025FinalCALVIN TRANprogress
12/03/2025Energy Code Compliance InspectionsXIAOJUN WANGprogress
11/07/2025Post-installed AnchorsXIAOJUN WANGspecial
11/07/2025Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
11/07/2025Standpipe SystemsXIAOJUN WANGspecial
11/07/2025Sprinkler SystemsXIAOJUN WANGspecial
06/10/2025Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
Latest 25 of 78.
▾Documents — 295 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch35
08/29/2026Q00690337-I1Request digital key ↗
08/26/2026Q00652625-P1Request digital key ↗
08/26/2026Q00652625-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION20
02/04/2026440620874Open ↗
01/02/2026440620874Open ↗
12/29/2025440620874Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION7
07/29/2022440620874Open ↗
06/21/2022440620874Open ↗
06/06/2022421791305Open ↗
Showing 3 of 7 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/10/2014420522802Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM2
07/19/2023440620874Open ↗
02/17/2022440620874Open ↗
▸BISFLOOD ZONE COMPLIANCE1
12/06/2025440620874Open ↗
▸BISVERIFY TAX LOT1
02/27/2026440620874Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
02/15/2022440620874Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/17/2025440620874Open ↗
▸Seals & Professional Certifications98
▸DOB NOWDPL-1: Design Professional Seal & Signature34
08/26/2026Q00652625-I1Open ↗
08/26/2026Q00652616-P2Open ↗
08/26/2026Q00652616-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/01/2026Q00717999-I1Open ↗
08/26/2026Q00692151-P3Open ↗
08/26/2026Q00705196-P3Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
08/26/2026Q00692151-P3Open ↗
08/26/2026Q00705196-P3Open ↗
08/26/2026Q00705196-P3Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/06/2022421791305Open ↗
05/03/2022421791305Open ↗
01/07/2014420563367Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
01/27/2025440821933Open ↗
01/07/2022440701162Open ↗
10/11/2020440620874Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/27/2025440821933Open ↗
10/11/2020440620874Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/13/2012420522802Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/13/2012420522802Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/02/2025440620874Open ↗
▸BISSEWER CUT-OFF1
06/06/2022421791305Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/02/2025440620874Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST3
03/26/2025440821933Open ↗
01/27/2025440821933Open ↗
10/11/2020440620874Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/06/2022421791305Open ↗
05/06/2022440620874Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/06/2022440620874Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/26/2025440821933Open ↗
▸BISSTREET TREE SIGNOFF1
11/17/2025440620874Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/07/2012420563367Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/10/2024440620874Open ↗
05/06/2022440620874Open ↗
01/19/2022440620874Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00652616-I1Open ↗
08/13/2026Q00652625-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00652616-I1Open ↗
08/13/2026Q00652625-I1Open ↗
▸BISINTERIOR LIGHTING POWER1
12/02/2025440620874Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/07/2014420563367Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/02/2025440620874Open ↗
▸BISFENESTRATION AREAS1
12/02/2025440620874Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/02/2025440620874Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/02/2025440620874Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/01/2025440620874Open ↗
▸BISELECTRIC MOTORS1
12/02/2025440620874Open ↗
▸BISLIGHTING CONTROLS1
12/02/2025440620874Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/07/2012420563367Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/01/2025440620874Open ↗
10/10/2024440620874Open ↗
02/15/2022440620874Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT4
08/23/2026Q00705196-P2Open ↗
08/23/2026Q00705196-P1Open ↗
08/14/2026Q00705196-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
11/17/2025440620874Open ↗
05/06/2022440620874Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/06/2022440620874Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/02/2025440620874Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/01/2025440620874Open ↗
▸BISSOIL REPORT1
02/15/2022440620874Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q00705196-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00705196-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00705196-I1Open ↗
▸Approvals, Objections & Sign-offs25
▸BISSCHEDULE A - OCCUPANCY / USE10
02/04/2026440620874Open ↗
01/02/2026440620874Open ↗
12/29/2025440620874Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
06/06/2022421791305Open ↗
06/06/2022421791305Open ↗
06/06/2022421791305Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/11/2014420563367Open ↗
01/10/2014420522802Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/07/2012420563367Open ↗
01/13/2012420522802Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM2
06/06/2022421791305Open ↗
06/06/2022421791305Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01195870-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE2
06/06/2022421791305Open ↗
05/06/2022440620874Open ↗
▸BISCOST AFFIDAVIT2
01/07/2014420563367Open ↗
05/07/2012420563367Open ↗
▸Filing & Intake Forms16
▸BISBOROUGH INTAKE FORM5
07/29/2022440620874Open ↗
06/21/2022440620874Open ↗
06/06/2022421791305Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION5
11/24/2025440620874Open ↗
03/26/2025440821933Open ↗
08/16/2024440620874Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
04/11/2022421791305Open ↗
05/07/2012420563367Open ↗
01/13/2012420522802Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
01/27/2025440821933Open ↗
01/07/2022440701162Open ↗
10/11/2020440620874Open ↗
▸Other Documents11
▸BISAIR BARRIER CONTINUITY PLAN2
12/02/2025440620874Open ↗
12/02/2025440620874Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/11/2020440620874Open ↗
▸BISLOWEST FLOOR ELEVATION1
12/02/2025440620874Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/26/2025440821933Open ↗
▸BISVESTIBULES1
12/02/2025440620874Open ↗
▸BISMAINTENANCE INFORMATION1
12/02/2025440620874Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/26/2025440821933Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
12/02/2025440620874Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/02/2025440620874Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00705196-I1Open ↗